I have already seen stored procedures that can calculate a difference in dates, excluding the weekends. Any extension of such a SQL query to exclude not only weekends, but other dates as well. We have a table of "holidays" (not necessarily standard holidays), and I am wondering if there is a way to exclude them from the calculation.
I have a table with a list of jobs along with their start and end datetime values.
I am looking for a function which will return the time taken to process a job using a start date and an end date. If the date range covers a Saturday or Sunday I want the time to ignore the weekends.
Example
Start Date=2014-05-15 12:00:00.000 End Date=2014-05-19 13:00:00.000
Total Time should be: 2 Days, 1 Hour and 0 Minutes
Hi, i'm trying to calculate the number of days between two dates, but within an UPDATE statement, so far I can't wrap my head around how I can update a field with the number of days.
I was thinking something like
Code:
Update #ClaimMaster Set covered_days = (then insert select statement that subtracts the two dates)
I have a table with appdt as first appointment date and the another record for the same customer# has follow up appointment.
Each customer is uniquely identified by a customer#
I need to find out if the customer came back after 200 days or more when the first appointment date was between jan12014 and Aug 31 2014. I am only interested in first follow up appointment after 30 days or more.
I would like to calculate difference between end_date and current date in Months.And also how we can calculate the sum of difference in months between start_date and end_date for each ID?
CREATE TABLE datedifference ( id INT ,start_date INT ,end_date INT ) INSERT INTO datedifference VALUES (10,20091202,20100629) INSERT INTO datedifference VALUES (20,20071202,20090330) INSERT INTO datedifference VALUES (30,20051202,20101031)
I have a field called 'LOG_COMMENTS' in a table named T_PRODUCTION_WORK_LOG.
In the 'LOG_COMMENTS' whenever a request is placed on hold comments are added by the application, such as 'Status changed from Open to On Hold' and 'Status changed from On Hold to Open' along with a 'LOG_DATESTAMP' field. A request can go on and off Hold multiple times, how do I determine the days a request is On Hold?
I know I can use the sql function DATEDIFF ( datepart , startdate , enddate ), but how do I account for the possiblity that the request was On Hold more than once? And how would I get LOG_DATESTAMP' times for 'LOG_COMMENTS' that contain 'Status changed from Open to On Hold' and 'Status changed from On Hold to Open''?
Select datediff(dd,Target_Date,Achv_Date) Now , checks are 1] when target date greater than achv_Date the difference should be greater than 0 means for FileID 77608 Select datediff(dd,'2015-09-24 00:00:00.000','2015-09-24 10:42:32.823')
i am getting -6 it should be 6 cant switch Target_Date and Achv_Date in datediff else i will get opposite result in first four records basically, i want a two column TAT and Status beside achv_date based on the values of two dates difference see above ..and also want a result of (No. of Yes in status / No. of Files that has achv_date )i.e. result= (7/8) = 87%
Iam trying to calculate the number of working days between two dates. Iam getting the uouput as only 1 02 r working days??
select building_number as SchoolID,building_name as Campus, count( distinct( CASE WHEN(( DATEPART(dw, CurDate) + @@DATEFIRST)%7 NOT IN (0,1)) tHEN 1 ELSE 0 END)) as NumberofDaysServed from Sales sl join Buildings b on sl.Building_Num =b.Building_number join students2 s on s.Student_Number= sl.Student_Num join Sale_Items SI on si.UID = sl.UID where CONVERT(CHAR(10),CurDate,120) between '2015-05-01' and '2015-05-07' and VoidReview <> 'v' and SI.INum = '1' group by building_number,building_name order by building_number,Building_Name;
Does anyone know how to write code to tell the amount of days between 2 dates excluding Saturday and Sunday. Datediff will tell me the total amount of days and I guess I need some logic to look at the startdate and manipulate the total after the fact.
I have two datetime fields that I would like to find out how much time has passed between them. First field is "start date" and the second is "end date" the dates in both fields are in this format (03/27/2008 4:00PM). The problem I am having is I need to exclude the time passed from Friday, 6:00PM to Monday, 7:00AM if the dates happen to go over a weekend.
Today I have got one scenario to calculate the (sum of days difference minus(-) the dates if the same date is appearing both in assgn_dtm and complet_dtm)/* Here goes the table schema and sample data */
IF EXISTS (SELECT * FROM sys.objects WHERE object_id = OBJECT_ID(N'[dbo].[temp_tbl]') AND type in (N'U')) DROP TABLE [dbo].[temp_tbl] GO CREATE TABLE [dbo].[temp_tbl]( [tbl_id] [bigint] NULL, [cs_id] [int] NOT NULL, [USERID] [int] NOT NULL,
I am having trouble creating a sp for the following situation:
The database contains a record of the mileage of trucks in the fleet. At the end of every month, a snapshot is collected of the odometer. The data looks like this:
i have a matrix, and in that matrix i need to have one column which calculates the percentage change between a value on the current row and the same value on the previous row.
Is this possible? The RunningValue() function isn't of help as it can't help me calculate the change between two rows, and Previous() doesn't work in a matrix (why???!!!!!). Also calculating this as part of the query isn't possible as there is a single row group on the matrix, and the query is MDX.*
Thanks,
sluggy
*for those who are curious, the matrix is showing data an a per week basis, the row group is snapshot date, i am trying to measure the change in sales at each snapshot.
so I have some data that looks like this: semester weekOfSemester counts Fall 2006 4 1 Fall 2007 4 6
I want to eventually graphically represent this data over the 18 weeks of the semester in terms of Fall 2007. I need to show change weather positive or negative as a percentage against Fall 2006. Can someone help with the sql?
i am using this expression to get the time difference between two times.
{%Z.elapsed.time(@AK.VD.depart.date,@AK.VD.depart.time,@AK.VD.depart.date,@DV.VD.arrival.time,"hh.hh")*60} as [LOS (min)]
When Arrival time and depart time both are on same day above expression working to get the diference .
But if arrival date 2013-09-20 00:00:00.000 and arrival time 0800 and depart date 2013-09-21 00:00:00.000 and depart time 0050 when i calculate the time difference(using above expression) between these two i am getting -429.60 which is wrong. i have to get around 990.
I'm kinda stumped.... How would one find the first and and last date in a date range defined by a DATEPART, regardless of the parameter?
For Example... DATEPART(wk,7/31/2000) would return 7/30/2000 and 8/5/2000 DATEPART(qq,7/31/2000) would return 7/1/2000 and 9/30/2000 DATEPART(yy,7/31/2000) would return 1/1/2000 and 12/31/2000
Basically I want to calculate the time spent by S_Users on a particular S_ACTV_CODE:
- S_ACTV_CODE_PREV means the previous active records.
- S_START_TIME is the time of S_DATETIME when a S_ACTV_CODE starts
- S_END_TIME is the time before a S_ACTV_CODE changes to another S_ACTV_CODE
- For the first record, S_ACTV_CODE is null, so there is no S_ACTV_CODE_PREV, so S_ACTV_CODE_PREV is NULL
- For the second record S_ACTV_CODE has some value, but S_ACTV_CODE_PREV is NULL for first record. So second record S_ACTV_CODE_PREV is also NULL
- For the last record (means S_ACTV_IND = 1), the user is currently working on it and S_ACTV_CODE is not changed. So S_END_TIME is a open time and we want to keep it as NULL
I was wondering how you perform a select statement based on a specific date that will show all the records no matter which times belong to the specific date.
I have been having trouble with this one when using a single date, I think this is because of the time property as no records are displayed.
I have two nvarchar fields with time data 12:34:34 and the second one 12:34 I want to calculate the difference in Hours. The first field is called (OTIM) the second field is called (ReportedTime) if the name matters. I tried substring to trim the OTIM, I am unable to make it work.
I am trying to write a query to calculate the running difference between data on different dates. Below is what my table of data looks like. Basically I want to calculate the difference between the total_completed for each state and date.
below is my code (I almost have what I need) I just can't figure out how show 0 as the completed_difference for the first Date for each state since there is no prior date to calculate against.
MRR_TOTALS_WEEK_OVER_WEEK AS ( SELECT T1.[Date] ,T1.States ,T2.Total_Completed ,ROW_NUMBER() OVER(PARTITION BY T1.States ORDER BY T1.States,T1.[Date]) AS ORDERING FROM TOTAL_CHARTS T1 LEFT JOIN TOTAL_COMPLETED T2 ON T1.[Date] = T2.[Date] AND T1.States = T2.States )
i was wondering if it was possible to get the difference bettween the current date/time and a date feild and store it in a feild in the same table. id like to do this to prevent constant php update querys.