Calander Control W/ Scheduling HELP!

Aug 1, 2005

I have never used the calander control in access I am Very new to Access code as well. But I am Learning.

This is what I am trying to do

I have a Customers tbl and a Salesmen tbl

I would like to have a calander that I can use to set appointments for multiple salesmen in a form. I have looked at the calanders posted here and now of them do anything like what I am trying to do. Is this possiable to do?

Thanks in Advance for helping a newbie
:confused:

View Replies


ADVERTISEMENT

Updatable Active X Calander

Mar 9, 2005

Is there a calander that I can put on my form that will update to current date when I open form

Gary

View 2 Replies View Related

Popup Calander In Subform

Aug 19, 2005

Greeting
i'm kind of a rookie with access : )

i'm using the attached popup calander in my form and subform ,,,
it works perfect in my form
but when using in the subform, i get an error saying "the specified form can't be found"

if i open the subform as a form it works

so my question, is do i have to change anything in the calandar code so it could open in subform as well ??

if yes how ?

thanks in advance

View 6 Replies View Related

Popup Calander Problem

Sep 29, 2006

I have a popup calendar which works perfect on my form but will not work in an imbedded sub form.
If I go to the sub form itself it works perfect both in datasheet view and Form view. But if I go to the main form which this same sub form is imbedded (datasheet view) it does not work. The calendar appears on double click but date does not update when clicked.
The code in on dbl click is =opencalendar("")
Anyone know what I am doing wrong please ?
Rgds Roc

View 2 Replies View Related

Developing A Table Using The Calander Function

Aug 8, 2007

I am working on developing a time table for my mothers day care to include payments due, total payments for the tax year and a few other items. The issue I am having is developing the table to track when the children are present. I would like to use the built in calander function in which I can click on the days of the week the children are present and store this into a table as a yes no for each day. Once the data is stored in a table, then I can convert this information into a billing cycle and then go from there.

Thanks in advance,
Mike

View 1 Replies View Related

Scheduling Database

Jun 1, 2006

Hi all, I'm just starting on a new project to create a scheduling database for a small company (about 20 people). What i aim to do is to edit calander entries (Month view) and view calander entries hopefully using a control that looks as much like Outlook as possible again this would hopefully show what these 20 people are doing over the month.

My question is: Can you use outlook to do this, or would you have to use a control and does anyone know what/how to use this control.

Any help will be greatly appreciated!

Matt

View 1 Replies View Related

WorkForce Scheduling......

May 14, 2007

HI All....

I have a question which I believe I may already know the answer to but Here it goes. I am trying to create a db that can track and employee shift schedules. I have 28 employees and we work 24X7 so we have 3 shifts, days, evenings and night. I cant seem to get my head around how I would create it. I have tried like 10 different ways but I keep running into Form limits. They want to be able to schedule for the whole year out by month. I have attached a sample of what they want it to look like. If anyone knows of anything out there or could assist me in at least a correct starting point, I would be forever in debt to you.

Thank you for taking the time to read this post and I look forward to hearing from you.

View 3 Replies View Related

Room Scheduling

Nov 8, 2005

Can anyone point me in the direction of a room scheduling example or a tutor site. I originally wanted to use Outlook but my boss, after seeing another Acces Project I did, asked for it in the Access. I can build a basic data base on a daily basis showing rooms against hours, but my problem is forward scheduling eg "every Thursday meeting room 1 will be for Group A" etc. Can anyone please get me started - I'm tearing my hair out on this one!

Thanks in advance.

Peter

View 1 Replies View Related

Scheduling Software Needed

Jul 13, 2006

I am looking for some scheduling software to meet the following requirements:

The ideal requirements for a new scheduling tool would be:
•More robust than LaunchPad, but less complicated that Maestro
•ability to initiate specific Access macros (not using an autoexec macro) REQUIRED
•must provide detailed audit logs to show success or failure of each job REQUIRED
•ability to monitor shares for files or file changes
•Networked version for shared access?
•Must be controlled from within the team

Does anybody have any suggestions?

Thank you.

View 4 Replies View Related

Calendar: Scheduling Meetings DB

May 11, 2007

;)
Hello Guys:

I need help creating a small Access Database to be able to make Schedules for Conference table Meetings. I am hoping to find an example, or if someone could please direct me to the right place where it’s been done before in Access 2000!?

I was asked to use this Calendar: (“Calendar Control 9.0”) because all my co-workers have this Active X Control, which has Dates but not Time in and Out. I need to add Time or think of some other general Control, to add to this Database along with the Date Calendar.

What my co-workers would like to do is to go inside the Database > choose their Name > pick a Date in a Calendar > pick a Time to RESERVE the meeting > place/ location, etc.

The only thing right now I have is a Table for the Users, and I also need to figure out how to place it in the DB for other people to select their name and precede with other options.

I need to make the DB recurring (like Outlook), notifying (e-mailing) of weekly Staff Meetings, for EX: every Wednesday for next months. So that next time, when somebody goes into the Database, they can see what Time slots are taken or Available on the Calendar. We tried this with Outlook, but it didn’t work due to the Conference table not being customized and not listed in the Company address List. Don’t mean to make it confusing - basically Outlook seems to be out of the question for my Group, therefore I was asked to look into Access :) .

I don’t even know where to start. Can someone please help me modify this or I would be glad if you provide an Example for me to visualize where to start? In this Calendar, people want to be able to choose Hours. In addition, I need help with aesthetics for the Database tables, queries, forms/ Switchboard.

Please let me know if you have any questions.
Thanks a bunch in advance,
Beginner:confused:

View 2 Replies View Related

Employee Scheduling Database

Feb 24, 2008

Dear Access Expert.

I would like to create a Scheduling database for employees. The database would include:

- list all of the employees
-tabs to look at schedule for this week, 1 week from now, 2weeks from now, 3 weeks from now, long term (1-2 months), etc
-small comment section within each day for the guys to enter some comments...e.g. dentist at 10, holidays, etc

There has to be something like this already out there that I can modify and work with. Is there anything like this already in the NorthWind Database that comes with Access? What about some free examples Access developers made?

What about Outlook? Can I modify Outlook and use VBA somehow to accomplish this? Outlook is basically on an account basis so I don't know if I could tailor it to my 30+ employee database.

Thank you very much for your input.

View 2 Replies View Related

Solution For User Scheduling

Dec 30, 2004

Hello All
I am in need of a lot of help. The situation is as follows I have a table with users that have certain classes that they have to take and in another table I have the dates that these classes are offered. My problem is I want to find a way to map all the students to their required class by scheudling them into the required classes taking into account date conflicts and classes required before taking a certain other classes. I guess my question is if there is any possible to do this in access without me phyically having to schedule each users required classes to the correct time making sure there are no date conflicts. Any help would be highly appreciated because we are talking about 3000 users that need to have schedules and that is extremly time consuming if I have to sit here and do the schedule for each user. Thank you in advance for your time

View 5 Replies View Related

Add A New Section / Area For Scheduling

Feb 12, 2015

I need to make a random schedule every week. I have a new DB that I have attached and the current one being used that was built by some one else. The reason for building the new one is I could not figure out what to change to add a new section/Area for scheduleing.

What I have are 3 levels of auditors

Level 1 are the basic auditors which I will need 1 per shift per day
Level 2 Are operationl Auditors I will need 2 of the per week
Level 3 are management auditors and I need one of those per week.

When I get these compiled per week I will need to make a report to e-mail out.

I attached both DB's the old one to show what I need, and the new for a more stripped down and easier to update version.

View 14 Replies View Related

Appointment Calendar Scheduling

Aug 17, 2011

I'm putting together a Customer Management dbase, in Access 07, and one of the tables is dedicated to scheduling (and the outcome) of customer appointments.

The tables I'm hoping to get a solution for are:

1: Customer Master Data (parent): contains fields such as Name, Address, Phone #, email etc

2: Appointment Master (child): there are 4 Appointment tables/queries, one for each of the available product groups, and contain such fields as Product Type, Lead Source, Lead Status, Appointment Date, Appointment Time, Sales Rep, Appointment Comments

What I am trying to do is find a solution as described below:

1: When the appointment is created the appointment is then pushed into Outlook 07; along with various customer information from the Customer Master table

2: OR is there an appointment/scheduling calendar, preferably with the same look/feel of outlook, available that forms part of the access 07 dbase? This is probably the preferred solution.

View 4 Replies View Related

Scheduling Access To Open And Run A Routine

Mar 6, 2006

Hi,

I was wondering is it possible to schedule in windows somewhere to open up my syncfrontend.mdb and then run a routine that i have written inside of that mdb.

The routine is a huge database syncronisation task that needs running every hour, it's all there ready to be run but just need a way to get to it and run it automatically on the hour every hour.

Any ideas or help would be greatly appreciated!

Thanks in advance

View 2 Replies View Related

Calendar Odject For Scheduling Holidays

Mar 9, 2006

Hi All,

Does anyone know of a good free calendar object that I can dynamically add text too, for a holiday planning database I'm making.

Thank You

View 9 Replies View Related

Creating Appointment Scheduling Form

Sep 6, 2006

HI all, Im fairly new at Access, nut ive been given the task of creating an appointment scheduling form, so that we can schedule a client for an appointment via this form.

The idea i had in mind was to use a calendar to query the appointments table so that we can view all appointments for any particular day.

any suggestions?

View 3 Replies View Related

Scheduling Form With Calendar And DESPERATE

Sep 20, 2004

Here is my problem. I am hoping that someone here can be my hero on this one.

I am trying to figure out what would be the best possible way to track my hospital's staffing. I need a form that I can click on the Active X calendar and have it populate the staffing table. I have built the code and it works great.

The problem is that the way the code works now, I have to have a field in my table for every single date scheduled. For example, right now, I have the staffing table like this:

Name
Date Scheduled
Date Scheduled1
Date Scheduled2
Date Scheduled3

Of course, after a month, an employee will have worked more than four shifts. I really don't want to add a field for every shift they could have worked because then, after a month, I'll have thirty date fields, and after a year, I'll have 365. So, do you have any ideas about how I can do this without having 365 date fields?? Thank you! If you can help me figure this out, you are my hero.

KellyJo

View 11 Replies View Related

Tables :: Scheduling Table With Exceptions In Database

Apr 9, 2014

I have a normal schedule table in my database that stores the open/close hours for each business unit location.

The problem is some locations are timeshares and some have different business units every other week, every 2 Tuesday, the 1st and 3rd weeks of the month.

I figured I would make an exception table noting all of these somehow and after building a calendar/report plug in the exceptions.

View 4 Replies View Related

Assigning More Than One Person To Specific Patient In Scheduling?

Feb 1, 2013

I am creating a scheduling database for patient home visits and need to see specific people assigned to one visit, and it will always be at least 4. Could I create a drop down list that will show all team members? How would I design the scheduling table to have multiple people for one scheduling record? I have table for Teams and one for Team members, but when creating the appointment form realized I will only see one team member assigned to one specific appointment.

View 1 Replies View Related

Gantt Chart - Visual Scheduling Display

Jul 24, 2015

I'm able to create a gantt chart template in excel that will use date information to visually display the upcoming work. That's great, its exactly what I need. I'm unsure how to implement it.

The question is: Do I need to export data and have it generate these excel reports, or can I have it done in access somehow?

Either way that I do it I'm not sure where I'm going. I imagine its quite easy to export data to work with but I don't want to be spending time on access/excel creating a solution which isn't the best one.

View 13 Replies View Related

Modules & VBA :: Form For Scheduling Appointments - Display Timeslot In Combobox

Jan 3, 2014

I created a form for scheduling appointments on access 2013 using a youtube tutorial. I got most of it work apart from the combo box that functions in a way that once the time slot has booked with a client it should no longer be shown in the list.

E.g.:-2/2/2014 10:00AM is already booked with a client

The combo box should no longer display the 10:00 AM timeslot but can be shown on other days

Below is the VBA code that i typed out. How to create the code to make the combo box work in that manner.

Option Compare Database

Private Sub cboTime_Enter()
Dim i As Date, n As Integer, oRS As DAO.Recordset, sSQL As String
Dim dLowerbreak As Date, dUpperBreak As Date, dDuration As Date
Dim dLowerPrecision As Date, dUpperPrecision As Date
cboTime.RowSourceType = "Value List"

[Code] ....

I found out that the combo box does not work like it does in the video i.e the option does not dissaspear even though their has been a booking with that time slot with another client.

Coding that is required to make the combo box work like that or is their an error within the code that is preventing the combo box to work in such manner ...

View 14 Replies View Related

General :: Scheduling Meeting Appointment Through Access Command Button

Mar 20, 2014

I am trying to create a command button in Access to generate a Meeting Invite. I found code for creating an Appointment and it works great but cannot get it to invite attendees.

Private Sub AddAppt_Click()
On Error GoTo AddAppt_Err
' Save record first to be sure required fields are filled.

[Code].....

View 1 Replies View Related

Queries :: Job Scheduling Database - Output Unique List Of Weeks

Sep 1, 2014

I'm writing a simple job scheduling database, so I've got resource availability (by week) and job list (by week). I've written a single-column query whose only output is a unique list of weeks with resources available, and another single-column query whose only output is a unique list of weeks with at least one job allocated.

How do I join these so that I can get a single-column list of weeks that have either (or both) of resources and jobs?

So Query1 returns:
25/08/2014
08/09/2014
15/09/2014

while Query2 returns:
01/09/2014
08/09/2014
15/09/2014
22/09/2014

I want query3 to return:
25/08/2014
01/09/2014
08/09/2014
15/09/2014
22/09/2014

View 5 Replies View Related

Modules & VBA :: Scheduling System That Automates Some Redundant Tasks - Expanding Subforms?

Jul 28, 2014

I'm working on a scheduling system for my fathers company that automates some redundant tasks. Most importantly the system manages the order of processes on different parts (ie, part "tubes" may be cut, then drilled, then welded, then shipped).

I'm trying to create a form that allows for the editing and viewing of all the parts and the processes for each part for a specific work Order. Ideally the information that applies to all the parts (Work order Number, due date etc) would appear at the top of the form with all of the processes to appear beneath (Separated into groups - all the parts to be welded shown together). My problem with using sub forms for this was that I need all the records to be shown without scrolling. Is there a way to dynamically change the size of each Subform to match the required size, or is there a better feature to use?

View 7 Replies View Related

Forms :: Invalid Control Property - Control Source

Sep 24, 2013

I added a new field to one of my tables and query, but when I try to add a control for that field into my form it is not recognising it and the field isn't appearing in the sources for the form, even though the table is sourced to the form? Or am I going to have to do the usual and redo the entire form because I made a minor adjustment?