Improvements To Scheduling Of Reports...

Jan 12, 2007

The scheduler is difficult to use when debugging. There is not test-oriented "execute now" function or button, and there is no way to generate and email reports (these are data-driven) to a test user recipient (e.g., send every report to the developer, not to each individual recipient from the data source) without editing the To: field to a static value. Why not have a way to execute the report on demand, but with an option to substitute a static value in each of the to:, cc: and bcc: fields so it does not go to the query-based recipeints, without having to edit these fields and then edit them back?

Also, provide a way to see what parameters after @ can be used, such as @ReportName - what is the list of available param names? Can the fields resulting from the data-driven subscription query also be used?

View 1 Replies


ADVERTISEMENT

Scheduling Reports To Run

Apr 5, 2007

Is there a way to schedule reports to run on a specif day and time and save them to excel files?

View 3 Replies View Related

SQL 2012 :: Scheduling And Emailing Custom Reports?

Jun 19, 2014

I have downloaded MS's performance dashboard report and installed. I wanted these report should automatically send the performance report to my email.

View 1 Replies View Related

[scheduling] SSIS Package Fails, But Scheduler Reports Success

Apr 10, 2007

I have an SSIS Package that executes a stored procedure. It turns out my stored procedure was missing.

However, the SQL Job Scheduler reported that step as success.

Can anyone tell me why?

`Le

View 8 Replies View Related

Writing New App In SQL 2005 - Where Should I Look For Improvements

Jun 13, 2007

 I'm leading up the development project of a re-write of one of our current applications. The app. is getting released before SQL 2008 comes out (shucks) so I'm using SQl 2005. This will be our first app. at this company using SQL 2005.I don't have the time at home, or at work to spend a lot of time researching where I can get performance gains/increases with SQL 2005. I'm used to SQL 2000, and I'm not a Guru at SQL.Can anyone point me in some directions or certain technologies about SQL 2005 that make it shine higher than SQL 2000?Things we will be using in our applicationSession states stored in SQL Disk Caching/Memory Caching.Does SQL 2005 do better Cachine of Pages / Data that can be accessed quicker than Disk/Memory?SQL ReportsThe search and Reporting engine will be using the same engine - driven by SQL ReportsI also need to find a good way to implement record locking, so that data flow does not get interupted, but data updating works properly.Thanks.

View 1 Replies View Related

Any Improvements To This: Cannot Apply Value Null To Property Login: Value Cannot Be Null.

Mar 26, 2007

Looks like there was a fix and then I read this fix is not a fix. Does anyone know how this can be rectified? Does it mean that only Windows authentiation is the only way it works. The Software is over 2 years old, there are no excuses.

View 1 Replies View Related

Comparison Of SQL Server Reporting Services To Access Reports, Crystal Reports, Cognos Or Other Options

Nov 5, 2007

Hello SQL Server Experts, Data Analysts, and Report Writers et al:

re: Reporting Options with SQL Server

I wanted to propose an offshoot to the pryor thread:

Would anyone take a stab at comparing Access Reports, Crystal Reports,
Cognos or other options to all the Reporting Services and its components offered as part ofSQL Server, especially as to extracting data from SQL Server into a report format?

I guess this is a far as capabilites, ease of use, limitations, and especially formatting
or presentation of the end report product?

Thank you to all, and I hope this is a beneficial discussion to others.

Hal1490



Hal9000

View 4 Replies View Related

Reports Usage Frequency For All The Existing Reports On SSRS 2000

Mar 18, 2008

I have an already published application running several MS SQL Server 2000 Reporting Services report.
I need a way to find from either the reporting services log or the application server (IIS) logs or windows log
to know the frequency of each report being used.

Based on this info, the business needs to know which reports are being used and to what extend?
How can I acheive this?

I have already got the IIS logs and it did not give the required info.
I have looked into the Reporting Services logs but it does not provide the info either.

Any help is appreciated

View 2 Replies View Related

Reports Usage Frequency For All The Existing Reports On SSRS 2000

Mar 18, 2008

I have an already published application running several MS SQL Server 2000 Reporting Services report.
I need a way to find from either the reporting services log or the application server (IIS) logs or windows log
to know the frequency of each report being used.

Based on this info, the business needs to know which reports are being used and to what extend?
How can I acheive this?

I have already got the IIS logs and it did not give the required info.
I have looked into the Reporting Services logs but it does not provide the info either.

Any help is appreciated

View 1 Replies View Related

Remove All Reports ( Not Data Sources) From Reports Server

Jan 23, 2007

Hi does anyone know how to do the above with out going through reportserver url?

Preferably by using a cmd tool ? such rs.exe

or through the backend in the reportserver DB?

Thanks

Dave

View 2 Replies View Related

Migration Of SQL Reports 2000 To SQL Reports 2005

Feb 13, 2008

Hi Friends,

Could I migrate the reports which are developed on SQL 2000 to SQL 2005. If Yes then How ...

Could anyone explain me. How it works.


Thanks
sqlferns

View 2 Replies View Related

Converting Crystal Reports To SSRS Reports

Mar 27, 2008


My issue is with converting multi-value parameters:

In Crystal Reports, you can set a parameter to accept multiple vales (Discrete, Range or Discrete and Range).

As an example:

I have a database table with a column called ID.
I can create a parameter called param_id and set the options of the parameter to "Allow multiple range values".

With this setup, I can limit the result set of the report by comparing the param_id parameter to the ID column in the database. Because param_id is a multi-value range parameter, I can pass it the following data:
1 - 50
60 - 80
150 - 127

This will only return results within those ranges.


Does anyone know if SSRS provides this kind of functionality?

Thanks,

Patrick Conway

View 9 Replies View Related

Copy Reports From Other Users My Reports Folder

Aug 7, 2007

Is there a way to copy reports from other users "My reports" folder? I am logging onto the management studio reporting services using an administrative account and I am able to view the reports from all users' "My Reports" folder. But I am not able to export them as an rdl file. I am able to export reports from other common folders, but not from the "My Reports" folder.

The reason I need to do this is some of the users have created some reports in one environment and the reports are available in their respective "My Reports" folder. I need to move these reports to their corresponding "My Reports" folder in another environment.


Is there a way to do this?

Thanks for your help.

View 3 Replies View Related

How To Show ChartFX Reports In ReportServer And How To Show Tooltips For Reports Using Chart Properties

Dec 31, 2007



Hi all,

I have two problems.

1. I downloaded ChartFXRSTrial and created one chart, and able to deploy it in ReportServer, but the problem is the reports are not showing there, i checked the configuration of .dll files in the help provided by chartFX, but couldn't get anything, so could help me on this.

2. How to give Tooltip for the X- axis or Y- axis values in the ReportServer , i tried using chartproperties of .rdl file, but didnt understand it. can help me on this, and one more i tried with Dundas too, If im giving tooltip as #valy then, it is showing samething in reportserver instead the values of 'Y-axis'.

Thanks,
Mahesh Manthena

View 1 Replies View Related

Job Scheduling In Sql 7.0

May 30, 2002

I have set a job to run hourly between 8 am and 8 pm. I mark the schedule as enabled and mark the job as enabled. It will run for that day and then the enable check on the schedule clears out. I have several other jobs that run without this problem. Has anyone heard of this before and can this be effectively monitored?

thanks, mary

View 3 Replies View Related

Scheduling

Oct 16, 2001

Hi,
Can anybody give me the steps to schedule Database backup and restores in 7.0?
I can do the backup and restores of the database without scheduling. I dont know how to do with scheduling.

Thanks in advnace.

View 1 Replies View Related

Scheduling Of Job

Feb 15, 2001

I've created a task which monitors the server, I want it to run every 30 sec.
But the scheduler in job allows to run at the most only 1 min. Is it the way to make it 30 sec?

Thanks.

Qinglee

View 2 Replies View Related

Scheduling A DTS Job

Sep 13, 2000

Does anyone know how to schedule a DTS job to collect data from another database?

cheers!

View 1 Replies View Related

Job Scheduling

Sep 20, 2000

Can I use SQL Server Agent schedule to start my.exe?
I am not sure in command that I have to place in "Edit Job Steps" DialogBox.
It's not working just with path.

View 1 Replies View Related

DTS Scheduling

Aug 11, 1999

Hello all,
I am trying to schedule DTS package. Seems like I have two options
1. Save DTS package as a File and Run it using dtsrun function
2. Save DTS package on server and use scheduling wizard

If I use method #1 it works fine but you have ti create job, schedule it
and yada, yada, yada.....
Method #2 seems mach more simple but then I use it it does nothind.

Am I missing something?

Thank you an advance.

Boris

View 1 Replies View Related

DTS Scheduling

Jul 22, 1999

I'm having a little trouble getting a DTS package to run as a scheduled event. I have created the same one(an export to Access db on the same computer) as a local package and a repository package. Both will run normally when I start them manually from the DTS screen, but they will not run from the scheduler. It seems like this might be some kind of permissions problem, but it could easily be something else, since I've never used DTS before.

Thanks

View 1 Replies View Related

DTS Scheduling

Feb 21, 2001

I created a DTS to transfer two tables from one server to another and set up a schedule to run once everyday. I could not get it to run. I got this warning message from evetlog:
SQL Server Scheduled Job 'Forum' (0x0E0AA96BB9A1654C94AA12CC8B854BC8) - Status: Failed - Invoked on: 2/21/2001 4:00:00 PM - Message: The job failed. The Job was invoked by Schedule 1 (Forum). The last step to run was step 1 (Forum).
But when I execute it manually, it run successfully.

I am using MS SQL 7.0
Your help is much appreciated.

View 1 Replies View Related

Job Scheduling

May 19, 2002

i'm very new to sql server and stuff... so i'm lost here.
i'm using the job scheduling wizard and i'm getting a couple of errors. first of all i need this vbscript to run weekly... do i need to translate it to tsql, or can i just paste this into the job scheduler thing?

-----------------------------------------------------------
dim strSQL, oConn, objRS
const adOpenDynamic = 2
const adLockOptimistic = 3
Set oConn = Server.CreateObject("ADODB.connection")
Set objRS = Server.CreateObject("ADODB.Recordset")
oConn = "my conn string with secure info you cant see :)"
strSQL = "SELECT BattleRD FROM BattleList"
objRS.Open strSQL, oConn, adOpenDynamic, adLockOptimistic
objRS.MoveFirst
While Not objRS.EOF
objRS("BattleRD")=objRS("BattleRD") + 1
objRS.Update
objRS.MoveNext
Wend
objRS.Close
Set objRS = Nothing
-----------------------------------------------------------

here are my errors in the job scheduler after selecting the dates...

error 229: execute permission denied on object 'sp_help_operator', database 'msdb', owner 'dbo'

and...

error 229: execute permission denied on object 'sp_help_targetserver', database 'msdb', owner 'dbo'

what am i doing wrong / what do i need to do?

thanks

View 1 Replies View Related

Job Scheduling

Jan 29, 2004

Hi,

I have two jobs scheduled on the Agent. Each job has ten steps. The next step is executed only if the previous suceeds.

I want Job 2 to execute only if Job 1 suceeds. How do I schedule that?

I was thinking that I can have the ten steps of Job 2 as steps (11 to 20) of Job 1 with each step executing after the previous one succeeds. If I do that then I can get rid of Job 2.

Let me know what approach you would advise.

Thanks

View 3 Replies View Related

Job Scheduling

Jun 24, 2008

I am trying to schedule a simple job to run a stored procedure in my database. The stored procedure runs perfectly when I do so manually, however when I ask a job to run it, it gives me the following error:

Access to the remote server is denied because the current security context is not trusted [SQLSTATE 42000](Error 15274).

The stored procedure does create a linked server (to an ORACLE database) and executes some commands across it. I've tried doing the link server creation as a separate step in the job and it executes that just fine so it has no issues creating the server, it just dies when it tries to use it. The job owner is the same user I've been using the execute the procedure manually. I also run the procedure step as that same user. But I still have this problem. Someone please help me!!

View 1 Replies View Related

Job Scheduling

Oct 22, 2007

Hi,

Is it possible to input values to a sql job so that the sam ejob runs for different parameters i.ee the same job runs for X on all 7 days o a week and for Y only on all weekdays...

View 7 Replies View Related

Scheduling SQL Job

Nov 15, 2007

My boss wants to schedule a job that will run on the Wednesday night before the first Thursday of every month, recur on the first Thursday, and again on the Friday, Saturday, Sunday and Monday following the first Thursday of the month.

I've already got the first Thursday scheduled. Is there a way to schedule the other days. I haven't been able to find any documentation on how to do it, if it is possible. And I've looked at the sp_add_jobschedule to noavail.

Any help would be much appreciated. Even if it is telling me it can't be done.

Thanks

View 3 Replies View Related

Scheduling Bug?

Dec 20, 2006

Hi!



I'm trying to create a subsciption for my report. In first creation I can do scheduling just fine, but when I try to edit my schedule, it's totally different. It shows value 1.1.0001 and when I try to change it, it's gives me first message:
value of '1.1.0001 0:00:00' is not valid for 'Value'. 'Value' should be between 'MinDate' and 'MaxDate'. Parameter name: Value (System.Windows.Forms)

and after that when pushing OK it gives me message: "The required field StartDateTime is missing from the input structure. (rsMissingElement)".

Do you think it's a bug or is there something which I'm doing wrong?

Tero Kruth

View 3 Replies View Related

Scheduling With SQL Databases.

Feb 22, 2007

I know enough about Databases to get myself in trouple.  So maybe someone can point me in the right direction, or help me out.  I work for the American Red Cross in Provo UT.  We want to be able to put class registration on line so that someone can visit our website chose the class they want to take, register and pay for it all on-line.  Our website http://www.redcrossut.org is hosted with godaddy and I am able to post a SQL Database.  I know that our website as it stands is very poor.  The people who have maintained it in the past have no idea what they were doing, my job is not the website, I am over Health & Safety Training, but have done some work with websites for fun in the past.  I know a little about Visual Studio and plan to rebuild the site using C#.  I can build a basic Database and interface to it with Visual Studio, Godaddy can help me with the payment part, but I have no idea how to set up SQL to allow scheduling.  Any help would be appreciated.  Even if it’s just a link to a tutorial.
 
Ed Hall
Director Health & Safety Services
Mountain Valley Chapter
American Red Cross

View 2 Replies View Related

Scheduling A Task Using DTS

Sep 20, 2005

Hey Guys!

I have a SQL Update Query that I want to run automatically everyday and
I have read through the posts and I do not understand very clearly how
to go about creating one.

The SQL query I want to run is this:

UPDATE Rental
SET TotalFee = ExtraFee + TotalFee
WHERE DaysOverdue >= 0

Once I have made a DTS package. How do I declare it in my coding???

Thanks in advance!

View 4 Replies View Related

Manual Job Scheduling

Aug 30, 2002

We are using an MSDE database engine (1.0=sql7) as a report scheduler on a web server. I can access MSDE via SQL7 Enterprise Manager to connect and view MSDE, but cannot use the DTS and job scheduling as MSDE seems to lack needed components. Using Microsoft Knowledge Base article Q241397 as a guide, I was able to create a backup of the msdb database using stored procedures including sp_add_job, sp_add_jobserver,etc, that are already present in the msdb database.

My problem is that I need to create and schedule a job for another MSDE database called CE8. This database was created by the reporting app, and contains no stored procedures. It looks to me like only msdb has the needed job scheduling procs. Does this imply that I am supposed to schedule all jobs for all databases via msdb database, or will I need to copy all job scheduling stored procedures into the other CE8 database, then create a job? Hope this makes sense,
Randy

View 1 Replies View Related

DTS Scheduling Problem

Mar 30, 2001

Does anyone else ever have a problem getting scheduled DTS packages to run? I have a package that is replicating from an Access database. If I manually execute the DTS package, it works fine. If I try to schedule the same package, it bombs. Also what password do you use for the Owner and User when you are trying to schedule a SQL Server (not repository) DTS package? I've tried my loging password and it I still get problems.

View 3 Replies View Related

Scheduling A DTS Package

Apr 6, 2001

I have created a DTS Package which collects data from DB2 and stores in a table on SQL Server v 7.0. The execution of the package works fine.

When I schedule the package by right-clicking and selecting SCHEDULE PACKAGE,
I fill in the dialog box. When the package runs, I receive the following error:
DTSRun: Loading... Error: -2147217390 (80041012); Provider Error: 0 (0) Error string: [Microsoft][ODBC SQL Server Driver][Named Pipes]ConnectionOpen (CreateFile()). Error source: Help file: Help context: 0. Process Exit Code 1. The step failed.

I get this same error when I run the package as a job.
The package is in the repository. My run command looks like:
DTSRun /S 111.11.11.11 /U sa /P xxxx /N DTS_Projections /R
The package owner is sa.

Can anyone offer any advise

View 1 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved