Analysis :: How To Save Parameter From A Report Created In Browse View Under Cube
Nov 10, 2015
After connected to Analysis Services and following the path below:
Analysis Service - Databases - Cubes
I create the parameters for a custom report after right click on a specific Cube and select Browse to arrive at a view where i can define dimensions and parameters as well as drag and drop measure to the report rows and columns. The left top File bottom only give me a Save Selection or Save ALL option. However, i'm not sure where it saves it to or if it saves the settings for this custom report at all.
I pull this report monthly and it's a pain to recreate all the parameters. How to save this template for future pulls or maybe even incorporate the pull into excel for monthly refresh instead?
I have a cube. Its xml is different at some point than its design view. Suppose for some dimension and its attributes, source table is different than what it showing in the properties window for them..
Is this possible? How to read cube xml because there are repeating tags in it. There are two type if dimension tags.. one has only attributed and other has all properties.
I want to change the color of the ssas cube calculated member in formview from red background to white or back to default color settings. This also includes changing the text color back to default. What properties do I have to change?
I have installed SQL Server 2005 on a server which runs Windows Server 2003 with SP2. And I have two client machines, both running Windows XP with SP2. Machine A has a full version of SQL server 2005 installed, including database engine, analysis service server, reporting service server. Machine B only has workstation components installed, BI development studio, SQL Server management studio.
I have developed a couple of analysis service projects and deployed to the server. On machine A, I can connect to the server and browse cubes no problem. On manchine B, I still can connect to the server and see the projects I deployed, even browse dimensions data. But when I browse cubes, management studio will be hanging there, not doing anything. Eventually I will have to kill it. I also opened the projects on machine B from BI management studio and try to browse data from there, it shows 'loading data' and doesn't do anything either.
Does anyone experience this type of issue? It's really frustrating as it doesn't show me any error message.
I have made sure that I am a member of OLSP Adminstrator group on the server and everything seems to work al the way till design storgae and cube processing but then when I browse the cube, I do not get any data :confused:
Hello! i am new user with the Analysis servises. i started by doing the tutoraiol for MyFirstCube. i performed the action step by step and succeded to create the cube. when i am trying to browse it iget this massage: "unable to browe the cube" in the Cube browser.
I have created a simple cube in BI Studio against an Oracle Relational Data Warehouse. In this cube I have created a perspective in which I have selected (included) only a small subset of measures and dimension. When I view this perspective on the Browse Tab of BI Studio, only the entities that were included in the perspective were available for report construction as was expected.
Next, I generated a model for this cube in Report Manager. Now here is the problem, I then opended the model in Report Builder and selected the same perspective from above, but all of the Entities in the cube were displayed including the fields I explicitely did not include in the perspective. I then looked at the .smdl file describing the Model and it looked like in the Perspective description section all of the cube's entities were included, even the ones that should not have been included. It seems as if the problem is ocurring durring the model generation. I also tried generating the model in Management Studio and it seems to be doing the same thing.
Any ideas on how to fix this? Could I be doing something wrong(probably)? I have to give a presentation soon and this is a big deal for the Project Stakeholders.
By the way, I am using the 180 Day Evaluation of Sql Server 2005 with SP2 CTP installed.
I have processed the data successfully for the cube after desiging storage as MOLAP with 50% performance gain. When I tried browse the data I am getting the followign error.
Unable to Browse the cube 'cubename', Unspecified error.
I broke up my cube into 24 partitions. There are about 630M total fact rows in that cube.
When I open the cube to browse in BIDS or SQL Management Studio it takes very long time to open (I think 30 minutes).
Profiler does not show that it's running a query, but messages like this keep appearing throughout the time it's opening to browse:
Progress Report Begin, 14- Query, Started reading data from the 'p0' partition. Progress Report End, 14- Query, Finished reading data from the 'p0' partition. Progress Report Begin, 14- Query, Started reading data from the 'p10' partition. Progress Report End, 14- Query, Finished reading data from the 'p10' partition.
I am trying to report against a cube and I want the user to be able to choose the date for the report.
Now the cube dimension has been built against a calendar which contains values for the next 30 years(!) so when I create a parameterized report the list of dates is ridiculously huge.
I want to filter the dates out and show only the dates for which there is data. How do I filter out the list of dates for a parameter?
how do i hide an attributes member value in all the reports where my cube is exposed as data source. Example : Lets say i have dimension called Product. Product
Name column Key column Product A 0 Product B 1 Product C 2
Now i need to create mdx query which will fetch member values except 0 key column value so that member values except 0 Key would be loaded in the parameter list. What is the best query so that i will run in to any performance issues. Is there any cube level setting i can do so that i will be doing one time job ?
Can i use Key() function to compare something like Key([Product].[Product Name]) >0 in the mdx query ot would Except() function would help?
I have a problem to browse the data in analysis server, it displayed: unspecified error, my os is windows xp with sp1 and sql server2000 installed, Do i need to install AS SP3 on the server, but, what are AS SP3 stand for, any other solution?
I have an SSRS report that gets its data from an SSAS cube, and it essentially displays a list of students and absences. Everything works fine.
But the users only want to see the top N students with the highest absences. For example, today they want to see the top 100, but during summer vacation, they only want to see the top 5.
Is there a way to add this parameter to the SSRS report? So if I select "5" from the dropdown parameter, it will show the top 5 absences.
The query that I use to populate the report is something simple:
SELECT NON EMPTY { [Measures].[Absences] } ON COLUMNS, NON EMPTY { ([Dim Date].[Date Key].[Date Key].ALLMEMBERS * [Dim Student].[Lte Cell Key].[Lte Cell Key].ALLMEMBERS ) } DIMENSION PROPERTIES MEMBER_CAPTION, MEMBER_UNIQUE_NAME ON ROWS FROM ( SELECT ( STRTOSET(@DimDateDateKey, CONSTRAINED) ) ON COLUMNS FROM [Daily Cube]) CELL PROPERTIES VALUE, BACK_COLOR, FORE_COLOR, FORMATTED_VALUE, FORMAT_STRING, FONT_NAME, FONT_SIZE, FONT_FLAGS
I have one dimension and one measure group. I deployed and processed the cube. Now I am able to browse the data. Now I added one more dimension. I deployed and reprocessed again the Cube. Now I am not able to see any values. I am getting like below.
I have a cube that we are processing nightly via an Analysis Service Processing Task in SSIS. In order to increase the performance of the processing time, we elected to use a lot of rigid dimension attributes, and do a full process of everything in the SSIS task. The issue that I am having is that after that task completes, I need to go into Visual Studio to deploy the cube becuase we are unable to browse or use the cube. This issue seemed to start once we changed the SSIS Analysis Service Processing Task to do a full process on the dimensions, rather than an incremental.
I would expect that once development is done, and it is processed and deployed, that is it. My thinking is that the SSIS task should just update the already deployed cube,
I've got a RS2000 report from Analysis services 2000. This report is working fine but after the upgrade to SQL2K5, i'm having issues with changes to parameters.
Basically i'm passing DateQuarter, CustomersLevel as parameters to the following mdx script. I've tried to change mdx script in RS2005 but no luck yet. I don't much about the parameter level changes in sql2k5. So can anyone suggest what is wrong in the script.
In sql2000 the script looks like this...
="with " & "member [Measures].[Ex Price] as 'coalesceempty([Measures].[Ex Price After Trade Discount - Detail],0.00)' " & "Member [Measures].[CustomerUniqueName] as '[Customers By Class].currentmember.UniqueName' " & "Member [Measures].[CustomerDisplayName] as '[Customers By Class].Currentmember.Name' " & "SELECT " & "{[Measures].[CustomerUniqueName],[Measures].[CustomerDisplayName]} on Columns, " & "filter({descendants(" & Parameters!CustomerClass.value & ", [Customers by Class].[" & Parameters!CustomersLevel.value & "], SELF)}, " & " [Measures].[Ex Price] > 0) on rows " & "from Sales "
i've changed the script in sql2005 but not working yet..
with member [Measures].[Ex Price] as 'coalesceempty([Measures].[Ex Price After Trade Discount - Detail],0.00)' Member [Measures].[CustomerUniqueName] as '[Customers By Class].currentmember.UniqueName' Member [Measures].[CustomerDisplayName] as '[Customers By Class].Currentmember.Name'
SELECT {[Measures].[CustomerUniqueName],[Measures].[CustomerDisplayName]} on Columns, filter({descendants( STRTOMEMBER(@CustomerClass), "[Customer Class]." + STRTOMEMBER(@CustomersLevel), SELF)}, [Measures].[Ex Price] > 0) on rows from Sales
I have a report which will one day display some data from an analysis services cube. my first step is to create a drop down parameter enabling the user to choose the date. I'd like to display only dates that have data, and I'd like it to default to today.
So I've created a dataset that will be the datasource for the dropdown displaying the available non-empty dates, which works fine.
SELECT measures.turnover ON COLUMNS,
nonempty([TBL DIM DATE].[DATE_ONLY].[DATE_ONLY].ALLMEMBERS ) ON ROWS
FROM [Itdev1 Hk]
I've also set the report parameter up to be a queried paramter,and to use the above dataset as it source, with [DATE_ONLY] displayed. and [DATE_ONLY] as the value.
Now, how do I get it to default to the last valid member in the list?
I have about 100 DTS packages and they were created by a user who has left the company. Now I( the new user)am trying to open the packages from another client machine and trying to save them back. I am connecting to SQL server where the packages are stored using NT authentication(domain account). When I try to save the package, I get the following error
Ole DB, Only the owner of the DTS package "packagename", or a member of the sysadmin role can create new versions of it".
What I have tried is that I can save the same package with a new name without being a member of the sysadmin role but I cannot save the package with the same name. ANy help will be greatly appreciated.
I had to build the report on reporting services 2005. My clients they used the MAC pc to connect my report server. But they can not bowse the report. So, I'd ike to know Is Reporting Services support MAC PC?
Has anyone encounted a problem with Reporting Services (2005) with the following scenario: A report with a dropdown parameter allowing a Select All choice -
If the selection list is fairly long and Select All is selected - if the user clicks the View Report button the selection list is completely reset (i.e. all items are unselected). This seems to happen if the user quickly clicks the View Report button immediately after clicking the Select All box on the parameter dropdown.
This happens inconsistently - some users experience it frequently while others do not see it at all (using the same parameter values, etc.)
I have parameters in my report. The user can choose the year, month and date (3 parameters). Now I want to set default vaules for the parameters , so that the user sees the report for example for the current day without selecting the parameters. I tried to set the type of the parameters to DateTime and the default value for example for the year to "=Today().Year" . But when I execute the report an error occures . Something like : no validValue for this parameter.
My Attributes for the year month and date are from an Analyis Services Cube from a Server Time dimension . Does somebody know how to make it possible to set default values for this parameters?
Other question :
Does somebody know how I can reduce the values for a parameter. For Example I have a parameter "year" from a server time dimension from a cube. The values which are available are "Year 2004", "Year 2005", "Year 2006", "Year 2007". But I want that the user only can choose "Year 2006" or "Year 2007" ant not every Year or "All". Or Other Example: The User should only choose a Date that is int the past or Today but not a Date in the future.
Hi All, One of my user was able create DTS package using DTS Wizard, working from his workstation and saved this DTS in Legacy(in Data Transaformation services) on different SQL 2005 EE SP 2(9.0.3042) production server.. At same time he has no access to msdb on this SQL 2005 server(he also not sysadmin for this server).. How this could happen..??
I was talking to my boss to day and our report request are not very consistant. We always having someone coming back to change something in our report. We were thinking of useing something called the Cube Analysis. Then it give our employees the raw data for them to run any standard query for themself. We have folks that want a report one way, but then they changed their minds and we are creating yet another report 4 or 5 times. what are your thoughts about this type of database?
I'm making my first attempt at creating a cube using Analysis Services based on my exisiting datamart. Datasource, views, and dimensions have been defined. But comes deploying the cube, it's giving the error saying "A connection cannot be made. Ensure that the server is running." The Deploy Target server and database are the same where my datamart is. Or, maybe I don't know what I'm doing.
Would appreciate any suggestion for my enlightenment. Thanks
I have a (hopefully typical) problem when it comes to cube design. Westore millions of product records every year, broken down bymonth/quarter. Each product can be assigned to various heirarchialclassification groups etc. The data in an OLTP DB occupies roughly100G for a typical year.We're looking at breaking this out into OLAP to provide faster accessto the data in various configurations and groupings. This is not aproblem, as this is the intended use for Analysis Services.The problem is that we apply projection factors on the product pricesand quantities. This would be ok if it only happened once, however,this happens every quarter (don't ask why). The projection factorschange 4 times a year, and they affect all historical product records.This presents a challenge because to aggregate the data into a usefulconfiguration in the cubes, you throw out the detail data, but thismeans throwing out the price and quantities which are needed to applythe projection.So if you have Product A at $10 and Product B at $20, and roll both upinto Category X, you'll have $30, but you'll lose the ability to applya projection factor of .5 to Product A and .78 to Product B. They'rerolled up.I don't want to regenerate the cubes every 3 months. That's absurd.But we can't live without the ability of projection theprices/quantities on a product level (detail level). So how can thisbe achieved when the other cubes are created at a higher level withless details and sums of the detail data?My initial guess is that we have to update the product data, and thenreaggregate all the other data that is built upon that product data.Is there any other way to apply math to the data on the way out?Thanks in advance!Regards,Zach
how can use this mdx script in the calculation part of a cube, will i simply dump it in the script form by starting with the 'create member current cube.
[measures].[test]' select [measures].[abc] on 0, [xyz].[xyz].(&0):[xyz].[xyz].(&60) on 1 from ( select (tail([month].[month].[month].members,6))on 0 from [cube])