Calculate Work Hours Excluding Weekends.

Feb 16, 2006

Let me just start out by saying that when it comes to Access, I ride on the "little bus", so I apologize in adavance if this is a lame question.

I have a table with two date/time fields. One for reporting the date and time of an issue start, the other for the date and time of an issue ending. I'm trying to find a way to get the number of hours between the two without including weekends. I found a module on mvps.org that excludes workdays. However it doesn't seem to work in this case. For instance, if I put in an issue start as 02/10/2006 7:30 am, and the issue end as 02/13/2006 6:45 am, it only counts it as one workday. It won't count the 13th as a workday until the time is >= 7:30 am.:confused:

I'm simply stumped. Any help would be greatly appreciated.

Thank you,:)

View Replies


ADVERTISEMENT

Reports :: Time Difference Excluding Weekends And Holidays In Hours From Now

Sep 6, 2013

I would like to add time elapsed since an entry was made excluding weekends public holidays and calculating 8 hours a day (from 6am to 2 pm) since the entry was made till the generation of the report.

How shall I approach this in terms of programming ?

View 1 Replies View Related

Calculate Date Difference Excluding Weekends

Apr 25, 2014

I am trying to Calculate the Date difference between "Material Submit Data" and "Current Date" excluding Weekends.

View 2 Replies View Related

Modules & VBA :: Calculate DueDate Excluding Weekends And Holidays

Jul 31, 2014

Currently I use a module to calculate DueDate, excluding weekends and holidays. I store all the holiday in a tblHoliday and reference this table in the module. A formula then calculated the DueDate. This works great in an access form, but I now realize that I need that value stored so it appears on the table as well, but do not know how to accomplish this.

View 9 Replies View Related

Setting Dates Excluding Weekends.

Jan 10, 2008

Hello all,

I am a bit stuck in my query. I need to setup a Next Follow-up date based on the last follow-up date excluding weekends.

For example: Last Follow-up: 1/10/08.

Next follow-up should be 5 days after that. So it should be: 01/17/08.

I have a calculated field that calculates the number of days (Counting off weekends) but I can't seem to have the date setup correctly.

Thanks

View 7 Replies View Related

Calculating Date Difference Excluding Weekends In Access

Aug 8, 2006

I have a query that is looking to calculate staff absence.

Absence Start date & Return to work date

Looking to calculate number of days (not a problem) but to exclude weekends ie saturday and sunday ????

Not sure if this can be done --- any assistance would be greatly received.

thanks and regards

ian watson
Yarm Cleveland UK

View 10 Replies View Related

Queries :: Date Difference Excluding Weekends And Holidays

May 6, 2014

Is there a way, in a query or via the use of a module, to calculate the workdays between two dates excluding holidays without needing to maintain a separate table with the holidays listed out?

For example, I would like it to calculate 21 work days for the month of May. However, I don't want to have to go in the first of each year and manually list out all the holidays for the year. Is there a way for the Holidays table to just contain the number of holidays in a given month (i.e. in December we get 3 holidays (Christmas Eve, Christmas Day, and New Years Eve).

View 5 Replies View Related

Get Date (minus One Day) Excluding Weekends And Holidays In SQL Query To Use In Access

Oct 11, 2012

I am trying to limit the results of a SQL query by date. I would like to take the current date from the system clock, move back one day, check to make sure it's not a weekend or holiday, then use the result date to limit the results in my Query. If the current date minus one day happens to land on a weekend, the date picked should be the Friday before the weekend. If the current date minus one day lands on a holiday, it should be the date before the holiday as long as it is not a Saturday or Sunday (on another holiday) .

Here is my SQL query right now.

SELECT DISTINCT (Mid(ClientDiv.Client_Division,1,3)) AS ABC, RTIClientTracker.EMB_OOB, RTIClientTracker.OOB_Fixed
FROM ClientDiv INNER JOIN RTIClientTracker ON ClientDiv.ID = RTIClientTracker.Client_Division
WHERE (((RTIClientTracker.Division_Region)='RTI') AND ((RTIClientTracker.Cut)>=Date()-1))
ORDER BY (Mid(ClientDiv.Client_Division,1,3));

It limits what it selects by using the current Date minus one day.

I need to skip over Saturdays, Sundays and Holidays.

View 8 Replies View Related

Queries :: Subtract 8 Hours Of Work From Result Hours

Nov 29, 2014

I want to subtract 8 hours of work of the Result of employee work hours/

There is attachment...

View 3 Replies View Related

Modules & VBA :: Calculate A Field That Excludes Weekends And Holidays - Code Error

Sep 24, 2014

I am using the function below to calculate a field that excludes weekends and holidays. The weekends are excluded as it is now, but when I try to add in code to exclude holidays I am getting errors. The code for the holidays is in bold and a couple of the errors are Loop without Do so I remove the Loop then I get a Else without If.

Code:
Option Compare Database

Public Function WorkingDays(Due_Date As Date, Result_Date As Date) As Integer
'-- Return the number of WorkingDays between Due_Date and Result_Date
On Error GoTo err_workingDays

[Code] ....

View 6 Replies View Related

How To Calculate Business Hours!

Oct 27, 2006

I need to calculate the difference between to datetime fields. However, i need to exclude weekends, holidays and non-business hours. I also need to return the result in hours, minutes, seconds.

can this be done. if so, does anyone know how to do this, or is there code that i can implement and save for future uses.

thx,

john

View 1 Replies View Related

Creating Database To Track Work Hours?

May 8, 2013

I have been using Excel to keep a daily track of when people are in to work, but the number of persons employed has increased and it is taking too much time to manually input data into the sheet.

I am looking at Access and I would like to know if what I want is possible.

The fields I would need are , Name , Date , Time worked(1 for a full day and 0.5 for a half) , Reason worked, and funded by(inside/outside organization)

I would like to make a template of form that has the following options.

1. The ability to select a date (possibly through a calendar selection)
2. Select one or multiple different persons from a list
3. Possibly two check boxes (full/half day) - that when selected input a 1 or 0.5 into the database
4. A text entry for reason worked.
5. Another check box for inside/outside funding that reflects the time worked in step 3 and that can be queried to see how many total days funding was given.

View 2 Replies View Related

Calculate Total Hours (for All Employees) On Each Department?

Sep 28, 2005

Hello, i have a table with the fields: "employee_number", "shiftdate" "department" "basic_hours", and "over_time"

And a query named "employee_hrs" looks at the fields in this table, i would like a new field in the query to be able to calculate the total hours for all employees together but for each department.

eg the total of: basic hours + overtime for department A)
the total of: basic hours + overtime for department B)
and so on for each department

would only like to show one instance of a department (distinct) with the total hours done by all employees for that department?, if any one could please help me out that would be great!?

View 3 Replies View Related

Queries :: Calculate Time Period For 24 Hours?

Jul 9, 2014

I have designed an access application that logs emails that come into a department. However, the team leader has asked me to create a report to work out if emails were answered within a 24 hour period.

Is there a method to do this. It is not something I have attempted to do within access before.

View 6 Replies View Related

Modules & VBA :: Adding Time With Work Hours Function

Sep 13, 2014

In my DB that we use and a workflow tool, some of our work has and due date and time.If we get the complete_package our work time starts and we have X amount of time to complete our work. This is something i worked on but set it aside, now i am coming back to try and fine tune this so it returns a more accurate value.

So if we receive and [Date_Complete_Package_Received] at 09/13/2014 09:00:00 AM and based on the work being done we have 5 hours to complete the work, then the [Date_and_Time_Complete_Package_DUE] would be 09/13/2014 02:00:00 AM. That part is simple and i have coding that does that just fine. [SLA_Time] is where it gets the amount of time allotted, we have 5,10,12,14,and 16 hours depending on what is being done.

Code:
Me.Date_and_Time_Complete_Package_DUE = DateAdd("h", [SLA_Time], [Date_Complete_Package_Received])

This is done on AfterUpdate of a field on one of my forms and it works the way it is but what i need is to be able to run this through my Workhours Function so i am not getting values that our in off hours.The following doesn't work i know i can't use the Workhours function with the DateAdd but this is just to show what i am trying to do.

Code:
Me.Date_and_Time_Complete_Package_DUE = WorkHours(DateAdd("h", [SLA_Time], [Date_Complete_Package_Received]))

I have a Workhours module and it is used for a lot of things and it works perfectly.

View 1 Replies View Related

How I Can Calculate Correct Total Hours In MS Access 2003

Jul 26, 2006

I have a problem with Microsoft access 2003. I want to design a Check in/Check out Time Data base for my university final term project. In this data base I need to show the total of the working hours of each personnel in a month.( for instance: 124 hours and 55 minutes in one month). But adding up the hours, when the time variable reaches 24 then time automatically goes back to 01:00. As a result, the correct total hours cannot be calculated....

View 1 Replies View Related

Count Work Days - Calculate Difference Between Two Dates

Jun 8, 2015

How can I calculate the difference between two dates but I only want to count the work days? So if was today and I wanted to go until 6/15/2015 the difference would be 5 and not 7 because I do not want to count Saturday or Sunday. Is there a special %datediff function where I would only count work days?

View 4 Replies View Related

Query To Exclude Weekends....

Jun 30, 2005

Hello I am new to this site as well as MS Access and SQL. So any help would be appreciated. Sorry if this is too drawn out. I have this query that returns the previous business day's(Monday through Friday) number of docs sent from my department to another department. I would manually go into the SQL view in Access and change the date to yesterday. The easy part was having the code do the previous day. The problem comes Monday morning when the code does the previous day. It will do Sunday which will return nothing since I really want Friday's numbers. I am trying to figure out how to take into consideration if the query is run on Monday morning and to automatically choose Friday. I checked out DayOfWeek() and Case When condition statements but really unsure about syntax and whatnot. Here is the SQL view of the query...

SELECT Count(WS_FORM_TEMP.FORM_TEMP_ID) AS CountOfFORM_TEMP_ID, WS_FORM_TEMP.FILENET_DOC_ID, WS_FORM_TEMP.LINKED_FILENET_DOC_ID, WS_FORM_TEMP.SSN, WS_FORM_TEMP.FORM_TYPE, WS_FORM_TEMP.RECEIVED_TYPE, WS_FORM_TEMP.DET_ACCT_NUM, WS_FORM_TEMP.DET_ACCT_NUM_CORR, WS_FORM_TEMP.SEQUENCE_NUM, WS_FORM_TEMP.CLAIM_EFFECTIVE_DATE, WS_FORM_TEMP.EMPLOYEE_START_DATE, WS_FORM_TEMP.EMPLOYEE_END_DATE, WS_FORM_TEMP.VACATION_PAY_FLAG, WS_FORM_TEMP.RETIREMENT_BENEFITS_FLAG, WS_FORM_TEMP.SEVERANCE_PAY_FLAG, WS_FORM_TEMP.SIGNED_RELEASE_FLAG, WS_FORM_TEMP.EMPLOYER_CONTACT_NAME, WS_FORM_TEMP.EMPLOYER_CONTACT_PHONE, WS_FORM_TEMP.EMPLOYER_CONTACT_PHONE_EXT, WS_FORM_TEMP.EMPLOYER_CONTACT_FAX, WS_FORM_TEMP.DUE_DATE, WS_FORM_TEMP.COMMENTS_FLAG, WS_FORM_TEMP.ATTACHMENTS_FLAG, WS_FORM_TEMP.POSTMARK_DATE, WS_FORM_TEMP.RECEIVED_DATE, WS_FORM_TEMP.CREATED_DATE, WS_FORM_TEMP.WAGE1_END_DATE, WS_FORM_TEMP.WAGE1_WAGE, WS_FORM_TEMP.WAGE2_END_DATE, WS_FORM_TEMP.WAGE2_WAGE, WS_FORM_TEMP.WAGE3_END_DATE, WS_FORM_TEMP.WAGE3_WAGE, WS_FORM_TEMP.WAGE4_END_DATE, WS_FORM_TEMP.WAGE4_WAGE, WS_FORM_TEMP.WAGE5_END_DATE, WS_FORM_TEMP.WAGE5_WAGE, WS_FORM_TEMP.WAGE6_END_DATE, WS_FORM_TEMP.WAGE6_WAGE, WS_FORM_TEMP.WAGE7_END_DATE, WS_FORM_TEMP.WAGE7_WAGE, WS_FORM_TEMP.WAGE8_END_DATE, WS_FORM_TEMP.WAGE8_WAGE, WS_FORM_TEMP.SEP_LAIDOFF_FLAG, WS_FORM_TEMP.SEP_LAIDOFF_RECALL_DATE, WS_FORM_TEMP.SEP_QUIT_FLAG, WS_FORM_TEMP.SEP_DISCHARGED_FLAG, WS_FORM_TEMP.SEP_SUSPENDED_FLAG, WS_FORM_TEMP.SEP_CONVICTION_FLAG, WS_FORM_TEMP.SEP_PERFORMANCE_FLAG, WS_FORM_TEMP.SEP_STRIKE_FLAG, WS_FORM_TEMP.SEP_ABSENCE_FLAG, WS_FORM_TEMP.SEP_ASSURANCE_FLAG, WS_FORM_TEMP.SEP_EMPLOYED_FLAG, WS_FORM_TEMP.FORM_ID, WS_FORM_TEMP.STATUS
FROM WS_FORM_TEMP
GROUP BY WS_FORM_TEMP.FILENET_DOC_ID, WS_FORM_TEMP.LINKED_FILENET_DOC_ID, WS_FORM_TEMP.SSN, WS_FORM_TEMP.FORM_TYPE, WS_FORM_TEMP.RECEIVED_TYPE, WS_FORM_TEMP.DET_ACCT_NUM, WS_FORM_TEMP.DET_ACCT_NUM_CORR, WS_FORM_TEMP.SEQUENCE_NUM, WS_FORM_TEMP.CLAIM_EFFECTIVE_DATE, WS_FORM_TEMP.EMPLOYEE_START_DATE, WS_FORM_TEMP.EMPLOYEE_END_DATE, WS_FORM_TEMP.VACATION_PAY_FLAG, WS_FORM_TEMP.RETIREMENT_BENEFITS_FLAG, WS_FORM_TEMP.SEVERANCE_PAY_FLAG, WS_FORM_TEMP.SIGNED_RELEASE_FLAG, WS_FORM_TEMP.EMPLOYER_CONTACT_NAME, WS_FORM_TEMP.EMPLOYER_CONTACT_PHONE, WS_FORM_TEMP.EMPLOYER_CONTACT_PHONE_EXT, WS_FORM_TEMP.EMPLOYER_CONTACT_FAX, WS_FORM_TEMP.DUE_DATE, WS_FORM_TEMP.COMMENTS_FLAG, WS_FORM_TEMP.ATTACHMENTS_FLAG, WS_FORM_TEMP.POSTMARK_DATE, WS_FORM_TEMP.RECEIVED_DATE, WS_FORM_TEMP.CREATED_DATE, WS_FORM_TEMP.WAGE1_END_DATE, WS_FORM_TEMP.WAGE1_WAGE, WS_FORM_TEMP.WAGE2_END_DATE, WS_FORM_TEMP.WAGE2_WAGE, WS_FORM_TEMP.WAGE3_END_DATE, WS_FORM_TEMP.WAGE3_WAGE, WS_FORM_TEMP.WAGE4_END_DATE, WS_FORM_TEMP.WAGE4_WAGE, WS_FORM_TEMP.WAGE5_END_DATE, WS_FORM_TEMP.WAGE5_WAGE, WS_FORM_TEMP.WAGE6_END_DATE, WS_FORM_TEMP.WAGE6_WAGE, WS_FORM_TEMP.WAGE7_END_DATE, WS_FORM_TEMP.WAGE7_WAGE, WS_FORM_TEMP.WAGE8_END_DATE, WS_FORM_TEMP.WAGE8_WAGE, WS_FORM_TEMP.SEP_LAIDOFF_FLAG, WS_FORM_TEMP.SEP_LAIDOFF_RECALL_DATE, WS_FORM_TEMP.SEP_QUIT_FLAG, WS_FORM_TEMP.SEP_DISCHARGED_FLAG, WS_FORM_TEMP.SEP_SUSPENDED_FLAG, WS_FORM_TEMP.SEP_CONVICTION_FLAG, WS_FORM_TEMP.SEP_PERFORMANCE_FLAG, WS_FORM_TEMP.SEP_STRIKE_FLAG, WS_FORM_TEMP.SEP_ABSENCE_FLAG, WS_FORM_TEMP.SEP_ASSURANCE_FLAG, WS_FORM_TEMP.SEP_EMPLOYED_FLAG, WS_FORM_TEMP.FORM_ID, WS_FORM_TEMP.STATUS
HAVING (((WS_FORM_TEMP.CREATED_DATE)=to_char(sysdate-1,'DD-Mon-YYYY')) AND ((WS_FORM_TEMP.RECEIVED_TYPE='1') or (WS_FORM_TEMP.RECEIVED_TYPE='2')));

Thanks in advance.

View 10 Replies View Related

Due Dates Skipping Weekends

Jun 16, 2005

I have a combo box that when selected autofills a due date box. I forgot
that I needed to skip weekends and only count business day. For example if
you choose standard it adds 2 days to the date but I need it to skip
weekends. Any help would be greatly appreciated.

Private Sub YourComboName_AfterUpdate()
Dim intDays As Integer
Select Case Me.YourComboName
Case "Standard"
intDays = 2
Case "Sensitive"
intDays = 5
Case Else
intDays = 10
End Select
Me.YourDateTxtbox = DateAdd("d", intDays, Date)
End Sub

View 3 Replies View Related

Date Conversion To Weekday And Weekends

Mar 12, 2008

Hi all.

I can complete this in excel no problem with monday through sunday being 1 -7, but is the same possible in access.

i.e. 12/03/08 = Wednesday.

Many Thanks Dean:confused:

Update:

DoW: Weekday([Calldate],0)

View 2 Replies View Related

Yesterday Date Ignoring Weekends

Dec 9, 2013

I'm using the Date()-1 to populate a form with yesterday's date for easier data entry. However, on Mondays I always have to change the date to Friday's date because it is populating yesterday's date (which in this case is Sunday). Is there an access expression that calculate yesterday's date but ignores weekends? So that on Monday yesterday would mean Friday?

View 4 Replies View Related

I've Searched, But Just Not Finding What I Need. Exclude Weekends In Query

Oct 20, 2005

Hi,
I've been searching the forums, and I find a bunch of posts about the subject, but I just can't seem to really find what i need.

What I'm looking for is how to construct a query, that will exclude any entries in my table that might fall on a Saturday or Sunday.

What is the easiest way to do this?

I'm going to be using the results of this query in a Report and DAP.

Thanks
Chris.

View 3 Replies View Related

Access Calender, Ignore Weekends And Bank Holidays

Apr 2, 2008

I'm using access 2007 and have some date fields in my forms, i'd like to be able to blank out weekends and public holidays from the calender/date selector in these fields so theres no way those dates can be selected. Is this possible? Thanks.

View 1 Replies View Related

Modules & VBA :: Find Previous Date Taking Into Account Weekends / Bank Holidays

Mar 25, 2015

I want VbA code to find a date 1 less than todays date taking into account weekends/Bank Holidays.

View 8 Replies View Related

Making A Look-Up Form Work The Way I Want It To Work!

Feb 27, 2006

We are creating a simple database to maintain driver license information for faculty, staff, and students who use cars from the university’s motor pool.

To do this, I have created two tables: tblDRIVER and tblLICENSE.

The fields in tblDRIVER are:
pkfDriverIndex
strLastName
strFirstName
strInitial
strAddress1
strAddress2
strCity
strState
strZIP
datBirthDate

The fields in tblLICENSE are:
pkfUpdateIndex
fkfDriverIndex
datDateUpdated
strState
strLicNumber
datExpirationDate
ynViolations
ynActive

Information about the driver is stored in tblDRIVER and the driver’s license information is stored in tblLICENSE. Periodically, we run a report that identifies drivers whose licenses are due to expire within a certain number of days. All this works fine.

My problem is that I am trying to create a lookup form that will load from a data entry form that will permit the Motor Pool Clerk to look up a driver by name and review the licensing information (which appears as a subform).

All this sort of works- I am using a combo box (based on a query) to look up a driver’s last name (which it does) and to populate all the driver’s information on the look-up form (including license information in a subform). Currently, the combo box locates the driver (including the unique index, last, and first names), and populates the form with first and last name but the rest of the information is not displayed on the look up form. Worse still, sometimes one driver’s last name matches up with the first name of the next driver listed in the table! This seems to happen only if a look up is attempted more than once. What gives.

Thanks for the help.

View 9 Replies View Related

Excluding Records From A Qry

Feb 28, 2006

Hi All,

I'm trying to extract records that start with 10 but I need to exclude all that start with 1011,1015 & 1025

so far I can only extract records that I need but cant exlude the others when I use the SQL below

INSERT INTO tblConceptOrders ( TA_TASK_ID )
SELECT dbo_F_TASKS.TA_TASK_ID
FROM dbo_F_TASKS
GROUP BY dbo_F_TASKS.TA_TASK_ID
HAVING (((dbo_F_TASKS.TA_TASK_ID) Like "10*"))
ORDER BY dbo_F_TASKS.TA_TASK_ID;


I'm looking for a better way to exclude the records I don't want & collect the ones that I do

Any help will be appreciated

thanks :)

View 6 Replies View Related