Multiple Start And Ending Dates
Jul 16, 2007
Hello Everyone,
I would like to run one query that can accommodate entering twelve possible date ranges and output the data all in one query. I could accomplish that by writing 12 queries and attaching each one to a start and end box on a form and then doing a Union Query to obtain one result. I think this might be the long way to accomplish this.
Is there a better way to get the result on one query for multiple Start and end Date Ranges?
Thanks
Joe:D
View Replies
ADVERTISEMENT
Mar 14, 2005
I know i have read this before, and i have been searching for a hour now.
can someone tell me how set a variable = the beginning date ofthe month and another variable2 = the ending date of the month?
Thanks for your help!
View 1 Replies
View Related
Jan 18, 2006
I have a query that is generating two colums, one the states the Start Date and the other that States the End Date. I need to display another column that displays the time difference between the two. Any ideas how?
View 10 Replies
View Related
Jul 26, 2007
I'm new in Databases and Access, so my problem is very simple.
I have a table with three fields: Name (Prim. Key), Start Date (Prim. Key) and Cost.
I want to obtain a query with this fields:
Name
Start Date
End Date (where the End Date would be one day before the next start date)
Cost
Thank you
View 1 Replies
View Related
Apr 7, 2008
Trying to compare start and end dates using a query so this is what i have but nothing is comming up wrong way to go about this? i need to do this for every month till 2012
Expr1: [Start Date]=[Start Date]>1/1/2008
Show: No
Criteria: True
Expr2: [End Date]=[End Date]<1/1/2008
Show: No
Criteria: True
View 6 Replies
View Related
Nov 3, 2014
I have created a query that prompts the user for a start and an end date and proceeds with showing the data between those dates.
I was wondering if there was anyway that instead of the user typing in the dates, a calendar could pop up and they could pick the start and end dates instead?
If that isn't possible is there anything else that's simpler that I can do? Maybe like a list box for month, date, and year?
View 3 Replies
View Related
Nov 25, 2005
I'm a couple of years removed from Access and shaking off the rust. I hope someone can help with something that may be obvious but I'm missing.
I'm simply looking to pass the begin and end dates to a query driving reports. The calendar form includes unbound text boxes, txtBeginDate and txtEndDate. My code populates the text boxes correctly; the user clicks on the calendar date, clicks the calendar day, then the Begin (or End) Date control, and each populates the respective textbox.
But when I run the query or report, I'm prompted for the parameters. This is what I have in the query's Date field criteria:
Between [Forms]![frm_Calendar]![txtBeginDate] And [Forms]![frm_Calendar]![txtEndDate]
I'm just drawing blank on what I did several years ago to make this work. If anyone can help, I'm most appreciative.
View 6 Replies
View Related
Apr 22, 2013
I'm booking in my hotel booking system the start and enddate of renting a room.
Example: Room 12 is booked from (startdate) 16/05/2013 till (enddate) 19/05/2013.
Now i need a query where i can see all the dates between start and enddate.
Like:
Room 12 16/05/2013
Room 12 17/05/2013
Room 12 18/05/2013
Room 12 19/05/2013
This between function i really need.
View 1 Replies
View Related
Jun 23, 2015
I've restructured my 'application' to have one table and a lot of query/forms. In light of not figuring out the combo box situation I altered the requirements and what I needed thinking I may have an easier go of it, but alas not exactly my experience. I have 5 reports that I want to filter them by week(start of the week). I have a function which can turn any regular date entered to the start day of the week(monday). I thought my best way about this would be to fill a combo box with all the accepted dates through a separate table's column.
Is there a way to pop a dialog box when the user clicks to generate the report that will prompt them to choose a week then run that criteria against the report and only bring back that date?
View 14 Replies
View Related
Aug 25, 2014
I have a db tracking vacation times for staff. One of the fields tracks a members vacation start and end dates. I need a way to pull a report to see who is on vacation based on Date() (today).
For example:
A record for John Doe has him start vacation 08/19/2014 and end vacation on 8/28/2014. If I wanted a report that shows who is on vacation today, 08/25/2014, using the date() function), how would I do this?
View 3 Replies
View Related
Dec 8, 2014
I have a table that has the following:
ID
Program Year
Program
Start Date
Midpoint Date
Internship Date
End Date
I have successfully created queries to create reports showing all Start Dates by Month no matter what program and similar reports for all the other date queries. What I need it to do is list everything happening within a month and sort them by category. How do I do that? I've attached the database so you can see my queries as well as the main switchboard reports associated.
View 4 Replies
View Related
Sep 5, 2013
I have a report that shows a Start Date and an End Date. I also have a control that shows a date which I'm wanting to check. I tried the conditional formatting to create something that says When this date is greater than start date and less than end date I want the cell to be Red.
>[Start Date] And <[End Date]
View 3 Replies
View Related
May 29, 2007
Embarrassingly, I'm not even to the point where I can ask a specific question about the query(ies) I think I need.
Here's where I'm starting from and where I want to go... maybe it will make enough sense for somebody to point me in the right direction.
I have sales data that contains line items for every item sold over the past X number of years. For each line, there are six key attributes that I'm concerned with.
For simplicity here's a scaled down example of the data for each line.
PART, PART_FAM, TRANS_DATE, FAM_GROUP, TRANS_AMT, OVS_CODE
For each attribute, there are at least five possibilities.
I have been asked to find monthly sales trends on about 20 unique combinations of these various attributes. An example might be, the monthly sales totals for:
TRANS_DATE = 1/1/06 to 1/31/06
PART_FAM = PIN
FAM_GROUP = 01xx
OVS_CODE = 2
Then a SUM for the TRANS_AMT.
I've set up a query that can give me the information I'm looking for one month at a time, but I want to believe there is a way to have Access do some of the grunt work, rather than me having to change the variables one by one and copy/paste each result into my new file.
Is there some reading or previous posts I could review that might get me thinking about this in the right way?
Thanks in advance!
View 2 Replies
View Related
Oct 15, 2007
I need to build an expression: calculate the total number of years worked given the start date and end date.
I put this as the expression in Field: Years Worked: [End Date]-[Start Date]
However, I keep getting #Error in datasheet view.
Can someone help? thank you.
View 1 Replies
View Related
Apr 4, 2012
I have a scenario where the first three rows of date which have dates of 4/1, 4/4/ 4/6 with ndc 5513026701; next six rows that have dates from 4/8 to 4/20 with ndc 5513014801; next three rows that have dates from 4/25, 4/27, 4/29 with ndc 5513026701.
The issue I am having is I do not know how to have separate min/max dates for ndc 5513026701 since when I group by ndc 5513026701 min = 4/1 ; max = 4/29. I need to have min = 4/1 and max = 4/6 for one row and another row of min = 4/25 and max = 4/29.
Any easy way to sequentially create min/max for each ndc 5513026701? I wasn't sure how to verbalize this so I have attached a sample worksheet.....
View 2 Replies
View Related
Dec 29, 2004
Can I let a Session variable end when all the pages are closed?
View 1 Replies
View Related
Jan 15, 2007
Morning All!
Boss-Man has a db (humongous) that (along with a zillion other things) tracks which specific tasks have been completed, who has done it and when did they do it.
All tasks will eventually be completed by all employees.
He's got a query that returns all of the dates on which each task has been completed, using each TASK name as a field.
The short version below shows the TASK1 was completed on 1/1/07, 2/7/06 and 2/17/07, TASK2 was completed on 01/05/07,by 2 people on 2/15/07 and again on 02/28/07 and so on.
TASK1***** TASK 2***** TASK 3 ***** TASK 4
1/1/2007 *** 1/5/2007*** 1/13/2007 *** 1/2/2007
2/7/2006 *** 2/15/2007 *** 1/7/2006 *** 1/15/2007
********** 2/15/2007
2/17/2007******
********** 2/28/2007 ********* 2/28/2006
What he would like to do is be able to show how many tasks were completed in any given week, such as:
WEEK ENDING # TASKS
01/06/07 3
01/13/07 1
02/17/07 2
Looks to me like you'd first have to identify the possible WeekEnding dates and then try to total across all the fields, but I've not got a clue how you'd do that.
Is there an easy way to "query the query", work with Week Ending on Saturday, and get the info he's looking for?
Thanks,
BeckieO
View 1 Replies
View Related
Jun 27, 2005
Hi,
I am creating a small call logging database and I would like the user to receive a message 1minute before the call is due to end.
I was thinking something like:
if [callend] =now() then msgbox "Call Due To End"
Can anyone help?
Many thanks
Charlie
PS, I have searched, but to no avail as yet!!!!
View 3 Replies
View Related
Jan 15, 2006
Hello - I have a database that is almost finished but unsure on the final calculations and how to get the correct data to flow to the next payperiod.
Each payperiod someone enters all staff members hourly time, vacation time used, sick time used, etc... Depending on the staff members status (fulltime or parttime), they accumulate a certain amount of sick and vacation hours but can never exceed the maximum in any given payperiod.
I have a query (which is dependent upon another query) that calculates the beginning sick time, sick time used, sick time earned, and gives me the remaining sick time and it works fine for the first payperiod.
However, I do not understand how I can get the remaining sick time to become the beginning sick time for the next payperiod. Is this done in the same query? A different query? A different method?
I have been beating my head against the wall for several days. Any guidance would be greatly appreciated!
View 4 Replies
View Related
Sep 24, 2013
I have created a 6 search boxes with names Author, Published, Language, Title, Keywords and University. If I enter "A" in Author search field then it should return all the 6 fields which contains "A" in Author field. It worked well.
My Requirement :
The column published is the year. In search box of Published if I search for 2000 then it's returning all the 6 fields which contains "2000" in Published field.
But most of the people doesn't know the exact year in which the book is published so they need some favour like, If they search for 2000-2010 in Published field then it should return all the fields which are between 2000-2010 in the published field.
For this do I need to create 2 extra text boxes and name them as Starting year and Ending Year? or else we can achieve this in single text box as xxxx-xxxx?
View 6 Replies
View Related
May 26, 2015
I'm currently looking to change the ending of all filepaths of imported files whenever I run the import. I want to change the path ending from .txt to .doc. So basically, the link/path to the file should be got, the ending changed from .txt to .doc and then the path (with the .doc ending) put into the table.
Code:
Private Sub bimportinternal_Click()
On Error Resume Next
strFolderPath = "S:Foo reportsSearchable"
strFolderPathSave = "S:Foo reportsSearchableArchiveword" & objF1.Name
Set objFS = CreateObject("Scripting.FileSystemObject")
Set objFolder = objFS.GetFolder(strFolderPath)
Set objFiles = objFolder.files
[code]...
View 4 Replies
View Related
Jul 24, 2014
how to generate a Report through "Form".I should be able to input the date ex: text box1= Start Date and text box2 should be End Date, by Clicking a button ...i.e Generate Report Button, a report should generate should be generated showing data in between the Start Date and End Date.
View 3 Replies
View Related
Oct 30, 2012
I have a text box with the following statement:
Summary detail: Sum(IIf([dacthc]=0,Null,Fix(100*[dqty]*([dstdhc]*[drate]/[dacthc]-[drate]))/100))
My question is, if it meets the criteria, is it possible to make it default to a "0" in the field.
View 1 Replies
View Related
Mar 18, 2008
I am trying to create a query to append information to a table. What I am trying to get the query to to is provide me with a list of multiple date results based on a new date every # of days. For example, I would provide a start date of 01/01/2008 and an end date of 01/01/2009. I would want to know what date it is every 9 days between. It would then give me a list of 01/10/08, 01/19/08, 01/28/08... I would then be able to use that information as a starting block to append records into a table with that as the "record date". It would be even better if it took into consideration Business days only and not weekends.
Any ideas would be appreciated.
View 5 Replies
View Related
Sep 16, 2004
Before I waste a ton of time trying to do something that just isn't possible, can one of you tell me if the following is possible?
I have a database that I am using for appointments.
Is it possible to have a calendar control on a form that shows all of a person's appointments that occur during the month? For example, Joe has 3 appointments in april. Can I make the calendar show me all three dates (the appointment dates being depressed on the control) that he has appointments on? If so, can you tell me how? I can make it do one date, by making the row source the date scheduled field from the table.
Should I have seven different fields in one record for the appointments that could occur all seven days of the week?
KellyJo
View 2 Replies
View Related
Apr 24, 2013
I'm creating a database and wanted to set up my table.
It is for a service with clients where we need to carry out a review every 6 months, so I need to create a way of entering a date every time a review is completed, then ideally a field that automatically totals the number of reviews that have taken place, and another field that automatically generates the date of the next review due - based on 6 months after the last review date.
Is that possible? It seems silly to keep adding fields for potential reviews as most will only have between 1-3 but in theory it could be as many as 20, which would be a lot of wasted space and fields for most people!
View 1 Replies
View Related