DTS Not Running As Schedule Job

Jun 27, 2001

Hi all,
I am having one DTS package which is excuting fine. When it is put on schedule job it is not working.
DTS package coded in VB script which calls a batch file (command prompt runnable). Schedule job history telling that job run successful but actually the process fail.
Also i tried to schedule the job using Excmd in schedule job which is also not working...

Can any one tell why it is not running.
Any recommendations?
thanks in advance.

regards,
Nana

View 1 Replies


ADVERTISEMENT

Error Running Schedule Job

Nov 5, 2007

I have this SSIS Package that it works when I run it on development on Visual Studio. But when I imported it and schedule the job, it gives me the following error: 
Executed as user: MAINOFFICEASPNET. ... 9.00.3042.00 for 32-bit  Copyright (C) Microsoft Corp 1984-2005. All rights reserved.    Started:  2:38:39 PM  Error: 2007-11-05 14:38:41.02     Code: 0xC0202009     Source: Export_WHSCANP Connection manager "10.5.1.10.DRDB400.aspnet1"     Description: SSIS Error Code DTS_E_OLEDBERROR.  An OLE DB error has occurred. Error code: 0x80004005.  An OLE DB record is available.  Source: "IBMDA400 Session"  Hresult: 0x80004005  Description: "CWBSY0002 - Password for user ASPNET on server 10.5.1.10 is not correct ".  End Error  Error: 2007-11-05 14:38:41.04     Code: 0xC020801C     Source: Data Flow Task OLE DB Destination [801]     Description: SSIS Error Code DTS_E_CANNOTACQUIRECONNECTIONFROMCONNECTIONMANAGER.  The AcquireConnection method call to the connection manager "10.5.1.10.DRDB400.aspnet1" failed with error code 0xC0202009.  There may be error messages posted before this with more information on why the AcquireConnec...  The package execution fa...  The step failed.
 
This is trying to get a table from the SQL server and copy it to an IBM AS400 server. Any ideas?
Thanks,
 Erick

View 3 Replies View Related

Query Running On A Schedule

Apr 29, 2008

Can someone please let me know how i can set up a query to execute once a week lets say on tuesdays at 6 am...
i do not see how i can set this. can anyone help me please

View 1 Replies View Related

SQL Server 2008 :: Job Details In Running Schedule In Minutes

Aug 6, 2015

In my requirement,My production server running more then 5 jobs . I want details in running schedule in minutes. For example

1) First Job

I am configured every one hour.

2) Second job

Configured in every 30 min

3) Third job

Configured every 60 min

4) Fourth Job

Configured every 24 hrs

I want the result

SNOJOBNameRunning Schedule(in Min)
1First JOB 60min
2Second JOB 30 min
3Third JOB 60min
4Fourth JOB 1440min

View 1 Replies View Related

TempDB Log File Running Out Of Free Space While Running DBCC CheckDB On Large Database

May 28, 2015

In my environment, there is maintenance plan configured on one of the server and while running DBCC checkdb on a database of size around 200GB, log file usage of tempdb is increasing and causing the maintenance job to fail.

What can I do to make the maintenance job run successfully, size of the tempdb database is only 50GB and recovery model is set to simple. It cannot be increased as the mount point on which it is residing is 50GB.

View 3 Replies View Related

How To Kill A Long Running Query Running On A Background Thread.

Sep 1, 2006


If I start a long running query running on a background thread is there a way to abort the query so that it does not continue running on SQL server?

The query would be running on SQL Server 2005 from a Windows form application using the Background worker component. So the query would have been started from the background workers DoWork event using ado.net. If the user clicks an abort button in the UI I would want the query to die so that it does not continue to use sql server resources.

Is there a way to do this?

Thanks


View 1 Replies View Related

Stored Proc Is Running Much Slower Than Running The Script Directly

Mar 14, 2008

One of my stored procs, taking one parameter, is running about 2+ minutes. But if I run the same script in the stored proc with the same parameter hardcoded, the query only runs in a couple of seconds. The execution plans are different as well. Any reason why this could happen? TIA.

View 6 Replies View Related

How To Schedule A Job Using ASP

Jan 25, 2008

http://msdn2.microsoft.com/en-us/library/aa177009(SQL.80).aspx
i need to schedule asp code execution using SQL Stored Procedure ...im not allowed to connect using Enterprise Manager is it possible in ASP and in case how?

View 1 Replies View Related

How To Schedule The Job?

Jun 17, 2008

 
Hi all,
   I want to make a job schedular in SQLServer 2005. That is i want to send email to users daily at 12:00 PM.
how can i schedule using SQLServer Agent in SQLServer 2005. And i want to filter the users from user table. Please help me 
Thanks!

View 1 Replies View Related

Job Schedule

Jul 17, 2001

Hello,

I would like to schedule a job every 30 sec. The min time in job schedule is it allows 1 min. Is there a way I could run the job every 30 sec.

Thanks

Moin

View 3 Replies View Related

Job Schedule

Jul 20, 2000

How Do I schedule Sql server Jobs in interval of Seconds in place on minute/Hours? Is it possible in Sql Server?
Thanks..

View 1 Replies View Related

DTS Schedule

Dec 11, 2000

Hi

I have lots of DTS Packages that I am running manually daily and I am trying to create schedule all of those and all of them are failing. Some of those are accross domians,but the owner on both domains have same userId and password.

Any Idea why this is failing would be really helpful

thanks in Advance
taapas

View 1 Replies View Related

DTS Job Schedule

Jan 17, 2002

Hi

I would like to import data via DTS from one db to another to run every half hour.What would be the easier way to do this?Should I setup a job to run every half hour?

If anyone could help with some suggestions , it would be appreciated.

View 1 Replies View Related

Schedule An EXE Job

Jun 21, 2001

When I try to schedule a DTS package which is an EXE it doesn't run.
If I just run the DTS package it works fine.
I have checked the permissions of the DTS scheduled package and made sure
it had proper rights. SQL Server Services were started with the proper security rights.
When I schedule the DTS package, it is being done on the Server, and not a workstation.
Any ideas on why it will not run?...

Also, How do you schedule and EXE under SQL Server Agent Jobs.
Even when I schedule an EXE that is not a DTS package it doesn't run...

Thanks,

Daniel

View 1 Replies View Related

Sql To Schedule A Job

Jun 19, 2008

Can any one tell me how to schedule a job using sql query

View 2 Replies View Related

Job Schedule

Sep 27, 2006

is there a way to make a job schedule that running store procedure for msql express ?

i'd like to make a time counter that will update every minute.

thanks

View 1 Replies View Related

Job Schedule

Mar 16, 2007

I have almost completed a full project by myself which is soooo exciting. The last thing I need to do is schedule a job to run the query on a specific day and time. So how do I do this? It asks me for a command and I am not sure what I am supposed to enter in here.

The Yak Village Idiot

View 7 Replies View Related

Schedule An Sp To Run

Jun 5, 2007

How could I get an sp to run every morning at 1.00am. It would delete empty entries from a sql database.

Thx

View 2 Replies View Related

Schedule DTS

Nov 1, 2007

Im trying to schedule a DTS package that I have created. When I right click on the package in Enterprise Manager and click on "Schedule" I get the options to set up the job to run on a schedule.

I fill out the time and click "OK". But when I immediately right click on the package again, all my settings are gone, and the defaults are back in place.

How do I know if the package will run- or if it did run?

I would actually prefer to run the job from a command line using a Scheduled Task... What would the syntax be? My DTS Local Package is named "IMPORT_DAILY_UPDATE"

Thanks

View 2 Replies View Related

Job Schedule

Nov 8, 2007

on ss2k5, how do you find out if sql job schedule is enable using QA?




http://www.sqlserverstudy.com

View 5 Replies View Related

Schedule

Jul 20, 2007

How is it possible to schedule a SSIS package to run at a certain time please?

View 13 Replies View Related

Schedule A Job

Jan 9, 2008

Hi all,

I create a new in SQL Server Agent. However, When I click start Job at step, the first step start immediately,not the schedule I set. So How can do I make it to run at the schedule time?

Thank you

View 7 Replies View Related

Schedule DTS Package

Mar 5, 2004

I have MS SQL installed on my workstation at work. I am trying to use DTS to export data from our local network that uses a Pervasive DB to our web server that is hosted with another company.

If I go in and manually execute the DTS package from my workstation, it send the data to the web server.

If I try to schedule the DTS Package to automatically send the data, it fails. SQL Server Agent is running on my workstation and on the web server.

Is what I am trying to do possible? What am I doing wrong?

View 1 Replies View Related

Schedule Representation

Sep 14, 2004

Kinda general question -but before I embark on my own design I thought I ask around. . .

What I want to design is database representation of a schedule of a roster. For instance a school roster. I hope I am not being too general here.

View 1 Replies View Related

Schedule A Job A Sql Server

Aug 2, 2005

I want to create a job to run once a week in sql server agent jobs.  Setting up the the job to run is no problem.  I want the job to run a sql statement that will retrieve sql.  I then want the records to be inserted in a txt file.   What is the best way to accomplish this.

View 2 Replies View Related

Pack Will NOT Schedule......

Nov 4, 2005

anyone ever encountered this....i have a package which will execute fine manually but when i try to schedule it, it fails immediately (within the first second).i can even right click on the scheduled package and do "generate sql script" and then run that script and again, no problem. it just will NOT schedule.any ideas?

View 3 Replies View Related

Can't Schedule DTS Package

Mar 19, 2001

Hi All

I'm having problems scheduling a DTS package.

The server is SQL 7 sp2 running on NT4 sp5. The only other twist is that it's at a remote site that I connect to via NT Dial-up.

When I choose the 'Schedule Package...' menu option I get the normal dialog to set frequency etc... but the job isn't created.

Any guidence at all would be most appreciated.

Thanks
Phill

View 1 Replies View Related

DTS Schedule Problem

Mar 23, 2000

I create DTS package and when I want to schedule the package an error occures. The message says :
Microsoft SQL-DMO
Connection user failure (null)
Non associate to a secured SQL server link

Do you know what happened ?

View 1 Replies View Related

Can't Schedule A DTS Package

Oct 19, 1999

Hello and thanks for reading my post...

I have a DTS package that I can execute manually all I want, no problem.

However, when I try to schedule the package to run as a job, it error when it tries to connect to my remote database, giving me comments about the ODBC driver (which is installed correctly).

My best guess is that when I run it manually, it running under my userid/password (NT authentication), but when it runs as a job, it is using the SQL Agent, which has a different level of authority somehow.

This may be a no-brainer, but I've looked at everything I know of.

Please help!

View 4 Replies View Related

Schedule Task

Feb 2, 2000

is it posible to change a file name usinging schedule task??
I used this syntax
Exec xp_cmdshell "REN
E:Elsie_DB_db_dump*.* E:Elsie_DB"

Is there another way of doing it??

View 3 Replies View Related

Preventing Schedule Job To Run

Mar 25, 2003

Hi,

I have 2 jobs schedule to run after every alternate hour. Job A runs at 1 am, 3 am, 5 am etc. and job B runs at 2 am, 4 am , 6 am.

If job A is still running I would like Job B not to start at the scheduled time. How can I achieve this?

Thanks in Advance .... j

View 3 Replies View Related

How To Schedule DB Restore?

Jul 9, 1999

Hello there,

Is there any way to schedule SQL Databases restore (maybe from a command script) on Windows NT4,
SQL server 6.5 sce pack 5a ?

Thanks!
Regards,
Rachel

View 3 Replies View Related

Schedule Task In Sql?

Apr 20, 1999

Does anyone know of any way to schedule a task using only transact sql, or is using Enterprise Mgr the only way to do this?

View 1 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved