Implementing Gregorian Calendar Into Project - Date Formatting?
Sep 22, 2014
I'm a Java beginner and I'm having issues implementing Java's GregorianCalendar into my project. I'm writing to specific test code that passes arguments into an instantiated GregCal class. My problem is that I'm not sure how to pass the arguments through to my constructors and methods, or if I'm even supposed to do that at all. Date formatting is another issue, but I'll be glad If I can just get the dates in and back out. Here is some of the code:
Test code:
// Create a Student using the default constructor
Student newStudent = new Student();
GregorianCalendar dateOfBirth = new GregorianCalendar(75,7, 3);
newStudent.setDateOfBirth(dateOfBirth);
GregorianCalendar dateOfGraduation = new GregorianCalendar(90, 6, 10);
newStudent.setDateOfGraduation(dateOfGraduation);
Setter:
public void setDateOfBirth (GregorianCalendar dateOfBirth){
this.dateOfBirth = dateOfBirth;
}
I know that's not much to work with, but that's exactly my issue. I can't seem to find a reliable and UNDERSTANDABLE tutorial for java.util.GregorianCalendar anywhere. All of the existing documentation is beyond my grasp at this point. I'm assuming I need to declare and initialize MONTH, DAY, YEAR variables somewhere in order for the arguments to be passed through correctly. I'm just not sure where or how.
I am having trouble with getting output to be what I want. I can get the output when a user enters their values for month, day and time using a scanner object and they print correctly, but what I want is before they input values, to display the current date. Here is a snippet of what I am working with *these are in two separate files, the first has all the variables etc, the second has the main method.
In one java file:
Java Code:
private int numOfGuests, month, day, year; private GregorianCalendar eventDate = new GregorianCalendar(); public Event() { this("not assigned" , 0, new GregorianCalendar()); } public int getDay() {
[Code] ....
This gives me 0-0-0 as a result instead of current date.
I have two classes - a reservation class & a main class. Essentially, I want the user to enter two dates: an arrival and departure date. From the two dates, I will do a calculation (num days & price). I am having trouble finding a way to let users enter the (preferably in int, but that wasnt working),use getTime() to convert it from a calender to a date object. Then I want to use the dates to do a calculation. In addition, my constructor is being funky.
package hotelreservation; import java.util.Date; import java.util.Calendar; import java.math.*; //import java.text.*; public class Reservation
Given a Date such as this sampleDate (120, 08, 02), does SimpleDateFormat transform this given sampleDate using (sampleDate.get(Calendar.DATE)) ?
Issue is that without the SimpleDateFormat the days are outputting correctly but starting with 1,2,3,4 etc and when I apply the SimpleDateFormat to the above Date I only get 01,01,01 etc...
I am working on an application using JSP and SERVLET.
Somewhere I need to show the reminders on a particular date on calendar (Jsp page). I have used javascript for calendar and entering reminder from another UI. So I need to display an image on the calendar date which is matching with reminder date. The problem is how can I display the image on that date which is on calendar.
I need to add a few days to make an end date (for instance the start date is the first date selected, and then the end date is x amount of days after that... I think I should be using the add() method but I am not quite sure of where or how to do so)...
Java Code:
//Get an instance of Calendar and DateFormat class, and get current date from the system using OnClick method Calendar startVacation = Calendar.getInstance(); DateFormat fmtDate = DateFormat.getDateInstance(); DatePickerDialog.OnDateSetListener startVaca = new DatePickerDialog.OnDateSetListener() {
I have a gameengine stil partially in the works for pc made in java, I am attempting a port over to java but certain classes and other fuctions are not available for android that there is in java. this means that my render engine, gameengine and a couple of other clases therefore don't work.
My question is, is there anyway of using the gameengine classes that work into the project so that all i have to do is declare within the engine what i want to export for wheather this is android or java. or importing packages from the game engine project and directly linking with the ability of re-writing the odd few classes that do not work.
I am using the calendar component of the primefaces and I am using the attribute pattern="MM/dd/yyyy.But when I print the values in my MBean along with the selected date event the timeZone (i think) is printed as Sun Mar 29 00:00:00 IST 2015 I do not understand why its printed even though I have set the pattern.Part of my code :
i downloaded a sample database code of an online payroll system. How can i assemble it to know how it works. the files include php and mysql files. it is to build an online payroll system
I have an requirement of splitting a Date-Time String i.e. 2013/07/26 07:05:36 As you observe the above string has Date and Time with space in between them.
Now I want just want split the string not by delimiter but by length i.e. after 10th place and then assign it to 2 variable i.e. Date <----2013/07/26 and Time <---07:05:36 separately.
1. Write an algorithm that asks the user for your birth date and the current date and displays how many days has passed since then (remember that April, June, September and November has 30 days, February has 29 on leap years, and the rest 31)
2. Write an algorithm that asks the user a number (save it as N) and displays the N term of the Fibonnacci series (take it as 1, 1, 2, 3, 5 ...)
I tried many times to return a string from java project to an android project But it keeps sending incorrect values as in 2 as it should be 1 here is an example.
How do i make the 'date' column show only the date and 'timeIn' and 'timeOut' column only show the time. In my database table my 'date' column is a date type and 'timeIn' and 'timeOut' column is time.
I would like to set a specific time for a Calendar instance. My below code will set a time one minute ahead of the current time, and format it to ISO8601 standard.
I now want to set another variable(deadlineDate), but to a specific time, say 5 minutes ahead. I would like to hardcode this in so I dont want it to change as a result of getting the instance of the Calendar(which sets it to the current time)
Essentially I am trying to regenerate the above code every minute and increment itself each cycle until it reaches the deadlineDate, which is a fixed datetime.
import java.util.Calendar; import java.util.GregorianCalendar; public class CalendarCalc { public CalendarCalc (){} private static void printCalendarMonthYear (int month, int year)
[Code] .....
IDE is telling me this:
Exception in thread "main" java.lang.Error: Unresolved compilation problem:
The method printCalendarMonthYear(int, int) is undefined for the type CalendarDisplay
at CalendarDisplay.main(CalendarDisplay.java:46)
Btw, I have a main class. This is just the class responsible for doing calculations.
I'm having an issue with this little bit of conversion. I'm converting a string (_dateString) into a Calendar time. I am using DateFormat and SimpleDateFormat to accomplish this task. Everything seems to be working great, except for it figuring out whether it is AM or PM. According to SimpleDateFormat (Java Platform SE 7 ) I am using "aa" to get my AM or PM marker. How come in my output then, it believes it to be 4:45 am instead of 4:45 pm? Hour of Day should return the 24 hour clock, which should show 16 instead of 4. I have posted the output below my code.
Java Code:
import java.text.*; import java.util.*; public class Time{ static String _dateString = "08 Feb 2014, 4:45pm"; public static void main(String args[]){ Calendar cal=Calendar.getInstance();
[Code] ....
Output:
Java Code:
Today is Sat Feb 08 04:45:00 EST 2014 Year: 2014 Month: 1 Day of Month: 8 Day of Week: 7 Week Of Year: 6 Week of Month: 2 Hour: 4 Hour of Day: 4 Minute: 45 Second: 0 Millisecond: 0 mh_sh_highlight_all('java');
i have a problem, i need build a calender in BlueJ. The program need to found if I put this one year have to give me the full schedule but only the first semester.
I am currently using notepad to create a Java program and using the command box to compile it and execute it and it has been working fine. I have the JDK version 7 so java.lang works which I know does not need to be imported. The Calendar method which should be recognized is not.
Here is the program. Cut this program and compile it in the command box. It will not recognize the Calendar method.
import java.util.*; class Practice4_2 { public static void main (String args[]) { Calendar cal = Calender.getInstance(); Date.now = new Date();
I created a calendar program so when the user enters a day number and a year it would show the calendar for the year . My issue was that I could not get the numbers to line up neatly and how they should look . Also if its not to much trouble I would like to know how to turn this in to a loop .
import java.util.Scanner; public class Calendar { public static void main(String[] args) { Scanner scanner = new Scanner(System.in); System.out.println("Enter a Year"); int Year = scanner.nextInt();
I'm working on a program that prompts the user to enter the year and first day of the year and displays the calendar table for that year on the console. For example, if the user entered the year 2005, and 6 for Saturday, Juanuary,1, 2005, the program should then display the calendar for each month of the year.
I have written the program and solved the problem for the most part. Only, I'm having terrific difficulty getting the output to properly format. I'm *almost* there. I'll post my program below and then output.
import java.util.Scanner; public class DisplayCalendar { public static void main(String[] args) { Scanner scanner = new Scanner(System.in); System.out.print("Enter the year: "); int year = scanner.nextInt();