Override A Calculation

Dec 6, 2006

i have a database form with a field called commitment fee

in that field is a calculation

=-IIf([Type of finance]="Term Loan",([Total amount requested]*0.015),-([Total amount requested]*0.01))

But sometimes i want to be able to override this and input a different value like 0.00 if the amount has been paid.

any ideas what the code would be for this

regards
chris

View Replies


ADVERTISEMENT

Override AutoNumber

Nov 9, 2006

Hi all.

I have inherited a database which contains a table of tasks and where the TaskID is an autonumber. Quite a bit of code has been written that refers to specific values but unfortunately one of those is not contained within the table (for background the reference is 10 and where the current value is now 1683).
So, I want to add TaskID 10 but of course I cant be specific about that value. If I change the field to be just a number, I can add the record but then of course Access won't allow me to change it back to AutoNumber.

Any ideas?

Regards,

Gordon

View 5 Replies View Related

Override Required Fields

Aug 30, 2007

Well guys, I don't know if this is possible or not, but maybe someone can guide me in the right path.

I have a data entry form that several employees use. I have certain required fields that are set on the form level. I have couple employees that I would like to have the ability to override these fields. I was thinking like using F10 key or other key combinations that will allow them to override the required fields in order to save the record.

Is this something realistic that I can accomplish in access, and if so, does anyone have a sample that can help me with this task? Thanks to all.

View 8 Replies View Related

Override Event With Function Key

Nov 26, 2005

I am attempting to duplicate a feature of some software I use in my office. Been pretty easy so far because this software is built on Access. So here it is...... I have fields with names, job names in this case. Call it "JobDescription" MOST times I will want proper case, so I put ........Private Sub JobDescription_AfterUpdate()[JobDescription] = StrConv([JobDescription], vbProperCase)End SubThat works fine. But there are times you want to override this code.... The program I am imitating does this by using the "F10" key to move to the next field instead of the tab key. My question is what code to put on the F10 key to skip the "vbProperCase" code??

View 1 Replies View Related

Override Max Width In Reports

Jan 27, 2005

I have a report that i need to extend past the 22" margins currently allowed but have not been able to find a way to reset this value I would require at least double the width. Any suggestions.

View 8 Replies View Related

Allow A User To Override A Calulated Field

Dec 19, 2006

Hi all

i have a field called commitment fee and it has a calculation of
=-IIf([Type of finance]="Term Loan",-([Total amount requested]*0.015),-([Total amount requested]*0.01))

but i want to allow a user to enter a manual amount of money into the field how do i do this.

regards
chris

View 1 Replies View Related

Override Form Allow Edits With Code??

Oct 20, 2004

Greeting,
I am still struggling with my sub-form.
Have managed to prevent edit by using the form properties.
However I have some fields which have to be updated after the form has been closed.
I tried putting the following code in the (Before Update Event) of date issued field for instance.

If Me![DateIssued]=Null then
Me![DateIssued].Locked=False
end if

Needless to say this didn't help.

I have some fields which cannot be filled in until a later date.
These are job records so I have date open, Technician name date completed plus a whole herd of other stuff which has to be filled in as the job progresses.

Any help will be most appreciated,
Brian.
Zimbabwe

View 6 Replies View Related

Forms :: Override Default Date Value

Jun 6, 2013

I am developing a customers and orders database for a coffee sales company. I have, of course, a tblOrders that contains the fields 'OrderDate' and 'CallBackDate'. The 'CallBackDate', in most cases, should be 14 days from the 'OrderDate' and self-populate as a default value based on the 'OrderDate'. No problem with the concept there.

I originally wrote the following expression as the control source of the 'CallBackDate':[OrderDate]+14

Yes, works beautifully, populates field just as it should. However, if, for some reason, they want the 'CallBackDate' to be more than 14 days, you can't override and type in your own date.

I have also tried making the control source the 'CallBackDate' field and the default value [OrderDate]+14, but then it doesn't default, only leaves the field open for manual entry. I need to be able to somehow do this within Access. Text fields will allow you to override a default value.

View 3 Replies View Related

Modules & VBA :: Ignore / Override Form Ribbon Created For Users

Jan 27, 2014

I have created a ribbon for the users on all forms, and named that ribbon on each form. While I can bypass the Main ribbon (hiding backstage and most other tabs) by holding the shift key on open, the minute I open a form I am stuck with the very limited form ribbon I've named. Is there a programmatic way I can ignore this call, either when holding the shift key or some other avenue?

View 14 Replies View Related

Forms :: Make Command Button Override Required Fields Focus?

Sep 18, 2014

I am using code like this to give warning messages and pass on focus to boxes only when things are selected.

Private Sub TextBox2_Exit(Cancel As Integer)
If IsNull(Me.TextBox2) Then
MsgBox "TextBox2 cannot be left blank"
Cancel = True
Else
ComboBox1.SetFocus
End If
End Sub

I do this for a series of required fields in order.

However, I also want a command button that is 'Exit without Saving' that should be clickable at any time, but of course when focus is controlled in my required fields sequence, it can't be clicked. How can I separate this button?

View 14 Replies View Related

IF Then Calculation

Oct 11, 2005

Trying to calculate a few fields. 1st field is [delays] and 2nd field is [Planned]
The Plan scheduled for 60 and the Delays are an entered value. In the on update command button on the form I want code that will take the value above 60 and add then to the value in the [Delays] So if delays is 10 and the planned is 70 then planned will change to 60 and delays will = 20

any help

Jon

View 2 Replies View Related

Q:Calculation

Oct 24, 2005

Hi All.

I have 3 tables in Access:
tblCurrency (Fields: IDCurrency, CDate, CRate)
tblOrder (Fields: IDOrder, OName, ODate)
tblCalculation (Fields: IDCal, Rate1, Rate2, Rate3, COrder)
IDOrder is related to COrder with "One to Many" connection.

I have Form frmOrder, based on tblOrder. For Example Form has 1 record:
IDCal OName ODate
1 XXXX 2005.10.24

For this record related table has 2 records:
IDCal Rate1 Rate2 Rate3 COrder
1 10 3.5 15 1
2 6 4.2 12 1

tblCurrency for Exapmle have one record too:
IDCurrency CDate CRate
1 2005.10.24 0.2

In frmOrder I have textBox txtRate. Here I need to be calculated:

=Sum (Rate1*(CRate from tblCurrency Where tblCurrency.Cdate = tblOrder.Odate)+Rate2*Rate3 for Each record related to tblOrder).
By Exapmle: (10*0.2+3.5*15)+(6*0.2+4.2*12)=106.1

Please help with expression.
Thank You in advance.

View 3 Replies View Related

Need Help With Calculation

Jun 9, 2007

hey i hope some one can help me...

I am making a database for products and suppliers. Many suppliers can supply each product.

The product details are in a table called products, the suppliers details are stored in a table called suppliers and the suppliers offer for each product is stored in a table called prices.

the structure is as follows:

Table: Products
Product Name
Trade Price

Table: Suppliers
Supplier Name

Table: Prices
Product Name
Supplier Name
Supplier Offer

I have form that shows the product details and a subtable linked to the table:prices.

The problem

I need to add a field in the subtable called "Percent off trade" which is the trade price - supplier price / trade price * 100

i created a query showing the same records as the prices table plus the field "trade off price" and set the Field to:

Percent Off Trade: ([Forms]![Products]![Trade Price]-[Prices]![Supplier Price])/[Products]![Trade Price]*100

But this doesnt give me the correct percent :confused:

I hope i have explained this query and would really appreciate anyone who takes the time to suggest anything that could help

thanks in advance!

View 5 Replies View Related

Calculation

Nov 21, 2007

How can I multiplicate two numbers from two columns in a subform, show their result at the end of the row and then calculate sum of those results on the main form. This is something what I know how to do but the problem is following:

The total sum on the main form should be multiplicated wit 0,5 % and then reduced for a value of a specific row sum. It should be something like this: (Sum of rows sum * 0,5 %) - Sum of the specific row = Total sum on the main form. And all of this should be on a report too.

View 1 Replies View Related

What Calculation To Use?

Jan 2, 2006

What would I use for a formuls to find all product that are in stock.
like I have a price for all products that i stock, but some i don't have in stock. How would I query for the ones that I have in stock?
In my table I have it as UnitsOnHand, I have it as how many, like 1 or 3 or 4 etc. And also a field for Paper or Metal.
How would I query just for paper and not metal?
I am also going to need a query for the lowest price and the highest price.
Please understand I am New and I have allready search through all the post and can't seem to find anything close to what I am trying to do.
Any and all help would be great

Thank You
WackoWolf

View 10 Replies View Related

Need Help In Calculation

Jan 20, 2008

hi,


i'm working in a database and i face some problems in some calculation

this is my table which contain these fields:
NOC number
Company Name
Warning Letter


Note: each company has many NOC

Here what i need from the query

1- create a field which contain a total of warning for each month
2- create a field which contain a total of warning for each NOC
3- create a field which contain the total of warning for the company

View 3 Replies View Related

Help With A Calculation!

Feb 26, 2008

This is probably an easy calcualtion I am overthinking...
I am trying to make a query where I am calculating the "Total Value" of each customer's order of each item for the current week. The item "my company" is selling is fish, sizes small, medium and large all at different prices. I'm not exactly sure what they mean by "Total value", but I assume I take the cost times the quantity...but then what is the difference between Total Value and total ordered (in dollar amount)? Any suggestions?

View 2 Replies View Related

Calculation

May 25, 2005

I wonder if someone can point me in the right direction with a calculation problem. I have never done calculations in access before but want to make a balance sheet for a club account that I am designing. Very much in its trial stages, I have a form with three currency text boxes in it, set up as continuous. MoneyIn and MoneyOut are in the main form whilst Total is in the footer. All I want is to be able to put in a value in MoneyIn or MoneyOut and for the Total to update. Problem! I dont have a clue where to start! :rolleyes:

View 2 Replies View Related

Calculation Help

Jun 20, 2006

Here is a part of my database nicely zipped for you guys to help me with.

whats happening is when i click the totals button whatever the highest cost option that is selected with a "Y" should be displayed in the totals text box.

example:

Installation of heating system - "Y"
Replacement Kitchen and Bathroom - "Y"
Total should be "£90"

The code behind the button works fine with every choice but not the installation of the heating system. When this is selected "Y" the code seems to be ignoring it.

Any help will be much appreciated.

View 4 Replies View Related

Payroll Calculation

Dec 6, 2005

I am trying to type a code based on 1 & 2 criterias. However, I am having a problem on the first criteria because it is adding 8 hours when it shouldn't. Can someone help to either fix my code or write a new one? Thank you very much!

Criteria 1: If the day_of_wk is 1, calculate time-reg_time/60, If the day_of_wk is 1 and time is less than 0, calculate time-reg_time/60+24

Criteria 2: If the day_of_wk is 2, calculate time/60, If the day_of_wk is 2 and time is less than 0, calculate time/60+24

My code: pre: IIf([day_of_wk]="2",[time]/60,IIf([time]<0,([time]-[reg_time])/60+24,([time]-[reg_time])/60))

View 4 Replies View Related

Time Calculation

Jan 25, 2006

i have two date/time fields

sdate (start date) 01/01/2006 14:30 - format(dd/mm/yyyy hh:mm)
edate (end date) 02/01/2006 14:31 - format(dd/mm/yyyy hh:mm)

i need to get answer in HH:MM (24:01)


pls help me

thnx best regards
ibu

View 4 Replies View Related

Time Calculation

Jan 25, 2006

i have two date/time fields

sdate (start date) 01/01/2006 14:30 - format(dd/mm/yyyy hh:mm)
edate (end date) 02/01/2006 14:31 - format(dd/mm/yyyy hh:mm)


i need to get answer in a textbox as 24:01 (hh:mm)


pls help me

thnx best regards
ibu

View 2 Replies View Related

Time Calculation

Feb 8, 2006

Hi all,


I'm a beginner, and i want to know how to calculate time difference. For ex, if i substract 23:45 of 02/09/2006 with 00:10 of 02/10/2006 then i get a - "ive" value... Please somebody help me with a vba code for this...

thanks
Senthil.

View 1 Replies View Related

Date Calculation

Feb 11, 2007

I want to resolve date calculation problem.

I have one form field with users total sum of lenght of service (format of field looks like yy/mm/ddd) in another form field I have data with users date of employment in a firm.
In the third field I want to show total sum of lenght of service (previouse lenght of service and lenght of service in our firm) in format like in first field yy/mm/ddd.

What is a easiest way to calculate a third field in a form.

Thanks in advance !!

View 3 Replies View Related

Speed Of Calculation

Apr 5, 2007

Hey,

I noticed something strange in access 2000: sometimes it takes a long time to calculate a report and other times it goes rapidly. I don't see any process taking a lot of CPU %.

When i do the same thing in Access2003, it goes rapidly every time.

Can anyone help me?

Rik

View 1 Replies View Related

Stock Calculation

Apr 19, 2007

Hi All

I am seeking the solution to a problem with calculating stock adjustments

We use a job code which comprises several stock items and labour which = a $ value

I have a form "work in progress" where I enter all the job details including the job code, the aim is to reduce the individual stock items from a table "Stock" when the job code is entered.

JobCode 25WE = 1 x power point, 25metre cable , 9 x clips

I have tried several methods but to no avail, is there a way of doing this

Thanks in advance
GeoffK

View 1 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved