Error In Processing Cube (Microsoft Analysis Services)
Jan 9, 2004
Hi,
I am processing one cube using Full Process option and it's giving
following error.
Analysis Server Error: Internal error [Object does not exist] '11948' ;
Time:1/8/2004 6:11:11 PM
Error(-2147221421): Internal error (Internal error [Object does not
exist] '11948' ); Time:1/8/2004 6:11:11 PM
Can anyone help me on this.
View 1 Replies
ADVERTISEMENT
Apr 24, 2015
I am trying to configure the reporting for TFS using SQL Server. But I get following error when viewing any report:
So I try to manually process the cube to check if it works. I am following this article: [URL] ....
When I click on GetProcessingStatus and invoke it (with last field set as TRUE) I get following error:
How to resolve this issue and be able to see the reports.
View 5 Replies
View Related
May 13, 2014
I have a cube that we are processing nightly via an Analysis Service Processing Task in SSIS. In order to increase the performance of the processing time, we elected to use a lot of rigid dimension attributes, and do a full process of everything in the SSIS task. The issue that I am having is that after that task completes, I need to go into Visual Studio to deploy the cube becuase we are unable to browse or use the cube. This issue seemed to start once we changed the SSIS Analysis Service Processing Task to do a full process on the dimensions, rather than an incremental.
I would expect that once development is done, and it is processed and deployed, that is it. My thinking is that the SSIS task should just update the already deployed cube,
View 2 Replies
View Related
Oct 19, 2007
We have set up an IS package to process an AS 2005 database (comprising cube & dimensions, etc) daily, via a SQL Server Agent job on both development and production systems. This has been working fine for months.
A new dimension was added to the cube on the development system - automatic processing via the IS package continued without issue. However, when the new dimension was added to the production system the IS package no longer processes the cube correctly. Although all appears ok (and all is present and correct in the logs), no data updates to the cube are made. Only when the cube is manually processed does the cube get updated.
Anyone got any ideas about how to get around this issue? We have created a new IS package, with a single Analysis Services Processing Task, and tried this but get the same outcome.
View 4 Replies
View Related
Aug 11, 2004
Can I create a cube file, .cub ,without the Microsoft Analysis Services
Pls Guide me as I am new in this field.
Thanks
Loyd
View 3 Replies
View Related
Jul 11, 2007
We have an Integration services package that executes a few TSQL tasks, then processes an Analsys Services database. This has been in production for about three weeks now and twice the package has failed with this error from the event log:
Event Type: Error
Event Source: MSSQLServerOLAPService
Event Category: (289)
Event ID: 3
Date: 7/11/2007
Time: 1:48:59 AM
User: N/A
Computer:
Description:
OLE DB error: OLE DB or ODBC error: An error has occurred while establishing a connection to the server.
When connecting to SQL Server 2005, this failure may be caused by the fact that under the default settings SQL Server
does not allow remote connections.; 08001;
Communication link failure; 08S01;
TCP Provider: An existing connection was forcibly closed by the remote host.
; 08S01.
For more information, see Help and Support Center at http://go.microsoft.com/fwlink/events.asp.
I don't think that this error is accurate because the package and Analysis Services are on the same server.
Also, this does not happen in our development environment. Any help is appreciated.
Thanks,
Brian
View 1 Replies
View Related
Apr 8, 2008
Hi There,
I've got this error coming up while running the sql job for AS processing. I can't find anything about it on google or anywhere else. Has anyone had issues like this?
Code Snippet
Executed as user: xyzsvc_sqlsvr. Microsoft (R) SQL Server Execute Package Utility Version 9.00.3042.00 for 32-bit Copyright (C) Microsoft Corp 1984-2005. All rights reserved. Started: 1:21:02 PM Error: 2008-04-04 13:21:07.41 Code: 0xC1000000 Source: Analysis Services Processing Task Analysis Services Execute DDL Task Description: Internal error: An unexpected error occurred (file 'mdprocessdim.cpp', line 3429, function 'MDProcessPropertyJob::OnLaunch'). End Error DTExec: The package execution returned DTSER_FAILURE (1). Started: 1:21:02 PM Finished: 1:21:07 PM Elapsed: 5.141 seconds. The package execution failed. The step failed.
Thanks
Vivek
View 5 Replies
View Related
Apr 21, 2015
I have designed a cube. It has two fact tables and some dimensions. Fact table to fact table is many to many relationship.
For example
FactMain
DataKey(PK), StartDateKey, PostCodeKey, TotalCost
FactBridge
DataKey(FK), ProductKey(FK), Position - PrimaryKey on DataKey + ProductKey + Position
DimProduct
ProductKey(PK), ProductCode
Cube is built successfully, processed successfully.When I try to process the cube from agent job, I am getting error "Attribute key not found: tablename, value..." I have added a job step to run AnalysisServices Command. I have taken the command from cube process script(taken from manually process the cube and take script generated). I used ProcessAffectedObjects = "true" in the script. When I checked the tables, the key does exist. Why am I getting this error?
View 5 Replies
View Related
Jul 30, 2015
I am getting following errors when i processed Cube in Production.An error occurred while the dimension, with the ID of 'DIM_PARTICIPANT', Name of 'DIM_PARTICIPANT' was being processed.
End Error
An error occurred while the 'PARTICIPANT NAME' attribute of the 'DIM_PARTICIPANT' dimension from the 'XL_GCS_SelfServices' database was being processed.
End Error
An error occurred while the dimension, with the ID of 'v d Transaction', Name of 'DIM_TRANSACTION' was being processed.
End Error
An error occurred while the 'INVOICE NUMBER' attribute of the 'DIM_TRANSACTION' dimension from the 'XL_GCS_SelfServices' database was being processed.
End Error.
But i implmented same in Dev and QA server, there is no issues found.
View 4 Replies
View Related
Sep 5, 2006
hi,
I try to generate ad hoc reporting model for analysis services cube in reporting services.
in Management Studio I connected to reporting services, defined a data source to the analysis services database.
But If i try to generate model i get the error:
"While connection with a data source a mistake has appeared, or the query is invalid for the data source. (rsCannotPrepareQuery)(Report Services SOAP Proxy Source)"
Any ideas as to what may be the problem?
Thanks!
karaman
View 3 Replies
View Related
Mar 5, 2007
I have an Analysis Services Processing Task in my SSIS package. I run the SSIS package using SQL Server job, the running of the package is a job step.
When I process manually the analysis services objects (in practise cubes) using dtexec utility I get a lot of log. In case the processing fails I get error messages that quite well describe the error. But when I run the job the only information I get in the job log is that the job step failed. I know the failure happens in the Analysis Services Processing Task.
Is there any way in SSIS to get a) the log of the Analysis Services processing or b) the error messages of the Analysis Services processing? Or should the processing be done some other way than I've been doing?
View 4 Replies
View Related
Apr 16, 2015
I am working on SQL 2012.We have a SSAS Cube build. On top of it client use Excel to connect to SSAS Cube and See the reports.My Cube process every hour and take almost a 1-2 min to Process.When ever End user/Client See or refresh the Excel report (Which use Cube as Source),WHEN CUBE IS PROCESSING ,they get an error that Source is not available
We Have tried best but cannot bring down the Processing time of the cube to 3-5 Second , so that End user don't face report refresh issue at the moment of cube processing
Requirement :In Case End User see the report while Cube is processing from back end , Instead of Error they should see some customize Msg which we can provide some thing Like "Data is Refreshing , please wait ".
View 5 Replies
View Related
Apr 24, 2014
I Have one cube, First time its Processed successfully and browsed fine. Now i was change in the cube Calculations/somewhere, now again process the process failed. I am unable to browse my cube. Is there any option to Rollback this processed cube and Browse with existing cube?What is require is, If cube process is fail, i want to browse the cube with existing cube after modify the cube also(if fails).
View 9 Replies
View Related
Sep 14, 2015
I am trying to create a Adventure Works Tabular cube in my developing machine and im having problems deploying the tabular cube (the DW database was firstly attached without problems)
So I'm having problems processing Adventure Works Tabular Cube, the problems are somewhere between SSAS project configuration and running privileges, i think. I'll describe exactly where i am:
- in SSMS 2012, connections, tables and roles and roles are empty, i only have the full name of the database when I try to process i get an error "the table with id of "product category 92583829......", Name of Product Category refereced by the model Cube, does not exist. An error ocurred when loading the model cube, '?c:program filesmicrosoft
sql serverMSAS11.MSSQLSERVEROLAPDataAdventureWorks Tabular model SQL 2012.0.dbModel.21.cub.xml'. (Microsoft AnalysisServices.)"
- in SQL Server configuration Manager, I have
Sql Server (MSSQLSERVER) running with account NT ServiceMSSQLSERVER
Sql Server Analysis Services (MSSQLSERVER) running with account .L.ABCDE , which is my account, i've changed because i've read somewhere that i could have problems with privileges.
(Note: it's strange because SSAS is tabular, i can see a blue rectangle (sort of) in SSMS but in configurator manager seems to be a cube.)
- in SSAS Project i unzip a clean copy of the project and the first error is that BIM file can't be found, it try's to find server TOSHIBA_S50_BTAB, but as i have only tabular SSAS running, i replace for TOSHIBA_S50... And some time ago it worked, now it doesn't even found TOSHIBA_S50_B?!!!!
View 3 Replies
View Related
Nov 10, 2015
I am trying to incrementally update a Cube to get near real time data for the end users. Currently we have a Sql server agent Job that does a FullProcess on the Cube. The Cube consists of a single Measure group which is simply one named query containing inner joins of all the dimensions and fact tables in the underlying relational database. The end users have a lot to upload during the day and they would like us to refresh the cube (near real time) to ensure the adjustments are loaded so that they could reconcile their daily PnLs. We have a MeasureId added which is an auto increment column in the Measures table.
I am trying to schedule the below XMLA query in Sql server agent Job and schedule it to run every 15mins or even less (if possible). However it seems to be not working and keep throwing all sorts of errors.
DECLARE @LastMeasureId AS INT, @myXMLA nvarchar(max)
SELECT @LastMeasureId = "[Measures].[Maximum Measures Id]" FROM
OpenRowset(
'MSOLAP',
'DATA SOURCE=L68F728326574; Initial Catalog=GMDR;',
'SELECT NON EMPTY {[Measures].[Maximum Measures Id]} ON COLUMNS FROM [GMDR]');
[Code] ....
View 2 Replies
View Related
Jun 12, 2015
How to right choose key column in"Mining Structure" for Microsoft Analysis Services?
I have table:
"Incoming goods"
Create table Income (
ID int not null identity(1, 1)
[Date] datetime not null,
GoodID int not null,
PriceDeliver decimal(18, 2) not null,
PriceSalse decimal(18, 2) not null,
CONSTRAINT PK_ Income PRIMARY KEY CLUSTERED (ID),
CONSTRAINT FK_IncomeGood foreign key (GoodID) references dbo.Goods ( ID )
)
I'm trying to build a relationship(regression) between “Price Sale” from Good and “Price Deliver”.But I do not know what column better choose as “key column”: ID or GoodID ?
View 2 Replies
View Related
Oct 11, 2007
Hello, I have a problem when trying to fully process an SSAS database using Integration Services "Analysis Services Processing Task" task. I have 2 of these tasks which are responsible for processing the Dimensions then the Cubes. When I run the package either via the BIDS environment or on the local server from the Integration Services engine, I will get an error after about 20 minutes stating:
"Error: Memory Error: Allocation failure. Not enough storage is available to process this command""Error: Errors in the metadata manager. An error occurred when loading the <cube name> cube from the file \?D:Program FilesMicrosoft SQL ServerMSSQL.2OLAPDataMyWarehouse<cube file>.xml"
The cube name is not specific, it will fail and any of my cubes could be in the error log
If I fully process the AS database using the AS engine (logon to local AS server, right-click AS database and click Process), I get no errors at all, it processes and completes fine. The processing options are identical when I run in AS or via the SSIS "Analysis Services Processing Task" task.
I've searched quite a lot online but no joy, the information I have gleaned from various sites does not directly link SSIS with SSAS processing problems.
When either the AS processing starts via SSAS or SSIS the memory usage of MSMDSRV.exe increases to around 1.4 / 1.5 GB but never goes to 2GB ever, even when the error appears.
I've done the following with no effect.
" Have run via AS and works fine
" No specific cube it fails on
" Have created a Dimension only package, same problem
" Changed the maxmemorylimit
" Changed the connections to localhost
" Memory DOES NOT max out on server
Server Specs:
Windows Server 2003 Standard + Service Pack 2
4GM ram, 2GB paging file
SQL Server 2005 + Service Pack 2
Can anyone help?
Andy
View 2 Replies
View Related
Aug 14, 2000
When I process a new cube I recieve an error "Error (211): Unknown dimension member ' 8'; Time: 8/11/00 1:09:45 PM". Any ideas about what this error is about ?
View 2 Replies
View Related
Apr 14, 2004
Hi,
I am trying to Process a analysis server Cube and I am getting an error message saying
syntax error converting the varchar value A.H to column of type int.; 22018.
Can somebody tell me how to remove this error.
Thanks,
Praveen
View 2 Replies
View Related
May 16, 2008
I just started getting a new error message to me:
Errors in the high-level relational engine. The data source view does not contain a definition for the 'WeightRecieved' column in the 'dbo_factPurchases' table or view.
The problem is WeightReceived IS defined in my DSV so I don't know what to do about this error.
Any suggestions?
View 4 Replies
View Related
Nov 4, 2009
i am getting the following error when i am processing the cube in SSAS 2008...Errors in the back-end database access module. The size specified for a binding was too small, resulting in one or more column values being truncated. Errors in the OLAP storage engine: An error occurred while the 'Policy Type' attribute of the 'Policy Type' dimension from the MyDemo' database.i verified the datatype column length for policytype column in the dimension as well as all fact views.
View 9 Replies
View Related
Apr 9, 2008
Hi. I have an Analaysis Services (2005) cube with four dimensions and one fact table (with three partitions - 2006,2007,2008) for which I need to create an SSIS package to process. I only want to process one of the three partitions (2008) - the previous two years should remain unchanged.
This is what I have currently in the Analysis Services Processing Task under Processing configuration:
- An object for each of the dimensions with "Process Full."
- An object for the 2008 partition with "Process Full."
(Note - Under Process Options, I see only Process Default, Process Full, Unprocess, and Process Data for dimensions and partitions).
Batch settings are:
- Processing order: Sequential
- Transaction mode: All in one transaction
- Dimension errors: Ignore errors
- Process affected objects: Do not process
When I execute the package, the cube loses the 2006 and 2007 data.
I am assuming that I have an issue with the Process Option or the Batch Settings, and I would appreciate any guidance!
Thanks,
Marianne
View 6 Replies
View Related
Mar 11, 2008
Hi all, here is my problem:
The last node of my workflow in SSIS is an analysis Services Processing Task, which is supposed to fully reprocess a cube, defined in a different project.
In the configuration, I found the correct cube and setups for it, I thought I wasn't gonna have any problems with it, but it started to complain about user and password information. I thought since the databases configured itself when I added them, the same thing would happen with this Task.
I do have my own user and pass which has permissions to reprocess the cube, although I thought windows authentication would be better then setting up a user and password for the application/task.
I looked in the entire configuration pane and found no information regarding username and password.
Where should I set it up, my SSIS solution or the Cube's solution?
This might be a newbie question, I'm not quite sure...
EDIT: Here is the error message:
[Analysis Services Execute DDL Task] Error: The following system error occurred: Logon failure: unknown user name or bad password. .
View 5 Replies
View Related
Feb 21, 2008
Hello
I am trying to run Olap Cube 2000 inside SSIS project.
I am using "Analysis Services Processing Task" Object.
The Visual Studio Project is sitting on the machine where the
analysis 2000 is running but yet i get an error while establish
a connection to the Analysis server.
On that machine also install MICROSOFT SQL SERVER 2005 .
the error is:
A Connection Cannot be made . Ensure that the server is running.
Does Anybody have an idea to why i get this Error.
Thanks,
View 1 Replies
View Related
Jun 21, 2007
I'm making my first attempt at creating a cube using Analysis Services based on my exisiting datamart. Datasource, views, and dimensions have been defined. But comes deploying the cube, it's giving the error saying "A connection cannot be made. Ensure that the server is running." The Deploy Target server and database are the same where my datamart is. Or, maybe I don't know what I'm doing.
Would appreciate any suggestion for my enlightenment. Thanks
View 1 Replies
View Related
Jun 30, 2007
I setup Hiarchy in the dimentions of my cube, however when I go and look at it via proclarity, I can't see the hiearchy there.
I have one table that has:
Category
Subcategory
Partnumber
And I have the hiearchy set from Subcategory to partnumber.
Then I go into proclarity and limit the category by "my catname" and I still see the 8000 partnumbers in the list.
Any ideas?
View 1 Replies
View Related
Jul 20, 2005
I have a (hopefully typical) problem when it comes to cube design. Westore millions of product records every year, broken down bymonth/quarter. Each product can be assigned to various heirarchialclassification groups etc. The data in an OLTP DB occupies roughly100G for a typical year.We're looking at breaking this out into OLAP to provide faster accessto the data in various configurations and groupings. This is not aproblem, as this is the intended use for Analysis Services.The problem is that we apply projection factors on the product pricesand quantities. This would be ok if it only happened once, however,this happens every quarter (don't ask why). The projection factorschange 4 times a year, and they affect all historical product records.This presents a challenge because to aggregate the data into a usefulconfiguration in the cubes, you throw out the detail data, but thismeans throwing out the price and quantities which are needed to applythe projection.So if you have Product A at $10 and Product B at $20, and roll both upinto Category X, you'll have $30, but you'll lose the ability to applya projection factor of .5 to Product A and .78 to Product B. They'rerolled up.I don't want to regenerate the cubes every 3 months. That's absurd.But we can't live without the ability of projection theprices/quantities on a product level (detail level). So how can thisbe achieved when the other cubes are created at a higher level withless details and sums of the detail data?My initial guess is that we have to update the product data, and thenreaggregate all the other data that is built upon that product data.Is there any other way to apply math to the data on the way out?Thanks in advance!Regards,Zach
View 2 Replies
View Related
Apr 1, 2008
All,
I 'm using 'Analysis Services Processing Task' as part of a SSIS package to refresh the cube. in the property page,
the 'loggingMode' is set 'enabled', but there is no records in the sysdtslog90 table while all other tasks are logged in the table. How to logging into the sysdtslog90 table?
Thanks in advance
Jessie
View 3 Replies
View Related
Dec 8, 2005
If there are any AS gurus out there, I could use some help. I've been having some problems with particular AS dimension and cubes and it's driving me crazy! It doesn't matter what I do, nothing seems to work.
Anyway, here's what I'm trying to do. I've got a fairly simple dimension. There is a date stored in the dimension that is formatted as an int. The dimension needs to only display AGE, so I cast the int as a date and do a datediff to get AGE. The dimension builds just fine and I get the results I want. My problem is when I add the dimension to the cube. The cube fails to build and I get an error message - "Data source provider error: The column prefix 'MY TABLE' does not match with a table name or alias used in the query." Basically, AS is telling me that the table that is used for the dimension doesn't exist, even though the fact and the dimension are joined properly and I've validated the structure.
I've run a number of queries in QA on the two tables and everything works fine. No funky data issues. I've run the service packs a few times, but that didn't work either. I've tried making a cube that only has the just fact table and the one dimension table, and it still fails.
Basically, I'm out of ideas. Any help that anyone has is greatly appreciated.
View 5 Replies
View Related
Feb 22, 2006
Hi,
I am having the requirement where I have to use string as measures. Is this possible in Analysis services 2K.
Any help on this will be greatly appreciated
View 23 Replies
View Related
Apr 10, 2008
Hello:
How do I connect to an Analysis Services 2000 cube while in Integration Services? My idea is to execute an MDX query from within a package, and then stage the data to a SS 2005 table for a RS report to query.
Thanks in advance for your suggestions!
Tim
View 3 Replies
View Related
Nov 1, 2007
I have an olap database "A" and SSIS package "P" which process all the dimensions and cubes in "A" olap database.
I created "A1" olap database copy of "A" and made copy of "P" SSIS package as "P1"
I opened "P1" SSIS package and updated olap connection properties "Initial Catalog = A1". A1 is my new olap database.
When I run package "P1" guess what? it processed "A" olap database's cubes and dimensions. Try it, not in production because I did it in production.
View 12 Replies
View Related
Jul 23, 2005
Hi,This is probably a classic scenario with a shared dimension that weneed to use in different cubes, where all fact tables do not offer thesame level of detail. Dimension is snow-flaked.The cube that's causing me troubles was designed by marking the lowestdimension level Diabled and not Visible. This allows me to get rid ofone of the snow-flake tables (the one with the lowest level), thusallowing an INNER JOIN with the remaining table which has a level ofdetail corresponding to the fact table.When processing the cube, I get a 'member with key '[blah]' was foundin the fact table but was not found in the level '[blah]' of thedimension '[blah]'' that seems to indicate that none of my fact foreignkeys exist as primary keys in the dimension table. However if I thenattempt to query the cube, all data seems to be there.Would anybody be in a position (and willing ;-)) to share his/her ownexperience working around a similar issue?Thanks,SRL
View 2 Replies
View Related