What's the best way to backup jobs in SQL Server 2000?

View 3 Replies


ADVERTISEMENT

Sql Jobs

Aug 2, 2005

Hi,It may sound funny but it is true. I have 2 version of same procedure, 1 is named as "update_aggre" other named as "update_aggre_2" .if I run these procedures using sql jobs the 1st procedure takes 12 seconds and the 2nd takes 2 second. I am stil surprise why is that both of them have same code.Any ideas please?and also I need to have lock mechanism within a procedure so that if some one is calling a procedure which is already called by some one ans is stil working on it the second user shld not be able to overwrite the existing data untill the first one is finished.TIAAmit

View 3 Replies View Related

Can't Run Jobs In SQL 7!

Mar 20, 2000

We're upgrading to Sql 7 from 6.5 but having problems running jobs with the following sql statement :

SQLMAINT.EXE -D master -BkUpDB e:dump -BkUpMedia DISK -DelBkUps 2 -Rpt d:salogmaster_dump.log


The error message is [Microsoft SQL-DMO (ODBC SQLState :28000}] Error 18456:[Microsoft]ODBC SQL Server Driver][SQL Server]Login failed for
user 'Domainuser'. Process Exit Code 1. The step failed.

The user is a domain account and already in local administrator group. It also starts up both Sql server & Sql server agent. It can run the same job on another server. I have compared the set up and can't find any differences.

Thanks in advance for your help.

View 2 Replies View Related

SQL Jobs

Nov 17, 2000

If i've created myself a job on my SQL Server and then scripted it, how do i run this script and so doing create my job on another server?

View 2 Replies View Related

Jobs Won't Run

Jan 18, 2001

Hi, I have a DTS package that runs correctly when executed manually, but when I schedule a job via the package, the job begins executing and nevers seems to complete the run. The Package runs in less that 1 minute, but the job sticks on executing and does not complete. I have to cancel, any ideas?

Thanks

View 1 Replies View Related

Jobs

Sep 6, 2000

I have 12 scheduled daily jobs, all the jobs are depending on one job.I want to run rest all the jobs if and only if the Job#1 gets success.Now all are running independently.Is there a way to force the sequence by using SQL.
Thanks!

View 4 Replies View Related

Jobs

Aug 30, 2000

If we have several jobs running several times daily,do we have to do any clean-up with the logs/job history so that they don't run into any problem later?Will it be o.k if we do not clear off the history frequently?

View 2 Replies View Related

Jobs In 7.0 Vs. 6.5

Feb 16, 2001

Hi all,
My firm has about 15 SQL Servers. 5 of them are still 6.5 and the other 10
are 7.0. I have noticed that the jobs I have setup to perform maintenance
tasks, backups etc. almost never fail in 7.0. Similar tasks routinely
fail on the 6.5 servers.

So I did a test. I deleted a database in 7.0 and ran a backup job. Although
the log for the job said that it couldn't find the db it still said the job
was successful. In 6.5 if you try to run a job on a non-existent db it
fails. What's going on in 7.0? What has to happen for a SQL Server agent job
to fail. This seems like an awfully dangerous new "feature".

If anyone could shed light on this I would appreciate it.

Thanks
JJ

View 2 Replies View Related

DTS Jobs

Mar 5, 2001

Hi,

How do we add DTS pakages to a scheduled job ?
Ex: Lets say i have 2 DTS pakages One has got to run immediately after the other.
>Now i create a schedule for the main DTS pakage.

>Once i create a schedule, It goes into Jobs as a Scheduled job.

>Now in the propertied part of the first DTS job i need to add a second DTS
as Step2, mentioning that it should run after the First DTS.

How do we do this ?

Thanks in Advance,
Siv

View 1 Replies View Related

SQL 7 Jobs

Jul 23, 2001

Does anyone know how I can set up some form of alert that tells me which scheduled jobs are still running?

View 1 Replies View Related

Jobs Sit Up Doing Nothing

Sep 21, 2001

We had some jobs in Sql server 7.0 which ran together at the same time.
Now we have moved to sql 2000 and when we run those jobs together again they just sit up(keep on going without doing anything) and do nothing.I have monitored that there is no Blocking or any kind of Performance Overload.

These jobs run fine when they are executed Individually in Sql 2000

Any kind of help will be appreciated.

Thanks,
James

View 5 Replies View Related

What Are Jobs?

Sep 29, 2004

hey guys!! can someone tell me, what are jobs on MS SQL?
and what is a job scheduler? how do it function? what are the processes
involved? and additional information about this stuffs.. thanks..really need it.. tnx tnx..

p.s.
if your wondering
why i asked the questions
here..because it's really
hard to search the meaning
of it in the net..i hope you
guys could help me.. tnx

View 2 Replies View Related

Right To Run Jobs

Oct 5, 2004

Thanks for the help with moving jobs from one server to another.

Now that I have moved them, they now fail each and all. I have copied the script and saved them as vbs files and placed them in a folder on the server and ran them successfully. I think it has something to do with the rights, but I don't know what. Could someone shed some light on possible causes?

Thanks,
Lee

View 6 Replies View Related

MS SQL Jobs

Dec 6, 2004

Hi SQL Guru's

I am trying to run a job on Multiple SQL Servers in a domain.I am setting the job on my system,but the Radio button "Target Multiple Servers" is disabled.How do I enable the radio button "Target Multiple Servers".
Please let me know if this is possible.

Best Regards

SK.

View 1 Replies View Related

Jobs Are Here

Oct 31, 2005

http://www.dbforums.com/forumdisplay.php?f=246

View 6 Replies View Related

SQL Jobs

Feb 5, 2007

I need some direction on SQL Jobs.

I can handle the setting up a SQL Job/DTS Package.

What I have is SQL Statement I need to run that creates a txt file Renames file to AUX_Export_020507.txt then zips that text file and Name it AUX_Export_020507.zip. Then move the zip file to a FTP directory.
I would like to get email after it runs also.

This issue I am having is the Part that zips the file
Renames the text file and zip file to add the current date on end like I have above and move it to a FTP directy..

The old days we would creat an autoex.bat file to move and rename.

Thanks
Michael Webb

View 5 Replies View Related

Jobs

Nov 9, 2007

Hi All,

I want to create a job which will basically fetch the information from the system. I mean job will fetch the following information about disk available in the system.

1) Drive
2) Total Size
3) Available Space
4) %free space

Suppose I have 3 drives d,h,i
The information should look like this

Drive Totalsize Available Space %free space
H 2 Gb 1 GB 50%

Can anyone please help me.

Regards,
Frozen

View 4 Replies View Related

Jobs For SQL

Nov 29, 2007

I already learned SQL by reading "Head First SQL" book (which uses MySQL). I also know how to use Excel(using basic function and creating pivot table.) However, I noticed that many available jobs require Microsoft SQL Server 2005 and also using SQL with Excel. Now, I am thinking to learn SQL Server 2005 Express Edition because it is free! I would really appreciate if anyone who has been working in industry give me some suggestions about what is the best way to learn SQL Sever 2005? or does it worth to learn? or is it hard to learn? Can you recommend good book or website for learning SQL Server 2005 Express Edition. Thanks!

View 3 Replies View Related

Jobs

Jan 9, 2008

How is it possible to schedule a job to run every 40 seconds.
It seems every 1 minute is the shortest time available in the job properties for scheduling a job.
Thanks

View 3 Replies View Related

Jobs

Feb 3, 2008

I have 2 jobs
in first job,there are 2 steps
in the 1st step it has to take the backup
in the 2nd step it has to call the 2nd job

in 2nd job,it has to restore the backup

i dont know how to call another job in the second step and one more thing is the restoration is done on another sql server instance

View 3 Replies View Related

Jobs

Feb 9, 2008

I have to create 2 jobs,The first job has 2 steps,in the last step of the first job,i have to call the 2nd job,How????Can any body help me?

View 1 Replies View Related

About Jobs.

Mar 5, 2008

Is there anyway(trigger) so nobody can delete the jobs in SQL Server?Actually we have 4 people who has SYSADMIN rights in that server and just wanna track out.No information is recorded in error logs and application log.

View 4 Replies View Related

How To Monitor SQL Jobs Using C#

Apr 3, 2008

Hi ..
i have a task to monitor the sql jobs..
i wish to do with this with C# or asp.net application.
please help me to finish this..
 

View 7 Replies View Related

Editing SQL Jobs

Mar 9, 2005

I have scheduled a T-SQL job that runs every morning using Enterprise Manager. Now I want to change the SELECT and UPDATE statements that this job runs, but I can't find anywhere to edit a job that has already been scheduled. Any help would be appreciated.

Thanks

View 1 Replies View Related

SQL Server Jobs

Apr 29, 2002

I have moved my database recently from a NT server to a Windows 2000 server, both running SQL 7.0 I have a couple of jobs that sometimes, work, sometimes not, the problem it tells me is that it cannot find the file specified, I run the job from enterprise manager and it runs just fine, it'll run here and there but it still fails frequently. Any suggestions on what to check? Thanks.

Bob

View 4 Replies View Related

Distributing Jobs In SQL

Mar 22, 2001

I want to know if there is anyway to distribute jobs to a non system
administrator. In other words do they have to have System Admin rights, to be able to modify a job and run the job.

View 1 Replies View Related

Scripting Jobs

Apr 10, 2001

I would like to move over all of my DTS packages and corresponding jobs onto another MS SQL server machine. The problem that I have is that I haven't been able to find any straight-forward info on how to script up these jobs, move them onto another machine and execute them. I have scanned through previous posts written by people with the same problem, but every response is simply "script up the jobs and move them onto another server." Maybe I'm missing something, but how "exactly" do I get a job to show up on this destination machine in EM, in the management/sql server agent/jobs folder. I did the jobs/all tasks/script job... but then what? I saved it on this destination machine, but am unclear as what to do next. The MS SQL Server Administrators companion book is of no help on this subject, and I do not understand how this simple task can be so confusing and is not documented. Any help would be greatly appreciated.
Thanks in advance!
TB

View 2 Replies View Related

SQL Agent Jobs

Jun 6, 2001

I have a series of jobs in the SQL server Agent that will begin and appear to run fine, but will never finish. Is there a way to limit the time that a job will run in the agent, for instance stop with failure if not completed within 1 hour?

Thanks for the help
Ken

View 1 Replies View Related

SQL Server 7 Jobs

Jul 26, 2001

When I change the SA password on my server the current SQL Jobs no longer
work. How can I fix or get around this problem without rebuilding my jobs?

View 1 Replies View Related

Scheduled Jobs-Can You Have Too Many?

Jul 27, 2001

I'm thinking of using the SQL Agent Job Scheduler as part of a larger application and I'm wondering if anyone knows of a limit on how many schedules or jobs that can exist on a SQL Server at one time.

Thanks!

View 1 Replies View Related

Jobs Prob

Aug 24, 2001

I have a couple of jobs set on 1 server. I want these jobs to be transferred, or rather copied to another server. Is there a method by which I can just point these jobs to another server, without having to manually create them again ??

Thanks!

View 1 Replies View Related

Running Jobs...

May 24, 2000

Hi,

I'm using SQL SERVER 7.0. I'm wondering if it is possible to start a job with TSQL from within Query Analyzer?

Thanks,
Darrin Wilkinson

View 1 Replies View Related

Jobs That Have Not Finished

Feb 28, 2000

I am trying to create a SQL Job which will report on another job which hasn't finished within its normal completion time. I schedule the new job late enough after the first job that the first should have finished by then.

I would like to have just queried msdb..sysjobhistory.run_status. However, this seems to only report on job STEP status - and after the step is finished! It is always showing run status = 1 (Complete).

Does anyone know the base meta-data table and column I could query? Enterprise Manager shows the current status as running and I want to know where it gets that.

If it is still running, I will raise an error to notify our support group, etc.

PS: My job steps include a combination of DTSRun commands and TSQL commands. I don't think the flavour of commands should matter...

Thanks.

View 2 Replies View Related