How To Copy All Jobs Between Sql Servers

Nov 14, 2000

hi, I do have over 30 scheduled jobs in one sql server in which I want to have the same jobs in another sql server. What is the best way to copy those jobs?

I thought of backing up the msdb from one sql server then restoring msdb into another sql server..... someone advice me NOT to do so due to potential compatibility problems that he did not explicitly state.

I am hoping to get the answer here.

Thanks

Ahmed

View 5 Replies


ADVERTISEMENT

How-To Copy SQL Agent Jobs Between Servers

Oct 20, 2005

I need to move SQL Agent scheduled jobs from one server to another..

Here are the details:

Source Server
SQL 2000 SP3 (upgraded from SQL 7)
Data stored in MsSQL7Data

target
SQL Server 2000 SP4
Data Stored in DATA

DTS Packages have already been resaved on Target Server, how can I copy the scheduled jobs over?

Thanks

View 2 Replies View Related

Help!!! Copying Jobs Between Servers

Dec 22, 1999

I have two servers running SQLserver 7.0. I have a number of jobs that are configured to import files from an AS/400 each day. I do not want to recreate these JOBS on the second server, for it took quite sometime to set up only one. I know that I can set up multi server jobs, but I want these jobs to run independant of the Master server. In other words I just want to move a copy of the job over to the next server.

View 1 Replies View Related

All Maintenance Jobs On New Servers Failing

Sep 2, 2002

Hi all,

I've just set up 2 new SQL 7.0 servers, and my new maintenance jobs - backups, optimisations, consistency check jobs etc - are all mysteriously failing. I've created them both with the Maintenance Wizard, and again by hand. I've attempted manual and scheduled runs. All to no avail. Nor do they populate the sysmainthistory table, although they're configured to do so. The mystery is that we have successfully installed some user DTS processes, and THEIR jobs work. In order to resolve the problem, I've:

(1) ensured the Agent service is running;

(2) ensured adequate space on the drive etc;

(3) verified that sqlmaint.exe exists in Mssqlinn;

(4) unchecked the 'attempt to repair minor errors' box (I read this was a known cause of the problem);

I've got some clues to go on, but nothing conclusive;

'sqlmaint.exe failed. [SQLSTATE 42000] (Error 22029). The step failed.'

Executed as user: NT AUTHORITYSYSTEM. sqlmaint.exe
failed. [SQLSTATE 42000] (Error 22029). The step
failed.

Additionally, both servers hold databases that I imported from another server-INCLUDING the msdb, and BOTH have the same problems and same error messages. This cannot be a coincidence.


Anyone have any ideas?


Thanks in advance,


JB.

View 1 Replies View Related

Easiest Way To Recreate Jobs Between Servers

Aug 27, 1999

Hi!

What is the easiest way to recreate jobs running on one server on another server?

Thank you

Praveena

View 2 Replies View Related

Monitoring Jobs Across Servers/versions

Jan 30, 2008

Hi all,
I've been digging around the last few days, looking for the best way to monitor all the jobs on all my prod servers. Using EM or SSMS is BS. I've been thinking that perhaps the best strategy is to write or modify a script that gathers information from sysjobs and sysjobhistory on all servers and then inserts it into my main DBA database on my "admin" server. Of course this script would have to be on all servers and be in a scheduled job itself. I'm thinking that I should probably categorize every job in the company and break out my reports that way too. I'll probably throw all the data into a cube so I can do some at a glance checks to see that everything is running ok. I'd like to trend run times with the data too.

Anyway as with most fun projects there are many different way to accomplish this. I've hit on one above and I've seen several others. What are some of the solutions you guys have come up with, what have you tried that didn't work so well and what are some pitfalls that I should avoid in setting this up?

Cat

View 3 Replies View Related

How Do I Copy Jobs From One Machine To Another?

Jul 3, 2007

I am moving my test database from Box A to Box B (to free up resources on my production environment). I need to generate the jobs/schedules for the database and get them over to Box B. The first problem I'm aware of is the sysdatabases table doesn't reference the DB's as the same number...so I think that will present a little difficulty.

I'm pretty knowledgable on SQL server, jobs, etc...but only marginally in the know on system tables. So, I'm not sure if I should be writing queries or generating SQL scripts for the jobs etc.

I'd love to see the starting point for a script so that I can learn this part of SQL Server. NOTE: I'm on SQL 2000 still.

Thanks,

alex8675

View 2 Replies View Related

Copy Jobs From One Server To Another

Jun 27, 2007

How do you copy all jobs from one server to another? Is there a way to do this programatically?

View 3 Replies View Related

DB Engine :: Agent Jobs Status For Multiple Servers Using Powershell?

Oct 14, 2014

I am following website link:

[URL]

I require to gather status details about all the SQL Agent jobs in the environment on multiple SQL Servers.

I tried to edit the script using:

[void][System.Reflection.Assembly]::LoadWithPartialName("Microsoft.SqlServer.SMO")
$sqlServerName = 'localhostdeveloper'
 $sqlServer = New-Object Microsoft.SqlServer.Management.Smo.Server($sqlServerName)
 foreach($job in $sqlServer.JobServer.Jobs)
{
$job | select Name, OwnerLoginName, IsEnabled, LastRunDate, LastRunOutcome, DateCReated, DateLastModified
}

but SQL Agent jobs are not reflecting in the mail output...

View 11 Replies View Related

Copy Table Different SQL Servers

Sep 9, 2005

Hi, How can you copy a table from one server to another server using SELECT statement?

View 1 Replies View Related

Copy Database Between Servers

Dec 9, 2007

Hi,

I've got two servers with sql 2005 express on, the first is a shared server at our isp, we rent one database from them. The other server is our own and we have full sa access.

Is there an easy way to copy the database from the shared server onto our own server. We're unable to use the backup.

Thanks

View 3 Replies View Related

How To Copy Reports To Different Servers

Jun 26, 2007

Hi,



Once a report is deployed to a specific server (server A), is there a way to "copy" it to a different server (servers B, C), without having to actually deploy it server by server?



In my case, I am trying to have the developers deploy the reports on the development server first (server A), and then manually or automatically copy them to a Preview server (server B), and later to a production server (server C). I cannot grant the developers full permissions on the production server, so a "copy" is what I'm thinking about....



Thanks in advance for any ideas.



Edwin.

View 4 Replies View Related

How To Copy One Table From One Database To Another On Different Servers?

Jul 31, 2007

 Hello. I need to copy all of the rows in a table from a database on one server, to another existing table of the same name in a different database on a different server.  I'm trying to use a SELECT INTO statement.  Any idea how to do this?I've tried SELECT          *   INTO                  DestinationServer.dbo.DestinationDB.DestinationTableFROM               SourceTable AS SourceTable_1 But this doesn't work, saying there are too many prefixes. Any idea how to do this? 

View 5 Replies View Related

Using Agent To Copy Files Between Servers

Aug 10, 1999

I connect to remote servers using PPTP connection. There are 4 web servers and 1 production server on the other side of the firewall. From my staging server, I am supposed to archive the NT event logs(Application and system) for each of the servers.

To solve this problem, I have mapped the C drives of each of the remote servers to my local staging server. I then created a batch file, webevnt.bat containing code,

G:
Cd winnt
Cd system32
Cd config
Copy sysevent.evt c:eventarcweb01sysevent.evt
Copy appevent.evt c:eventarcweb01appevent.evt

Then I used SQL Agent to create a job of type, Operating system command(cmdexec) and typed the following command :

C:atch_~1eventl~1webevnt.bat

When I run the command, C:atch_~1eventl~1webevnt.bat through the command prompt, the files are copied with the correct modified date.
The output is,
1 file(s) copied
1 file(s) copied
But, when I use SQL Agent and start the job containing the same command, the job runs successfully but, the files have a wrong modified date. Moreover, when I view the job history for this job, it says, specified drive not found. 1 file(s) copied. 1 file(s) copied.

Please let me know why this happens.

Thank you.

Praveena

View 1 Replies View Related

How To Copy A Backup File Between Two Servers?

Sep 14, 2004

Hi,

I am creating a job that runs this command:

EXEC xp_cmdshell 'copy f:dados_sqlmssqlackup
ecom_tb_basico.bak \stalingrado_2c$ emp',

The result of this job is:

"Access is denied.
0 file(s) copied.
NULL"

But I am running this command with sa user.....
Wich kind of permission is missing to execute this copy?
When I execute the same command to copy the backup from the server to itself, it works fine!!!!
Does someone have an idea to solve this problem?????

View 3 Replies View Related

How To Copy An OLAP Database Between Servers?

