File Move While DB In Recovery - Log Shipping
Apr 10, 2008
I have a warm standby (secondary server) receiving log shipping files.
The database has 5 files all in the primary filegroup. Two of the files need to be moved from one hard drive to another. Whats the best way / process to accomplish the move and re-establish the log shipping recovery status?
Thanks
View 3 Replies
ADVERTISEMENT
Aug 7, 2015
Log shipping was configured 6 months back. A Transaction log file got corrupted today. How to resolve this?
View 20 Replies
View Related
May 13, 2007
Hi
I could not able to find Forums in regards to 'Log Shipping' thats why posting this question in here. Appriciate if someone can provide me answers depends on their experience.
Can we switch database recovery model when log shipping is turned on ?
We want to switch from Full Recovery to Bulk Logged Recovery to make sure Bulk Insert operations during the after hours load process will have some performance gain.
Is there any possibility of loosing data ?
Thanks
View 1 Replies
View Related
Jan 13, 2007
I am in a 2 Database shop (DB2 and SQL Server) in which one of ourlarger clients use Log Shipping.We have need to tune a table on the primary server and ADDED a simpleindex to a table.Will that index be replicated down to the secondary server via logshipping. Or do I need to stop log shipping and apply the index to thesecondary server?Thanks in advance for the help.Sincerely,Mike
View 1 Replies
View Related
Aug 21, 2003
hello everybody
I have custom log shipping .
it run every 15 min
DB1 located on Server1
DB1 backup logs to server 2
DB2 located on server 3(300 km away from server1 and server 2)
Db2 restore logs from server 2
If server1 and server2 become unavailable
1.
Would enough login to server3
and
run
RESTORE DATABASE Db2
WITH RECOVERY
to bring db from read only to production mode up last restored log?
Thank you
Alex
View 1 Replies
View Related
Apr 30, 2015
I'm allowed to do Log Shipping from x.contoso.com to y.contoso.com, however there is a requirement to have the same data made available to servers residing on z.contoso.com.
Connectivity between x.contoso.com and z.contoso.com is not permitted, so configuring log shipping with multiple targets is not possible.y.contoso.com and z.contoso.com can talk to each other, so what is the most efficient way to move data from y to z.
View 6 Replies
View Related
Sep 16, 2015
I have log shipping enabled on databases(primary and secondary) and works fine. I need to implement TDE on the database. I have experience on implementing TDE on databases which are not used for log-shipping.steps needed to setup TDE which are involved with log-shipping.
View 2 Replies
View Related
May 13, 2015
Lets say I have a single instance SQL Server on a 2 node cluster with node names Server X and Server Y. These are part of Domain A.
SQL Agent Account runs under service account - DomainASQLAct.
Now I have Server Z which is a standalone SQL Instance on Domain B and there is no trust between domain A and B, not even one way trust.
Even though I dont have trust, I need to configure log shipping for the SQL Instance which is clustered under Domain A to a standalone box in Domain B.
Microsoft recommends Local Account(SQL Agent) to be used for Cross Domain Log Shipping. Also when there is no trust, MSFT recommends to use the same login name and password, however as my setup includes a cluster and cluster cannot have local account I'm not sure what will be the best strategy to follow here.
View 8 Replies
View Related
Sep 20, 2007
I am trying to imitate a DR situation where the primary db is down and I need to recover the secondary db on another server. They are a log shipping pair and so to imitate a DR, I remove the log shipping in the primary server maintenance plan. Then I go to the secondary server and disable the log shipping jobs there and attempt to do the following
RESTORE DATABASE database_name WITH RECOVERY
but I can't get exclusive use because the database is in use. But I don't see any other users... am I wrong in thinking that the log shipping was completely deleted? Anything I can do to force exclusive access?
View 10 Replies
View Related
Jun 9, 2015
I have two databases on a Production Server that I want to Log Ship to a Test Server. According to the sys.master files the physical File Location is on an E drive. Early attempts at Log Shipping these two files error'd out due to space issues on the E drive (one Log Shipped and then one err'd out). I was subsequently informed from the server group that they would prefer that I Log Ship these two database files over to the M Drive where more space is available. In fact, they modified the Server Properties / Database Settings / Database Default Locations (for Data and Log) to the larger M drive (I'm not really sure why they just don't increase the E drive space but there is proabably a good reason).
Okay, so now my problems have been solved. Easy enough. Now I deleted the successful Log Shipped database and started from scratch. However, as before, one db restored and one failed (due to space issues). Apparently, both db are pointing towards the E drive. How is that possible?Â
So here I am with one successful database and the normal sys databases pointing to the E drive. What is the best way of approaching this  move to the larger and preferred M drive?
View 6 Replies
View Related
Nov 13, 2015
Is It Possible to Configure Log Shipping On a CDC Enabled Database?
View 4 Replies
View Related
May 4, 2015
i have Two SQL 2012EE Node , it is installed in VCE Vblook 100 , now i want to move it to another hardware my question is " How i can i achive this task by move Windows 2012 R2 Cluster and SQL 2012 EE Cluster to another hardware".
View 4 Replies
View Related
Oct 12, 2015
I've got log shipping set up, and everything seems to be working fine, but the log files are not being deleted from the primary server despite configuring log shipping to retain them for 3 days. Â I see no errors concerning the log shipping, but did not configure a monitor. What process is responsible for deleting the older log backups, and how can I look for errors. Â I could simply set up a jog to delete the older files, but that will only mask the issue.
View 3 Replies
View Related
May 11, 2015
Setup log shipping from an Australian SQL2008R2 server to a UK SQL2012 server. With the time involved to copy the large backup file across a WAN link, we end up with around 2 days of log backups since the full backup.
- The Full Backup is restored to the UK Server to create a new database in norecovery mode.Â
- The first log backup file is manually copied to the UK server and restored.Â
- Start the Log Ship copy SQL Agent job - starts copying files prior the full backup on the Australian server. Copies 1 Log backup file and then fails.Â
- Manually copy the next Log backup file to the UL server.
- Start the Log Ship Restore SQL Agent job and runs successfully and restores the Log file.Â
- Start the Log Ship copy SQL Agent job - AGAIN it starts trying to copy files prior to the Full Backup.  IS this correct behaviour? I thought it should only copy Log files since the full backup.Â
View 3 Replies
View Related
May 1, 2015
SQL Server 2012: Out of all the databases in the instance we have a requirement in which we need to maintain a high availability for the databases around (128). Our team believed log shipping will apt for this requirement but not sure on it's limitations, how many databases are allowed or supports this log shipping from a single instance.
View 7 Replies
View Related
Sep 25, 2015
I want to redirect the logshipping primary backup folder to another drive, how to change the configurations steps to move the primary logship folder to another location within the same server!
View 2 Replies
View Related
Jul 16, 2015
Out of using stored procedure, reports and all this staff, I want to know the possible way to make sure that the data inside my Secondary Server Read only database are same as data in my primary server database.
So what is the simple way to do this check?
View 4 Replies
View Related
May 5, 2015
We tried to configure log shipping using script generated by GUI and when executed specific script which is meant for secondary server the database is not created and threw below error.
Msg 15010, Level 16, State 1, Procedure sp_add_log_shipping_secondary_database, Line 50
The database 'BUBALLO' does not exist. Supply a valid database name. To see available databases, use sys.databases.Â
Note:Â Only Copy, restore and alerts jobs have been created.
The account I'm trying to configure log shipping is the service account by which SQL and agent services are running and folder in where data and log files are intended and to be created is open to all (everybody has read/write permissioins) believe the issue is not with permissions.
View 4 Replies
View Related
Mar 24, 2012
I recently enabled log shipping on our production database, and I had initially accepted the default of 72 hours to delete copied logs. Well, i am running out of space quick, and I need to edit it to something like 6 hours.
When I try to disable log shipping in order to recreate it, or if I try to edit the secondary server settings when I am logged in as SA, or my windows account which has the sysadmin role assigned, I get an error that says:
Only members of the sysadmin fixed server role can perform this operation. Error 21089.
I've restarted the sql service, disabled and enabled the permission on my account, but for the life of me, i cannot get this to work!
View 10 Replies
View Related
Sep 17, 2015
I need to move files for a lot of databases that are all part of an AG. I've used the method at the bottom of this link with success on a small test DB.
View 2 Replies
View Related
Apr 25, 2008
We have the following scenario,
We have our Production server having database on which Few DTS packages execute every night. Most of them have Bulk Insert stored procedures running.
SO we have to set Recovery Model of the database to simple for that period of time, otherwise it will blow up our logs.
Is there any way we can set up log shipping between our production and standby server, but pause it for some time, set recovery model of primary db to simple, execute DTS Bulk Insert Jobs, Bring it Back to Full recovery Model AND finally bring back Log SHipping.
It it possible, if yes how can we achieve this.
If not what could be another DR solution in this scenario.
Thanks Much
Tejinder
View 6 Replies
View Related
Oct 9, 2006
I am having an issue with the File System Task.
I was wondering if there is a way to 'Move File' with the File System Task inside of a For Each Loop container but to dynamically set the Destination path variable.
Currently, this is what I have:
FileDestinationPath variable - set to C:TestFiles
FileSourcePath variable - set to C:TestFiles
FileNameAndLocation variable - set to blank
For Each Loop Container €“ Iterates through a folder C:TestFiles that has .txt files in it with dates in the file name. Ex: Test_09142006.txt. Sets the file path (fully qualified) to the Variable Mapping FileNameAndLocation.
Script Task (within For Each Loop, first step) €“ Sets the FileDestinationPath to the correct dated folder within C:TestFiles. For example, if the text files I want to move are for the 14th of September, it takes FileDestinationPath and appends the date folder to the end of it. The text files have a date in the file name (test_09142006.txt) and I am picking this apart (from FileNameAndLocation in the For Each Loop) to get the folder date. (dts.Variables(€œUser::FileDestinationPath€?).Value = dts.Variables(€œUser::FileDestinationPath€?).Value & €œ€? Month & €œ_€? & Day & €œ_€? & Year & €œ€?) which gives me €œC:TestFiles 9_14_2006€?.
File System Task (within For Each Loop, second step) €“ This is where the action is supposed to occur. I want it to take the FileDestinationPath and move the FileNameAndLocation file (from the For Loop) into this folder for each run.
Now as for my problem. I want this package to run everyday but it has to set the FileDestinationPath variable dynamically according to that day€™s date. Basically, how do I get this to work since I can€™t hard code the destination path variable from the start? I have the DestinationVariable on the File System Task set to the FileDestinationPath variable, after the script task builds it. However, using FileNameAndLocation as the SourceVariable on my File System Task tells me that the €œVariable €œFileNameAndLocation€? is used as a source or destination and is empty.€?
Let me know if I need to clarify further€¦...I may be missing something very simple. Any help would be greatly appreciated!
View 10 Replies
View Related
Jun 8, 2007
I am able to run SSIS packages as SQL Server Agent jobs with a Control Flow items "File system task", if I move a file (test.txt) from a drive (c on the server (where SQL Agent jobs run) to a subdirectory on the same drive. But, if I try to move a file on a network drive, the package fail.
What I can do to solve this issue.
Bye!
Daniel
View 1 Replies
View Related
May 27, 2015
I need to move specific files from a server to another server on a monthly basis. Â There are hundreds of files that are in the source directory and I need to move approximately 40 of those to the destination server. Â I would like to easily add or delete the file list as needed. Â I have seen where several variables were created for for each file name (and one for the path) and the ForEach Loop would go through them. Â With 40 or more I was thinking that I could make a connection to an Excel spreadsheet or text file with a record for each file name and read in and and move to the next record and make that value become the content of a "FileName" variable. Â Then if I wanted to add another file name I could just add another record to spreadsheet/text file or remove and the package would handle automatically....
View 10 Replies
View Related
Jul 12, 2006
Hello
I want to move and rename a file and embed the date/time into it, so that each time the package runs a new file is created. For example MyFile_20060712_150000.doc.
Can someone give me a hint how to do this with the File Systen Task SSIS Control Flow Item?
Thanks for an early reply
Regards
Chaepp
View 12 Replies
View Related
May 19, 2006
Hi All,
I am having a problem using the file system task, what I am trying to achieve is to move a file after it has been processed . I am using a For each loop container to process bunch of files but I want to remove the files that have been processed after every loop.To achieve this I added a File System Task after my data flow task and was using the same variable used in the for each loop container as my source variable but the package is not being validated and is gives the following error
"variable used as the source or the destination is empty"
Appreciate your help
Thanks
View 6 Replies
View Related
Apr 29, 2002
I have log shipping set up between 2 servers. It works fine for 4 db's but will not work for the 5th. I have removed and recreated the log shipping again for this DB. (THe DB is actually not being used in production yet) What happens is the complete setup goes fine and the process starts. I come back after a few hours and notice the job is failing. WHen I go to the monitor side it shows the copy and restore work fine. The problem is that it keeps doing the file named db_name_initial_file.trn over an over again. Even though new files are being copied over, they are never restored, it just gets stuck on this one. Anyone seen this before?
View 3 Replies
View Related
Oct 12, 2006
How do I move a tab serperated file into a table in SQL express using sql express? I need simple fast way to to this.
I can export all my access file into tab or comma files and then build the new tables and import them. I tried upsizing the table in access but sql express will not accept them at all and I cant find a way around it.
Thakns
View 1 Replies
View Related
May 31, 2015
Am just on the lookout to find out whether there is a way to put a prefix at the beginning of the transaction log backup file that is created by SQL Server logshipping.
So, instead of having <DatabaseName>_<DateTime>.BAK (which is what SQL does), I would like to have TL_<DatabaseName>_<DateTime>.BAK.
I have looked into a parameter for the sqllogship.exe command, but cannot find any & have looked at fields in the logshipping tables, & can't see anything there either.
View 0 Replies
View Related
Apr 19, 2007
I've been searching and reading for best practices on how to maintain a reasonable log file size while engaging in Log Shipping. I have found plenty of information on these subjects on their own, but not on how best to shrink your log size without breaking your log shipping integrity.
I apprecaite your help.
View 1 Replies
View Related
Apr 20, 1999
What's the easiest way to move a 7.0 log file to a new physical location?
View 2 Replies
View Related
Feb 26, 2008
Hi all,
I'm trying to move the files with flat system task. Before I move the files I like to created the new directory, and each directory can hold only 10000 files. Are there any examples or anyone can point me to the right direction?
thanks....
View 6 Replies
View Related