Getting Field Name Via A Calculation

Nov 21, 2005

Hi,

I have a cross tab query that has field names 6, 7, 8, 9, 10 representing months and a relevance date field with a date.

I have a form and from that form i need to get the value of the last three months from a relevance date field.

I.e relevance may be 01/10/2005 so i would need 3 labels, (labels are already made, but there source needs to be) 10, 9, 8. But the next row may have a relevance date of 01/08/2005 in which case it would be 8,7,6.

Any ideas on how i can do this.

Thanks Adam

View Replies


ADVERTISEMENT

Calculation Of Field Based On A Field In Access 2000

Nov 8, 2004

KTYPE=text; EXPIRATION_DATE=date/time; OVERAGE=date/time

im doing a report based on a query (which has a few fields, including KTYPE, EXPIRATION_DATE, OVERAGE). im trying to determine the OVERAGE based on the following conditions:

here are the conditions:

if KTYPE="PO", then OVERAGE:=(EXPIRATION_DATE + 6 months)
ie.. KTYPE=PO, OVERAGE:=(01/04/2004 + 6 months) = 07/04/2004

if KTYPE="IAA", then OVERAGE:=(EXPIRATION_DATE + 20 months)

if KTYPE="FA", then OVERAGE:=(EXPIRATION_DATE + 12 months)

and so on and so forth.

I'm very new to Access. What formulas do I use and do I put the formula in the query or the report.

Please help. thanks in advance

View 2 Replies View Related

Saving A Calculation Field

Aug 12, 2005

Having some problems with a calculated field on a form. The field came from my table but I typed in the calculation (=[cost_price]+[sale_price]) and it works fine but it wont save to my table so when I run a repot off it doesnt have any of the calculated values because they arent saved in my table??? Can anyone help?

Thanks
Tom

View 2 Replies View Related

Field To Perform This Calculation

Feb 23, 2007

How do I get a field to calculate this formula?
I want a script to find the precise current date and from another field find a number and add it to the current date day to make current date + number = date in the future.

For example
Field: Total Nights Hired = 2
Field: Date due back = 23/02/07 + 2 = 25/02/07

I am sorry if I did not explain this well enough. I am totally new to databases but need help in my corsework. I am designing a video rental system.

Any help will be greatly appreciated.
Andy

View 7 Replies View Related

Text Field That Needs Calculation

Apr 16, 2008

So here is my problem i am semi access savy but i have having trouble with one thing. At work when we make a schedule there are 5 possibilites for how you want to mark your day. I have created a field using text as my parameters since my possibilities include both letters and numbers. At the end of each week I need to create a calcuation only utilizing the number which is 1 to add up the total shifts in the week.

I have tried some IIF statements with no luck. The 5 possiblities are 1, c,r,a,l. Each of the letters stand for something. When the scheduler runs the query he needs to see the letters or the number for each day. But i can't create a properly working calculated field for adding all of the 1's together only. The letters don't need to be added. Any ideas?

Also I have to run a sum for the total of each day at the bottom so I am running into the same problem there if there is any letters in the boxes. Going to a number field is not an option
thanks for the help

View 6 Replies View Related

Unbound Field Calculation

Jul 31, 2007

Below is the code I have written to calculate the arrival and departure times based on the users input on time in the air (tripETE) and on the ground (tripGT). The arrival (txtArrTimeZulu) and departure (txtDepTimeZulu) times are unbound boxes since there is no need to save the information. My problem is when the next leg's ground or air times are entered, it updates the arrival and departure times for all the records to that value; overwritting the previous legs times. What am i missing here? Do i need to open a recordset when opening the form or when entering "TripETE" and "TripGT"?....

View 1 Replies View Related

Sum IF Else Minus - Calculation In Field

Mar 4, 2013

I have a report which is a statement. I want to be able to have a field that calculates rent, and minus payments. There are a few rent types, Pro Rated rent, Rent brought forward and rent changed, then there is 1 payment type. I am trying to write the sum a few ways, but have not had success. If rent type i= 1 or 2 or 3 I want it to add, if rent total = 4 I want it to minus.

=Sum(IIf([RentType]=1 Or 2 Or 3,[RentAmount],0))-Sum(IIf([RentType]=4,[RentAmount]))

View 2 Replies View Related

Global Field For Calculation In A Form

Aug 22, 2005

OK, I figured out how to make a calculation. My big problem now is to have a global field, which would be "beginning balance" and "ending balance". I have 5 employees that share the budget. The budget starts at $1280.00. One employee may buy somthing one day and then another day while another employee may also buy something. I want to be able to put in the amount the employee spent and have it deduct from the balance. But then when I go to another employee and subtract what they spend I want that to subtract from the balance. I want the balance to be visible at all times no matter what employee I am on. Hope this makes sense. I have an attached file that shows how I did it for one employee. Cannot figure how to be able to do it for each employee and just the balance changes. Also I built a subform to be able to show different dates. But the problem again is having it subtract from one global balance. Thank you.

View 3 Replies View Related

Field Calculation Not Saving To Database

Aug 26, 2005

I have the calculation =DateDiff("yyyy",[DOB],Now()) in the Data/Control source properties of a numeric field in a database/form which correctly calculates age in years from a date field DOB. How do I get this field to save to the database?
Georgina

View 2 Replies View Related

Forms :: Calculation With A Blank Field?

May 11, 2014

I would Like to save the data to our Table

[InvoiceTotal] - [InvoicePersonal] "if Invoice Personal contains a value" = [InvoiceShareLoan]

If "InvoicePersonal" does not contain a value, no calculation will be made

View 2 Replies View Related

Sum A Column Or Field That Has Calculation Inside?

Jan 31, 2013

is there any way to sum a column or field that has a calculation in them?

View 5 Replies View Related

Rounding Answers In A Calculation Field

May 31, 2013

Im building an expression where I am dividing fields by constants and adding them together. I need all answers always round down, so 19/20=0, 21/20=1

View 8 Replies View Related

Calculation With Lookup Field In Another Table

Dec 3, 2014

My Sales! table has fields [ItemType] and [Price] and VAT! table has [ItemType] and [VATRate].

Both tables has a common field which is [ItemType].

I am trying to make a query which will calculate the VAT figure by multiplying the Sales table [Price] with the corresponding [VATRate] in the VAT table by matching the [ItemType] in both tables.

I tried DLookup but couldn’t find a solution. How do I accomplish this?

View 1 Replies View Related

General :: Use Different Field In Calculation Than Shown In Combo Box

Jan 3, 2013

I have a form which calculates many fields in the form. However, the issue that I have is how to use a different field in the query than the field that is shown in the drop down combo box in the calculation of an expression.

View 4 Replies View Related

Queries :: Adding New Field For Calculation Of Dates?

Oct 10, 2013

I am working on updating another person access database, how to add a calculated field. I need to add a field to an existing table to subtract the date listed in one field from todays' date. It would need to return the answers in days

ie

10/10/13 - 10/1/13 = Return answer of 9 days

I have been told about DateAdd but I cant find these date function in the option of expression builder.

View 3 Replies View Related

Queries :: Calculation Only Works If Field Have Values

Jun 23, 2015

I have a calculated field in a query. The calculation only works if the fields have values. This is what I used a the calculation:

PrimaryShareTotal: [Primary1Share]+[Primary2Share]+[Primary3Share]+[Primary4Share]

I tried using the Nz command

PrimaryShareTotal: Nz([Primary1Share]+[Primary2Share]+[Primary3Share]+[Primary4Share])

but this doesn't work.

View 1 Replies View Related

Format Of Field Produces Error In Query Calculation

Apr 24, 2005

I have a query that add up the numeric values in a value list assinged in a combo box in response to each question, the row source for question 15 for exmaple is as follows:

ROW SOURCE: 0;"I have no idea";5;"I indicated that I wouldn’t have time today";0;"Was mentioned early on and then not offered again";5;"The salesperson said the vehicle wasn’t available"

I then run a query that adds together the responses to 3 questions, including question 15, the field in the query appearing as follows:

LS5: ([q14]+[q15]+[q16])

It was working fine but has stopped working, the fault lies with q15, if I take it out it works again. So I looked at the table as I am sure it must be the way it is set up, why it worked before I don't know and I attach a screen shot of how the field is set up in the table, which is no different to q14 and q16.

Anyone got any ideas?

One last thing is that it makes no difference if the fileds contain a number (including zero) or are blank

View 7 Replies View Related

URGENT HELP PLEASE! Auto-Updating Field Using A Calculation (Complex)

Aug 8, 2006

Hi, im relatively new to access but my problem is fairly complex.

I'm creating a database for a school project, and it is focused on improving the way a flying club runs.
I have been able to solve most problems myself, but this one truly has stumped me.

The basics:
There are two tables - Instructor Details
- Flight Completion

And one form - Flight Completion

On the instructor details table i have a field called 'Hours Flown'
The purpose of this field is to show the total hours flown by an instructor.
On the flight completion table i have a field called 'Flight Duration'
This field is for the duration of the flight the instructor just flew.

I want it so that when the instructor presses a button on the flight completion form, the duration entered into the 'Flight Duration' field is added to the 'Hours Flown' field and then the 'Hours Flown' field is updated with the new total.

I hope that is clear to you, but if not please let me know and i will try and clarify it for you.

I really do need help.

Thanks
Jared James

View 2 Replies View Related

Queries :: Filter Query With DateSerial Calculation Field?

Nov 21, 2014

I have a query with a DateSerial Calculation field that I would like to filter the query by. The DateSerial calculates the same day of every year (5/31/"YYYY"). When I try to add a criteria sort to this field, I get a data mismatch error. Here is the code: ThirdMay: DateSerial(Year(DateAdd("yyyy",3,[LastDayYear])),5,31).

How do I get only dates due in 2015 to show? I have tried all the standard date criteria to no avail.

View 1 Replies View Related

Forms :: Calculation In A Field - Getting Argument Not Optional Error

Sep 18, 2014

Trying to create a calculation in a field (text25) that excludes weekends and holidays. I am getting an argument not optional error.

Code : Me.[Text25] = GetBusinessDay([Due_Date - Result_Date])

View 14 Replies View Related

Tables :: Field With Calculation Expression - Round Function

Jul 28, 2014

I create e field with calculation expression and I need to round the results. I insert the following expression:

Round(IIf([A]="N";0;(IIf([B]>0;([B]-[C]-[D]-[E]-[F]+[G]);([H]-[C]-[D]-[E]-[F]+[G]))));2)

I have back the following error message: Could not find field 'Round'.

I do not understand why, because Round is not a field, but a function.

View 6 Replies View Related

Forms :: Due Date Calculation - Adding 4 Days To A Field

Jul 26, 2014

I don't think the below code is right, is it close?

Code:
Option Compare Database
Private Sub Test_AfterUpdate()
If Me.Test = "LR" Then
Me.Due_Date Date = [Date Received] + 4
End If
End Sub

Just trying to add 4 days to a field. (the Date Received field is in the format m/dd AM or PM)

View 5 Replies View Related

Adding Calculation Field (text Box) To Assets Template Form

Apr 3, 2013

I am trying to add a calculation field "Status" (text box) to Assets template form i.e

IF Asset item = X
Status = present

But am getting #name? in the text box

View 3 Replies View Related

Tables :: Auto Calculation In Sum Field After User Input (numbers) In Fields

Dec 28, 2012

I have a table, at the table I'v got these fields:

ID | num1 | num2 | sum

I want that the user put numbers at 'num1' and 'num2' fields and then the 'sum' field will calculate automatically the operator (sum=num1+num2).

I've tried to put any combination at 'Default value' of the sum field (all the fields are numbers , also tried to change the sum field to text...nothing works).

I'm getting a message that 'num1' field is not recognize at the table

(I tried =[num1]+[num2], without the '=', num1.table+num2.table , ...nothing works)

I also tried to do it with SQL command but it dosn't work.

There is any way to do it, is it possible? Or other way to do it at least at Form or at Report ?

View 7 Replies View Related

Queries :: Script To Do Calculation For Every Record And Place Result As Field In Query

Dec 21, 2013

1. I created a table that contains information about people and their details (mainly numerical info).
2. I created a form containing a command button and a label.
3. I have written a VBA script under the button so that when the button is pressed, the result of the calculation appears as the caption on the label.

My problem is...How do I get the script to run so it does the calculation for every record and places the result as a field in a query.

View 2 Replies View Related

IF Then Calculation

Oct 11, 2005

Trying to calculate a few fields. 1st field is [delays] and 2nd field is [Planned]
The Plan scheduled for 60 and the Delays are an entered value. In the on update command button on the form I want code that will take the value above 60 and add then to the value in the [Delays] So if delays is 10 and the planned is 70 then planned will change to 60 and delays will = 20

any help

Jon

View 2 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved