Prevent Double Booking Using One Date And Start Time With End Time

Apr 10, 2015

so i created a system to have events booked, and i am trying to check time availability of the event room available, but i dont know what wrong. it either my query or vba code. i have attached the attachment,

View Replies


ADVERTISEMENT

General :: How To Prevent Double Booking

Jan 23, 2013

On Microsoft Access 2010, I am creating a database project for a DJ booking system (not for professional use) and wondered how you can stop double booking from occurring that would provide you with an error message that I could personalize.

My current booking file looks like this:

Booking ID - Primary Key
Customer ID (Linked to customer table)
Venue ID (Linked to venue table)
Date Booked
Set Up Time
Start Time
Finish Time
Party Type
Discount Code

At the moment I have the date booked as Indexed (No Duplicates) however this gives me a long error message that I can not personalise.

Access 2010...

View 4 Replies View Related

Queries :: Start Time - End Time Query

Nov 3, 2014

I have finger print machine and i already connect to it and get all log.then i tray to get data and here is the code that im using

SELECT Format(CHECKINOUT.CHECKTIME,"dd/mm/yyyy") AS CDate, IIf([CHECKINOUT.CHECKTYPE]=I,Format(CHECKINOUT.CHECKTIME,"hh:nn:ss ampm")) AS StartTime, Format(CHECKINOUT.CHECKTIME,"hh:nn:ss ampm") AS EndTime, USERINFO.USERID, USERINFO.Name, CHECKINOUT.CHECKTYPE
FROM CHECKINOUT INNER JOIN USERINFO ON CHECKINOUT.USERID=USERINFO.USERID
WHERE (((Format([CHECKINOUT].[CHECKTIME],"dd/mm/yyyy"))='10/04/2014'));

how i get end time due to CHECKTYPE]=O

View 1 Replies View Related

Modules & VBA :: Prevent For Duplicate Data (Time / Date)

Jul 26, 2014

I've a Sub form as datasheet view/grid.

See Capture1 & Capture2.

I'd like to prevent for duplicate time/date for same GuideCode. How can i prevent for those during the entry time or save time ? Is it possible ?

Capture1.

Capture2.

1. AUNKZ(GuideCode) is already assigned in other file number(12345) for 03-Aug-14 (as 02-Aug-14 to 04-Aug-14).

2. TOD(GuideCode) is already assigned in same file number(23456) for 10-Aug-14, 12:00 PM (as 10-Aug-14 to 10-Aug-14, 8:00AM to 1:00PM). I'd like to prevent if the file number are same or not same.

View 14 Replies View Related

Hard Code TIME To Selected Date On Form (to Make It Date&time) For My Query Criteria

Aug 17, 2006

Hello buddies :D, do you have any idea how to make this work?

To select data that falls within this criteria of date range between cboDate and cboDate2 (fields on my form). The date in [tblJobDetails]![timeIn] come in this format "08/17/06 10:24 AM", but the cboDate/cboDate2 (takes in date only e.g 08/17/06) what i am after is to evaluate specific hard coded time in addition to the date entered, i.e. even tho, i haven't entered time on the cboDate/cboDate2, I want specific time hard coded where e.g If i select a date range of 08/17/06 and 08/18/06 on my cboDate and cboDate2 it should really be evaluating: 08/17/06 8:00 AM to 08/18/06 8:00 AM.

This is the criteria i curentlly have on my query in design view tha works perfect in selecting date only.
([tblJobDetails]![timeIn]>=[Forms]![frmPendingJobs]![cboDate] Or [tblJobDetails]![timeIn]>=[Forms]![frmPendingJobs]![cboDate] Is Null) And ([tblJobDetails]![timeIn]<=[Forms]![frmPendingJobs]![cboDate2] Or [tblJobDetails]![timeIn]<=[Forms]![frmPendingJobs]![cboDate2] Is Null)
How can I incorporate 8:00am to 8:00am into my cboDate and cboDate2. What can i do to make this happen? Your kindness will be greatly appreciated http://www.naijaryders.com/forums/images/smilies/thankyou.gif

View 10 Replies View Related

Forms :: Booking System - Time Picker Function?

Dec 2, 2013

Is there some kind of Time picker function , i can see the date picker however i am using a booking system and have a field named 'time of booking' and i need something that can dump the exact system/online time into the field.

View 5 Replies View Related

SQL To Get A Job Start Time And End Time??

Oct 21, 2006

Hi,

I have a database that tracks jobs as they are being completed.

I have 2 tables, the first of which contains details of the jobs and the second contains details of the individual tasks that make up each job (Job and Task respectively)

Within the Job table, there are several fields, however the fields I am concerned with are JobKey, JobID, Start_Time and End_Time.

Currently, as each task within a job is completed, a new entry is added to the Job table with an updated End_Time. At the end of a job, there will be several entries in the Job table similar to

JobKey JobID Start_Time End_Time
1 1 10:00:02 11:00:07
2 1 10:00:02 11:01:14
3 2 10:02:12 11:24:45
4 1 10:00:02 11:02:34
5 1 10:00:02 11:05:25

etc

When I query the Job table, I end up with multiple references to the same job, where all I really want is a single reference to a job with the JobID, Start_Time and the End_Time the last entry relating to a particular job.

How would I write a query to give me a single reference to a JobID Start_Time and the final entry for End_Time?

eg From the above, my query should return

JobID Start_Time End_Time
1 10:00:02 11:05:25
2 10:02:12 11:24:45

Thanks for any help with this

W1dge

View 3 Replies View Related

Sum Of Start Time And End Time, Please Could Someone Help Me...

Sep 14, 2007

i have three fields.
StartTime, EndTIme and TotalTime,
i need to sum the StartTime to EndTime so that i will know how many hours it spent.

and also the total min.

pls could anyone help me...

thanks

View 14 Replies View Related

Queries :: Getting Date / Time Range - Date And Time Are Separate Fields

Mar 13, 2014

I have a database with date and time each stored in a separate field. Now I want to query the database based on a start date/time and an end date/time. I started with the code below but it only returns events within the same time range on each day when what I really need is every event from a specified date and time through a specified date and time.

SELECT myTable.ID AS myTable_ID, myDate, myTime, FirstName, LastName
FROM Staff INNER JOIN myTable ON
Staff.ID = myTable.StaffID
WHERE myTable.myDate >= #3/2/2014#
AND myTable.myDate <= #3/3/2014#
AND myTable.myTime >= #8:00PM#
AND myTable.myTime <= #11:00PM#
ORDER BY myDate desc

In the above example what I want is every event from 3/2/2014 8:00PM until 3/3/2014 11:00PM. But what I get instead is every event between 8:00PM and 11:00PM on 3/2/2014 and every event between 8:00PM and 11:00PM on 3/3/2014.

View 4 Replies View Related

Reports :: Auto Populate Date And Time Every Time Form Is Updated

Nov 8, 2013

I have a database that stores information for lab testing. Each time a tech does a "step" in the test process he logs it in the table, using an input form. There are different categories, for example preparation, testing, analysis, etc, and each of those steps take time. I have the form autopopulate the date and time with NOW() evertime the form is updated. What i want to do is calculate the time it takes to do each in days. I can easily get how many days it was from now since they logged the test, =NOW()-TestDateTime. What I want to do is get the number of days it took to do each step, ie the number of days between each event. Is there a way to do this?

View 3 Replies View Related

Reports :: Attendance Database - Show Time In And Time Out For Specific Date

Apr 3, 2014

I have an attendance database and I connect the time attendance machine db to my access db, what i am trying to do is to generate a report that shows the time in and time out for specific date. the type of attendance db is date/time.

Please see the attached screenshot db from attendance machine.

an also some time there is duplicate entry, I need to get the first and the last entry only for specific date.

View 4 Replies View Related

Forms :: Update Time Portion Of Date / Time Field

Aug 29, 2013

I have a date/time text field on a form with the General Date format and a combo box next to it that has sequencial times as the row source (IE. 12:45 AM, 1:00 AM, 1:15 AM, 1:30 AM, ETC.) When the user chooses a time in the combo box, I want the time portion of the text box to be updated with the chosen time in the combo. I have tried a few things but cant seem to get it right.

View 4 Replies View Related

Ignore Time In Date And Time Field

Mar 6, 2007

Hi,

Wonder if someone can help please. I'm quite new to Access so please bear with me.

I have a data field in my database consisting of both a date and time.

I then have a form containing two fields where the user can type a 'To' and 'From' date to extract the records that they are interested in. The query behind this uses the 'Between[Enter The Date] And [Enter The Date]' coding.

The problem is that because the field contains a time it doesn't return any records when I run the query.

Can anyone offer a bit of guidance on how I could ignore the time part of the field perhaps by adapting the above.

Many thanks

Chris

View 2 Replies View Related

Sort By Time Only In A Date / Time Field

Mar 19, 2014

I have a column/field named [DateTaken] which contains test dates and times in the same cell. I am needing to find those with a test time less than 2:30 pm or <14:30pm.

data looks like this:

8/22/13 4:23 PM
1/29/14 12:21 PM
1/28/14 3:27 PM
8/26/13 4:27 PM

[code]....

this is what I have come up with to extract the time component of data set so that I can then later, sort it by the time in a query.

JustTime: TimeValue([YourField])
JustTime: ("hh:mm",([DateTaken])) and or ("hh:mm",[DateTaken])

I get either invalid operator or invalid syntax errors trying both of these.

View 5 Replies View Related

SQL Expression - Calculate Difference Between Start And End Time

Jun 2, 2015

I'm trying to calculate the difference between start and end time, which works fine with:

Total Time: DateDiff("n",[tblTaskTimes]![StartTime],[tblTaskTimes]![EndTime])

However, this is for a database that calculates billable time in 10th of an hour. So, for example, 1 hours would be 1, 30 minutes would be .5, less than 6 minutes would be .1.

The format for this expression is set up to a general number, if that matters.

It's gotta be something in the formula like multiplying this by 24 (for 24 hours) and then dividing by something. Nothing I'm trying is working.

View 7 Replies View Related

Help With Double Booking

Mar 7, 2008

Please could someone give me help on this topic, I need to slove it for coursework in Access but im having the following problem.

Im creating a database for a hotel which rents out its room obviously. The problem i have is if a guest books a room for say march 3rd until march 6th, theres currently no way in which to stop another guest booking the room for any of these dates.

I think i know how to stop double booking for the start day, but not the days inbetween if you understand.
The database has 3 tables:
Guest Info
Room info
Bookings

If anyone can help it would be greatly appreciated.

P.S the method i hope to use, is the hotel will enter the start date of a guests stay and then enter the number of nights the guest is staying for e.g. 3rd-6th of march would be input as: Begin date: 03/03/08 for:'3' nights.


Thanks for any help

View 9 Replies View Related

Double Booking HELP

Oct 17, 2004

I am wanting to prevent a double booking. I have a form called:

frm_Booking which records an ArrivalDate and DepartureDate

and another form

frm_Building_Booking which records a BuildingID number

I want to ensure that a customer cannot book a BuildingID for an ArrivalDate and DepartureDate it it has already been booked by another cusotmer or book any on the days between.

However a customer should be able to book a BuildingID on the DepartureDate.

View 1 Replies View Related

Forms :: Format Double Field As Long Time

Feb 17, 2015

I have recently upgraded my Access 2003 application to Access 2010. I am running into a problem when formatting a textbox to 'Long Time' that is linked to a Double type field. The error that I get is 'The value you entered isn't valid for this field. You may have entered text in a numeric field or a number that is larger than the FieldSize setting permits.'

The textbox is linked to a field (double data type) and displays as the time in long format (4:06:17 PM). When I try to change to 4:07:17 PM I get the error. I tried removing the 'PM' and the colons but the error still occurs. The only way that I can get it to work is if I use a double value (0.735405092592593). In Access 2003 the time value would display properly, allow me to change the time and then save the time as a double to the database.

View 3 Replies View Related

Forms :: Adding Breaks On A Form - Start And End Time

Jun 18, 2014

I have an input form for production. I need to be able to have a unbound box look at the start time and end time. I need it to determine if the times fall during a break or lunch. My fields in my table are - ID, Start Time, End Time. Example of what I need the control source formula to do is this. If I start at 6:00 AM and work till 10:00.AM and my break is Start Time 9:00 AM... End Time 9:10 AM. I need it to then show 10 in the box as result of the break. I have this so far as in my formula builder.

IIF([Start Time]<9:00 AM AND [End Time]<9:10 AM, 10, 0)

When I press enter it says I have an syntax error and I have checked to make sure the fields are correct. Also how would I go about adding on to this formula to add a lunch break on to it.

View 10 Replies View Related

Queries :: Display Start And Finish Time For Activity

Sep 18, 2013

I have a query that displays the start and finish time for an activity, I am trying to display the reults of the time between each activity....

For example
Name start End
aaa 14:07 14:09
aaa 14:11 14:12

The end time for the first activity was 14:09 and the next job was started at 14:11, so I want it to display 00:02: - (elapsed time)

Its very easy to do in excel as it would be =SUM(B2-C1) but haven't a clue how to do it in access.... is there any way?

View 3 Replies View Related

Forms :: Calculate Difference Between Start And Finish Time

Jan 30, 2014

I have a subform in which I want to calculate the difference between a start time and finish time, the problem I am having is when the start time is on a different date to the finish time

Start 23:15 on 14th Jan finish 00:015 on 15th Jan, also I want the answer to be the number of minutes. The fields I have are

BatchStartTime Short Time
BatchFinishTime Short Time
BoilTime ([BatchStartTime] - [BatchFinishTime]) General Number.

There are many batches to enter per job and the MainForm has the StartDate as I didn't want to enter the StartDate for each batch.

View 4 Replies View Related

Pls Help, Double Booking Problem.

Jan 14, 2008

could someone please help me, i am having a problem trying to get rid of double bookings in the attached database.

This database is for an assignment for my students, and unfortunately i had got the point now that i have got incredbily stupid and cannot see a solution.

I want to make sure that a client cannot double book an instructor and a car on a specific time or date...

Obviously i would also want to make sure that if one client has booked a specific car or instructor no other client would be able to book it, in the same time and date slot.. All lessons are 1 hour long

for some reason i have to make sure that a client can book a specific car...
This unit is being taught alongside another unit by another teacher, who does not see the complexities of the problem, and insists that this complexity is in the database, however they do not know the solution either.

I have tried creating different types of primary key combinations, but that does not work..

Any ideas or suggestions would be greatly appreciated

View 14 Replies View Related

General :: No Start Or End Time In Linked Table Using Outlook Calendar

Aug 5, 2015

I created a call logging/work tracking type Database using SharePoint 2007 lists for the backend and Access 2013 front end for about 60 users and it has been running smoothly for around two years .

We use a shared outlook calendar and I want to be able to pull meetings & appointment information into the database from the calendar so I can assign the meetings out to specific people and keep of a record that they where given the request to attend. I was able to use the import outlook folder to create a linked table and it has lots of great information from the calendar apart from the two most important things you need in a calendar Start_time & End_Time . Is there something I'm missing in regards to these two fields? I assume I'm doing something wrong but I can't figure out what, nor did I have much luck with the Search function on here or google.

This is the list of field names it does import(everything apart from the meeting time and is it a recurring appointment)
Importance
Icon
Priority
Subject
From
Message To Me
Message CC to Me
Sender Name
CC
To
Received
Message Size
Contents
Created
Modified
Subject Prefix
Has Attachments
Normalized Subject
Object Type
Content Unread

View 1 Replies View Related

Time Format - Short Time Displayed As Medium Time

May 23, 2006

I have an application with a backend db on PC 1, and the same application on PC 2 linked to the backend db on PC 1 via the network.

The link works fine but the time formats are different.

On PC 1 the time format is shortime and displays as it should i.e. in 24 hour clock format

However on PC 2, opening the same database via the network, the time format is still shorttime but when you read the time within the code it comes out in AM/PM format. Also, when the defaul tiem should be #20:00:00# but this changes to #8:00:00 PM#

Weirdly though, when you just open the table, the times are in the correct shorttime format.

Guessing, it must be a setting within the main core of Access 2003 that is different between the 2 instances?

Any ideas?

This screen shot may help:

View 2 Replies View Related

Time Format - Short Time Displayed As Medium Time

May 23, 2006

I have an application with a backend db on PC 1, and the same application on PC 2 linked to the backend db on PC 1 via the network.

The link works fine but the time formats are different.

On PC 1 the time format is shortime and displays as it should i.e. in 24 hour clock format

However on PC 2, opening the same database via the network, the time format is still short time but the format is in AM/PM or medium time.

Guessing, it must be a setting within the main core of Access 2003 that is different between the 2 instances?

Any ideas?

View 1 Replies View Related

Double Booking Property Problem

Mar 8, 2007

Hi

I have created a database to take bookings for holiday properties but can't figure out how to stop the properties from being booked over the same period. I have a table called booking order with the fields Booking no, property no, start date and end date. On the equivilant form for a property i need to be able to stop start and end dates being entered that are between existing start and end dates already booked for that property.

Thanks for your help

View 5 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved