Jul 9, 1999Hello there,
Is there any way to schedule SQL Databases restore (maybe from a command script) on Windows NT4,
SQL server 6.5 sce pack 5a ?
Thanks!
Regards,
Rachel
Hello there,
Is there any way to schedule SQL Databases restore (maybe from a command script) on Windows NT4,
SQL server 6.5 sce pack 5a ?
Thanks!
Regards,
Rachel
Hi,
I am trying to schedule a daily task to restore the latest backup from a BackupDevice that contains multiple backups. The command to restore is "Load DBName from BackupDevice". Does anyone know how to restore the most current backup from the Backup device?
Thank you for your help.
Hi,Did anyone successfully set up a local package to first ftp a db.bakand second perform an automated db restore?I need to perform an automated task, which ftp nightly backup file toanother server and then restore onto a database and leave the databasein read-only mode for additional transaction logs restore during theday.Can someone help and provide the procedures on how to do that?Thanks in advance.
View 1 Replies View RelatedHi i have an web app demo that allows users to add info and change attributes within a SQL 2005 Express DB. I'd like to restore a clean copy of this database every couple of hours from a .bak file using a Windows scheduled task on the server. Has anyone got a .sql script for database restoration that i could use and call using a .cmd script file? Thanks.
View 2 Replies View RelatedWhile migrating Report services in SQL Server 2005 to 2014, I am trying to restore the Encryption Key in RS Configuration Manager in2014. But I cannot click the 'Restore' button in RS Configuration Manager. So if I should be grant more right to do so or any other action?
View 2 Replies View RelatedIn Windows Server 2012. How do I do a System Restore to a previous restore point?I need to install the 64 bit and 32 bit Oracle Client Install for connections in SSIS and to create Oracle Linked Servers.
If you make a mistake it is not fun removing it. Sometimes it corrupts the machine and it is difficult to uninstall since there is not an Oracle Universal installer for Oracle 11g.If you install the 32 bit before the 64 you mess up the machine.how to create a restore point.
I am looking for a SQL Backup/Restore tools which can restore multiple environments. Here is high level requirements.
1. We have 4 DBs, range from 1 TB - 1.5 TB Each Database. When we restore to QA, DEV, or Staging, we usually restore 4 of them.
2. I am looking for the speed to complete restoring between 1 - 2 hours for 4 DBs.
I am evaluating the Dephix Software but the setup is very complex and its given us a lot of issues with Windows Authentions, and failure in the middle of the backup. I used Guess Software many years ago but can't find it on the web site any more. Speed is very important for us mean complete restoring as fast as possible. We are on SQL 2012 and SQL 2008 R2.We are currently using NETAPP Technology and I have Redgate Backup Tool but I am mainly looking for fast Restore Process.
Hello,
Would some one please help me with the syntex on how to run "restore filelistonly" or restore verifyonly" on a SQL backup which has multiple filesets?? My backups locations are as follow:
RESTORE VERIFYONLY
From disk = 'E:syndicated_databank__bkup_01.bak',
'E:syndicated_databank__bkup_02.bak',
€˜E:syndicated_databank__bkup_03.bak€™,
€˜E:syndicated_databank__bkup_04.bak€™, €˜E:syndicated_databank__bkup_05.bak€™
I tried to do a restore with the above, I got error The label 'E' has already been declared. Label names must be unique within a query batch or stored procedure.
Please advise!!
I have seen this before. A 2000 restore fails, leaving the database thinking it is being restored but the restore job failed and errors when it is restarted. EM is clueless. I believe there is a proc to reset some flag. Can you share it with me???
Thanks!
http://msdn2.microsoft.com/en-us/library/aa177009(SQL.80).aspx
i need to schedule asp code execution using SQL Stored Procedure ...im not allowed to connect using Enterprise Manager is it possible in ASP and in case how?
Hi all,
I want to make a job schedular in SQLServer 2005. That is i want to send email to users daily at 12:00 PM.
how can i schedule using SQLServer Agent in SQLServer 2005. And i want to filter the users from user table. Please help me
Thanks!
Hello,
I would like to schedule a job every 30 sec. The min time in job schedule is it allows 1 min. Is there a way I could run the job every 30 sec.
Thanks
Moin
How Do I schedule Sql server Jobs in interval of Seconds in place on minute/Hours? Is it possible in Sql Server?
Thanks..
Hi
I have lots of DTS Packages that I am running manually daily and I am trying to create schedule all of those and all of them are failing. Some of those are accross domians,but the owner on both domains have same userId and password.
Any Idea why this is failing would be really helpful
thanks in Advance
taapas
Hi
I would like to import data via DTS from one db to another to run every half hour.What would be the easier way to do this?Should I setup a job to run every half hour?
If anyone could help with some suggestions , it would be appreciated.
When I try to schedule a DTS package which is an EXE it doesn't run.
If I just run the DTS package it works fine.
I have checked the permissions of the DTS scheduled package and made sure
it had proper rights. SQL Server Services were started with the proper security rights.
When I schedule the DTS package, it is being done on the Server, and not a workstation.
Any ideas on why it will not run?...
Also, How do you schedule and EXE under SQL Server Agent Jobs.
Even when I schedule an EXE that is not a DTS package it doesn't run...
Thanks,
Daniel
Can any one tell me how to schedule a job using sql query
View 2 Replies View Relatedis there a way to make a job schedule that running store procedure for msql express ?
i'd like to make a time counter that will update every minute.
thanks
I have almost completed a full project by myself which is soooo exciting. The last thing I need to do is schedule a job to run the query on a specific day and time. So how do I do this? It asks me for a command and I am not sure what I am supposed to enter in here.
The Yak Village Idiot
How could I get an sp to run every morning at 1.00am. It would delete empty entries from a sql database.
Thx
Im trying to schedule a DTS package that I have created. When I right click on the package in Enterprise Manager and click on "Schedule" I get the options to set up the job to run on a schedule.
I fill out the time and click "OK". But when I immediately right click on the package again, all my settings are gone, and the defaults are back in place.
How do I know if the package will run- or if it did run?
I would actually prefer to run the job from a command line using a Scheduled Task... What would the syntax be? My DTS Local Package is named "IMPORT_DAILY_UPDATE"
Thanks
on ss2k5, how do you find out if sql job schedule is enable using QA?
http://www.sqlserverstudy.com
How is it possible to schedule a SSIS package to run at a certain time please?
View 13 Replies View RelatedHi all,
I create a new in SQL Server Agent. However, When I click start Job at step, the first step start immediately,not the schedule I set. So How can do I make it to run at the schedule time?
Thank you
I have MS SQL installed on my workstation at work. I am trying to use DTS to export data from our local network that uses a Pervasive DB to our web server that is hosted with another company.
If I go in and manually execute the DTS package from my workstation, it send the data to the web server.
If I try to schedule the DTS Package to automatically send the data, it fails. SQL Server Agent is running on my workstation and on the web server.
Is what I am trying to do possible? What am I doing wrong?
Kinda general question -but before I embark on my own design I thought I ask around. . .
What I want to design is database representation of a schedule of a roster. For instance a school roster. I hope I am not being too general here.
I want to create a job to run once a week in sql server agent jobs. Setting up the the job to run is no problem. I want the job to run a sql statement that will retrieve sql. I then want the records to be inserted in a txt file. What is the best way to accomplish this.
View 2 Replies View Relatedanyone ever encountered this....i have a package which will execute fine manually but when i try to schedule it, it fails immediately (within the first second).i can even right click on the scheduled package and do "generate sql script" and then run that script and again, no problem. it just will NOT schedule.any ideas?
View 3 Replies View RelatedHi All
I'm having problems scheduling a DTS package.
The server is SQL 7 sp2 running on NT4 sp5. The only other twist is that it's at a remote site that I connect to via NT Dial-up.
When I choose the 'Schedule Package...' menu option I get the normal dialog to set frequency etc... but the job isn't created.
Any guidence at all would be most appreciated.
Thanks
Phill
I create DTS package and when I want to schedule the package an error occures. The message says :
Microsoft SQL-DMO
Connection user failure (null)
Non associate to a secured SQL server link
Do you know what happened ?
Hello and thanks for reading my post...
I have a DTS package that I can execute manually all I want, no problem.
However, when I try to schedule the package to run as a job, it error when it tries to connect to my remote database, giving me comments about the ODBC driver (which is installed correctly).
My best guess is that when I run it manually, it running under my userid/password (NT authentication), but when it runs as a job, it is using the SQL Agent, which has a different level of authority somehow.
This may be a no-brainer, but I've looked at everything I know of.
Please help!
is it posible to change a file name usinging schedule task??
I used this syntax
Exec xp_cmdshell "REN
E:Elsie_DB_db_dump*.* E:Elsie_DB"
Is there another way of doing it??
Hi,
I have 2 jobs schedule to run after every alternate hour. Job A runs at 1 am, 3 am, 5 am etc. and job B runs at 2 am, 4 am , 6 am.
If job A is still running I would like Job B not to start at the scheduled time. How can I achieve this?
Thanks in Advance .... j