Feb 10, 2008



I have a SSIS package which is used to update the OLAP database daily. It includes various processes from the initial dropping of the raw data source tables, rebuilding it, dropping of the OLAP datamart tables (dimension tables and fact tables), re-building it, updating the OLAP dimensions and finally updating the OLAP cubes. I wrote a series of the Sql scripts to perform the tasks except the updating of the OLAP dimensions and cubes, and assigned them to the SSIS package. Everything is working great and it was scheduled with the sql agent to execute at the early hour everyday. We have a single server enviroment for the "Production/Processing" i.e. Database engine, SSIS, SSAS, SSRS are all installed on a single server. By the way we are using Sql 2005.

Recently we split the "Production/Processing" enviroment into two seperated servers. We purchase another server "Production" server and use the existing server as the "Processing" server. I want to copy the success updated OLAP database from the current server "Processing" server to the new "Production" server. How to copy an OLAP database between servers?

Idealy, I believe that the following 5 processes should be assigned after the completion of the OLAP cubes updated at the "Processing" server:


Stop the SSAS at the "Production" server.........I know how to do this in SSIS

Re-name the existing OLAP database at the "Production" server.......not sure how to do this

Copy the newly updated OLAP database from "Processing" server to the "Production" server. If the copy process is succeed, drop the OLAP database that has just been re-named at the "Production" server. If the copy process is failed, re-named the OLAP database that has just been re-named back to the original name.....not sure how to do this. Should it be a Sql script?

Start the SSAS at the "Production" server........I know how to do this in SSIS
Thanks

View 1 Replies View Related

Copy Data And Objects Between SQL Servers

Mar 23, 2006

I have recently moved from a Microsoft SQL Server 2000 to a SQL Server
2005.


In the good old Enterprise Manager, when I imported a table from a SQL
server to another, I could choose "Copy objects and data between SQL
Server
databases". When choosen, all primary keys, and default values was
copied.


My question is:
Is it possible to do the same in Microsoft SQL Server Management Studio
with
SQL Server 2005? And how do I do it?


I have tried using the "SELECT * INTO NewTable FROM OldTable"
statement, but
it just drops all information about primary keys and default values.


Best Regards

View 1 Replies View Related

Use SSIS To Copy Files Between Servers?

Apr 27, 2006

This is a question of whether or not to use SSIS to solve a problem.

I need to copy SQL Server database backup files from a server in the DMZ to a fileserver inside the firewall. The SQL Server is not allowed to write it's backup files directly to the fileserver, so they are written to local disk. A connection can be made from inside the firewall to the SQL Server to copy the files off.

So, I'm considering SSIS for the job. Is it possible to use SSIS to perform the file copies from one remote server to another? If so, is the FTP task required, or can File System tasks be used?

An alternative would be Windows scripting, xcopy, robocopy, etc. but I like the features of SSIS and would like to take advantage of it's flow control, error handling, database scheduling, etc.

Any tips, sample code, etc. would be appreciated.

Thanks,

david

View 4 Replies View Related

Copy Objects And Data Between SQL Servers

Feb 21, 2008

I want to migrate from one machine to another is it wise to use SSIS "Copy Objects and Data Between SQL Servers" task to accomplish this....migration both data and metadata (in master,model,and msdb ) databases?

View 1 Replies View Related

Move / Copy Linked Servers From One Server To Another

May 27, 2015

I have migrated databases and logins from SQL server 2008 R2->SQL Server 2014. Now I also want to migrate/copy the "linked servers". Do you have a step-by-step for this, so that i will copy everything that is necessary regarding logins etc ? 

View 2 Replies View Related

Fastest Way To Copy Tables And Their Indexes Between Servers?

Nov 13, 2006

The DTS Task Copy Server Objects is PAINFULLY slow.

The Copy Table Wizard is fast but generates an unmanagable DTS and does not bring over the indexes.

Any tips or tricks to copy tables, data and indexes and a reasonable speed?

Thanks,

Carl

View 1 Replies View Related

Copy Tables Between Servers Using SQL Server 2005 Enterprise Edition

Jul 26, 2006

Hi, I am trying to use SQL Server 2005 Enterprise Edition to copy tables from my local server to my hosts server at brinkster.com. In the old version you could use DTS, but everything seems to have got far more complicated now! Please can anybody guide me in the right direction? Thanks a lot.
 

View 2 Replies View Related

Sql Report Works Fine On Internal Servers - Hosed On External Servers - Need Some Help

Nov 21, 2007

I have a report that was designed using SQL Reporting Services that sits on a SQL reporting server. It's nothing too exciting, it is essentially a three page application with legal jumbo on pages 2 and 3 and applicant data in fields on page 1.

We use rectangles to force page breaks to page 2 and to page 3.

When running the report on the report server, it shows and prints fine.

When running the report from the QA website internally, it shows and prints just fine.

When running the report from the production website from a machine internally, it shows and prints just fine.

When running the report from outside of the company network, the report is jacked. It obliterates large chunks of text, crams text together, and creates blank pages.

I need help in determining where I even begin with trouble shooting this!

View 1 Replies View Related

Development Servers, Auto-update Live Servers

Aug 21, 2001

can anyone tell me if they know of a way to automate the update process from development servers to live server, with little interference from an administrator

I have a development team that are constantly updating their databases along with their ASP code, and want to publish changes an a weekly basis. They have asked me for a way to take their new structures, tables, procedures etc, and copy them to the live servers, but NOT to interfere with existing customer data.

Funny I know – and I hate the idea btw :(

Any references, contacts, 3rd party tool recommendations welcome,

Thanx,

Darren

View 1 Replies View Related

Linking SQL 2005 Servers To SQL 2000 Servers Problems

Sep 27, 2007

I am in the middle of a major migraton project, moving from x86 SQL 2000 to IA64 SQL 2005. I have a business need to link to several legacy servers. I have a number of problems I am trying to solve.

1) Linking a Kerberos server to a non-Kerberos server.
2) Linking x64 or IA64 servers to x86 servers.
3) Linking SQL 2005 to SQL 2000.

Two of the errors I am encountering are:
------------------------------
TCP Provider: An existing connection was forcibly closed by the remote host.
Login failed for user '(null)'. Reason: Not associated with a trusted SQL Server connection.
OLE DB provider "SQLNCLI" for linked server "SCDC250DB" returned message "Communication link failure".
(Microsoft SQL Server, Error: 10054)
------------------------------
And
------------------------------
The OLE DB provider "SQLNCLI" for the linked server "SCDC250DB" reported an error. Authentication failed.
Cannot initialize the data source object of OLE DB provider "SQLNCLI" for linked server "SCDC250DB".
OLE DB provider "SQLCLI" for linked server "SCDC250DB" returned message "Invalid authorization specification".
(Microsoft SQL Server, Error: 7399)

If someone has worked through these problems before, I would appreciate it if you could direct me to the relevant documentation to resolve these issues.

Thanks!


Brandon Forest

Database Administrator

Data & Web Services Team

Sutter Connect Information Technologyforesb@sutterhealth.org

View 2 Replies View Related

The Remote Copy Of Database X Has Not Been Rolled Forward To A Point In Time That Is Encompassed In The Local Copy

May 11, 2006

Hi,

I set up DB mirror between a primary (SQL1) and a mirror (SQL2); no witness. I have a problem when I issue command:


alter database DBmirrorTest
Set Partner = N'TCP://SQL2.mycom.com:5022';
go


The error message is:

The remote copy of database "DBmirrorTest" has not been rolled forward to a point in time that is encompassed in the local copy of the database log.

I have the steps below prior to the command. (Note that both servers' service accounts use the same domain account. The domain account I login to do db mirror setup is a member of the local admin group.)

1. backup database DBmirrorTest on SQL1

2. backup database log

3. copy db and log backup files to SQL2

4. restore db with norecovery

5. restore log with norecovery

6. create endpoints on both SQL1 and SQL2

CREATE ENDPOINT [Mirroring]

STATE=STARTED

AS TCP (LISTENER_PORT = 5022, LISTENER_IP = ALL)

FOR DATA_MIRRORING (ROLE = PARTNER)

7. enable mirror on mirror server SQL2

:connect SQL2

alter database DBmirrorTest

Set Partner = N'TCP://SQL1.mycom.com:5022';

go

8. Enable mirror on primary server SQL1

:connect SQL1

alter database DBmirrorTest

Set Partner = N'TCP://SQL2.mycom.com:5022';

go

This is where I got the error.

The remote copy of database "DBmirrorTest" has not been rolled forward to a point in time that is encompassed in the local copy



Thanks for any help,

KT

View 8 Replies View Related

Detach-copy-attach: Can Not Copy Files - Getting Access Denied

Feb 28, 2008



Hi!
I did:
alter database mydb set single_user with rollback immediate;
exec sp_detach_db @dbname='mydb', @keepfulltextindexfile='true';

then I tried to copy files to new location on other drives, same server but got
>>Cannot copy <myfile>: Access is denied
Make sure the disk is not full or write-protected and that the file is not currently in use<<

I also tried rename of file without success.
I also tried with db service stoppet (not preferred) without success.

How to find out, which process locks the files?
Best regards

View 7 Replies View Related

Copy? Export? How To Copy Stored Procedures

Aug 30, 2005

How do I transfer/copy the stored procedures in my Test DB to my LIVE DB?  IT won't allow me to export keeps giving me an error. 

View 4 Replies View Related

Copy A Database With Copy The .mdf File And Attaching It With A New Name?

Nov 4, 2006

Hello,

if i have a given database (a model) and i want to copy this database in the same database instance. Is it ok to copy the mdf and ldf file and attach the files with a new database name in the same instance.

Or is the datebase name part of the .mdf file?

Regards
Markus





View 6 Replies View Related

Use Copy Wizard To Copy Databases

Jan 23, 2012

I am attempting to use the copy wizard to copy databases from SQL Server 2005 to SQL Server 2008 R2 w/ FP1.

The copy fails with a login failure to SQL Server 2005. I have a user id & password under Windows for both servers. I have a user id and password under SQL security with the called for admin security rights.

The 2005 server has two instances, 20 databases, two dozen maintenance plans, and over a hundred users. I really would like to use the utility so I don't have to recreate everything manually.

View 1 Replies View Related

Questions About Bulk Copy Insert Using 'Memory Based Bulk Copy Operations'

Feb 1, 2007

Hi~,

Before implementing memory based bulk copy insert with IRowsetFastLoad interface of SQL Server 2005 OLE DB provider, I want to know some considerations.

- performance : compared with T-SQL's "BULK INSERT ..." and bcp utility

- SQL Server's resource usage : when running memory based bulk copy, server resource's influence

- server side action(behavior) : when server is busy, delayed-update means IRowsetFastLoad::Commit(true) method can insert right after?

- row-count : The rowcount limitation can be inserted by IRowsetFastLoad::InsertRow() method before IRowsetFastLoad::Commit

- any other guide lines

View 1 Replies View Related

Questions About Memory Based Bulk Copy Operation(InsertRow Count,array Insert Directly,set Memory Based Bulk Copy Option)

Feb 15, 2007

Hi~, I have 3 questions about memory based bulk copy.

1. What is the limitation count of IRowsetFastLoad::InsertRow() method before IRowsetFastLoad::Commit(true)?
For example, how much insert row at below sample?(the max value of nCount)
for(i=0 ; i<nCount ; i++)
{
pIFastLoad->InsertRow(hAccessor, (void*)(&BulkData));
}

2. In above code sample, isn't there method of inserting prepared array at once directly(BulkData array, not for loop)

3. In OLE DB memory based bulk copy, what is the equivalent of below's T-SQL bulk copy option ?
BULK INSERT database_name.schema_name.table_name FROM 'data_file' WITH (ROWS_PER_BATCH = rows_per_batch, TABLOCK);

-------------------------------------------------------
My solution is like this. Is it correct?

// CoCreateInstance(...);
// Data source
// Create session

m_TableID.uName.pwszName = m_wszTableName;
m_TableID.eKind = DBKIND_NAME;

DBPROP rgProps[1];
DBPROPSET PropSet[1];

rgProps[0].dwOptions = DBPROPOPTIONS_REQUIRED;
rgProps[0].colid = DB_NULLID;
rgProps[0].vValue.vt = VT_BSTR;
rgProps[0].dwPropertyID = SSPROP_FASTLOADOPTIONS;
rgProps[0].vValue.bstrVal = L"ROWS_PER_BATCH = 10000,TABLOCK";

PropSet[0].rgProperties = rgProps;
PropSet[0].cProperties = 1;
PropSet[0].guidPropertySet = DBPROPSET_SQLSERVERROWSET;

if(m_pIOpenRowset)
{
if(FAILED(m_pIOpenRowset->OpenRowset(NULL,&m_TableID,NULL,IID_IRowsetFastLoad,1,PropSet,(LPUNKNOWN*)&m_pIRowsetFastLoad)))
{
return FALSE;
}
}
else
{
return FALSE;
}

View 6 Replies View Related

Sql Jobs

Aug 2, 2005

Hi,It may sound funny but it is true. I have 2 version of same procedure, 1 is named as "update_aggre" other named as "update_aggre_2" .if I run these procedures using sql jobs the 1st procedure takes 12 seconds and the 2nd takes 2 second. I am stil surprise why is that both of them have same code.Any ideas please?and also I need to have lock mechanism within a procedure so that if some one is calling a procedure which is already called by some one ans is stil working on it the second user shld not be able to overwrite the existing data untill the first one is finished.TIAAmit

View 3 Replies View Related