Production And Test Environment

Jun 25, 2004

Sould one has a seperated environment for production and test system? How do you do it on a same server? Install two instance? How do you seperate test DBs from the production DBs?
Please advise...Thank you

View 2 Replies


ADVERTISEMENT

Is It Necessary To Have A Clustered Test Environment To Support A Production Cluster?

Nov 27, 2007

We will be implementing our first SQL cluster in December. Our current plan calls for a shared development/test database server with one physical server, but two SQL Server instances. Our production environment will be a SQL cluster. Is it necessary to create a clustered test environment for testing patches, hot-fixes, etc...?


Thanks, Dave

View 2 Replies View Related

SQL 2012 :: Setting Up Transaction Replication In Test Environment From Production

Mar 3, 2015

Setting up Transaction Replication in test environment. I am willing to bet that most of you take a production backup (if so, how, and using what?), restoring the database to your test environment, then running a snapshot to your subscriber and away you go.

But perhaps you take a backup of your publisher and subscriber, if so, how do you know there are no inconsistences because there were transactions sitting on the distributor?

What do you do if you have additional indexes on the subscriber for reporting, that are not on the publisher?

Here at work we are having issues with getting consistent databases set up with T Rep, missing rows, duplicate keys at subscriber etc. How to avoid these issues.

View 0 Replies View Related

Securing Production Environment

Feb 18, 2008

Hi,

I want to make some steps towards securing production database.

1. Give limited rights to Developers, i.e. db reaonly, db writedeny
2. Make strong password for local and Domain
3. Use Windows authentication
4. Enable log for 'Failed Login' attempts.

What steps I need to take in addition to those?

View 4 Replies View Related

Creating A Test Environment

Mar 28, 2007

I just got my first job doing some DBA work (junior level) in a small company using SQL Server 2000.

I would like to make a copy of the production DB and use it for development of SP's, DTS packages and views.

What is the safest way for me to copy the entire production DB, to a new DB on the same server?

Should I create a new DB, and do a restore of the production backup?

Any help would be appreciated,
Thank you.

View 3 Replies View Related

How Can I Back-up My Database In Production Environment.

Apr 24, 2007

I developed an asp.net application in visual web developer 2005 express edition and SQL sever 2005 express with Advanced services. The application has been deployed and iam wondering what tools are availabel to for backing up my data. Are there any tools i can use to back-up my database. Iam not talking of third party tools but tools a vailable in sql sever 2005 express with advanced services or visual web developer express.
OR can write a vb.net Sub procedure that i run and have my database backed up. If so where can i start or what other options may i explorer.  

View 4 Replies View Related

Not Returning Results In Production Environment

Oct 7, 2015

I have this script that captures metrics and sizes using T-SQL. When running in development I have no issues. I can run under the context of any database and get results back. When deploying to production servers no results are returning. I'm trying to figure out what permissions are needed for this to return results.

No error message is being returned either. My access is limited for triage against Production? I need to be able to have Production DBA set the right permissions so this job can run correctly.

DECLARE @allocation_table table
(
dbname sysname,
reservedpages bigint,
usedpages bigint,
pages bigint

[Code] ....

View 1 Replies View Related

How To Test Before Putting In Production

Jul 17, 2006

Hi all,
I have a asp .net 1.1 application running on the intranet which uses SQL Server 2000.
The application is in production and everytime I want to do some changes, i do the changes on my
development machine then I copy the application dll on the server.
The problem is that I'm using Stored Procedures for all my Select, Insert and Delete statements.
These stored procedures are live on the server so I can't do the modifications locally and test them then copy to the server.

How can I do modifications without affecting the production server and the users ???
thanks.

View 4 Replies View Related

From Test Environment To Web Hosting Company

Jul 9, 2006

I must be missing something, and its starting to fusterate me.  Bear with me here.
I created a site for a ...client I guess you'd call it, and made this really slick newletter generator thing.  The people from the web enter in their info, and if they want, they sign up for a newsletter -- all tied into a db, 1 table, 4 stored procedures, REALLY simple stuff.  They insisted I used a certain webhost which, on paper, looks like it will fit the bill.  I'm starting to question that.
On top of the newsletter thing, I created an aspnetdb for the "administration" side of it for her to log into and send out the newsletter so total, there's 2 dbs in the app_data folder.  Locally, it works GREAT and on my test box (iis6) that is running 2k5 express.  The webhost runs sql2k in (what I consider) a bastardized way.  Can't use the management studio, can't use anything except a really weak web-based interface which adds to my fusteration.
Anyway, my questions : 1, is there a way to make the mdf files work with sql2k without having to re-do the whole thing and 2, if I have to redo it, does anyone have an example connection string that might help out?

View 1 Replies View Related

Test Cluster Environment Recommendations

Apr 23, 2001

I want to build a SQL testing environment in an active/active setup. Any recommendations on what I could use if I want to set up the most bare-bones system. I want to do it as cheaply as possible.

Thanks

View 1 Replies View Related

Value Of Profiler Traces In A Test Environment

Sep 26, 2005

I am debating whether to go to all the trouble of setting up on-demand Profiler traces on some test servers for the developers here. Really just tracing RPC:Completed and SQL:BatchCompleted, so the developers can at least try to catch a performance problem before going to production. The question I have, though, is just how useful is this sort of information to mid- to low-level (i.e. experience) developers. One of the bigger concerns is over Java applications, which like to hide their queries behind a lot of "sp_cursorfetch" calls.

My question to the forum is if you are a developer, have you ever dreamed of having this sort of information available? How useful is it?

I am going to try to post a poll along with this, but I am not sure it will work..

View 3 Replies View Related

Backups To Create Test Environment

May 1, 2008



Hi there,

We have a production database that was generated by a vendor. The vendor wants us to test a new version of their software. This testing process will take several months. The users want the testing to be as real time as possible. I have developed a series of scripts that will back up our databases and ship them over to our test environment on a nightly basis. We also of course have nightly backups. As a general rule, we do full backups once a week and differentials on a nightly basis.

We are a phone company that has transactions being applied to the database 7 X 24.

My question is this: Is there a way (an option or something) that when my backup of the production database which is destined for the test environment runs, I can tell it to not set the flags that indicate a backup has been done. What I want to avoid is the differential backup process from being 'Confused' about what backup it is doing a differential for.

I would appreciate any help or insight you can give me.

Thanks! - Eric-

View 1 Replies View Related

Install SQL2000 And SQL2005 In Production Environment?

Dec 2, 2005

Hi,

Is it possible to deploy both SQL2000 and SQL2005 on the same server in the production environment?

Is it recommended? Next year we will be deploying a SQL2005 solution and was wondering if we could get away with installing it on the same server as the SQL2000 server, or whether we should put it on another server.

We have up to a maximum of 50 concurrent users.

Thanks.

View 2 Replies View Related

Database Environment Naming Production -vs- Development

Jul 23, 2005

I have been looking for some documentation that would support or rejectmy opinion on Production -vs- Development naming conventions. Ibelieve that each environment should be housed on separate servers withidentical names, access, users, stored procs....... If you eitheragree or disagree with this methodology, I would appreciate your input.TIA,Bill

View 5 Replies View Related

Problem In Executing Package In Production Environment

Aug 30, 2006

hi all!

This is my problem. My package executes fine when i set the connection string with the same database where i execute the query. If i execute with another database connection stirng if fails bacause while executing the pacakge it trys to access the same connection string at design mode.

when i try to execute through cmd prompt by setting conn <new database connection string> it fails.

Is package configuration is the only solution. how can i change conn string depending on different server?

Any help would be appreciated.

Thanks,

Jas

View 3 Replies View Related

Classic ASP Errors Out Only In Production Environment With EOF Error

Oct 1, 2007


Microsoft VBScript runtime error '800a01fb'

An exception occurred: 'EOF'

Used the same connection string and DSN (i.e pointing to the same database/server) in both environments. ASP works in Test Environment. Fails in Production Environment.

Test and Production have same versions of software.

Environment Details:

OS: Windows 2003 SP2
MDAC: 2.8
Database: HP Neoview

Any help appreciated.

Thanks,

Venkata.

View 1 Replies View Related

How To Copy A Database From Production To Training Environment

Oct 21, 2015

Our DBA is out for about 6 weeks. One of his regular jobs is to take a Database that is in our Prod environment and copy it to our Training environment.

I have backed up and restored to different servers before, however the Database name in Prod is different than in the Train environment in this case.

In other words I have a PROD database named DATABASE-XX that I want to copy to another SQL server and restore it to DATABASE-XX-TRAIN.

Is there anything special I need to do, other than backup on PROD, copy to TRAIN and restore to the corresponding DB in TRAIN?

View 11 Replies View Related

Wait For First Service Pack Before Using In A Production Environment?

May 9, 2008

We usually wait until a service pack has been released for a product like SQL Server before using it in production. Is this over cautious or the norm?

Thanks
Danny

View 5 Replies View Related

Applying SP1 On Sql Server Express Production Environment

May 30, 2006

How do you apply Service Pack 1 to Sql Server Express 2005?

View 1 Replies View Related

Keeping A Production And Test Db Insync

May 14, 2004

I have just finished upsizing an Access database to SQL Server 2k. Now the SQL Server need to be run on a test basis to determine if i need to make more changes to the front-end (Access). The problem I am facing is how to keep the two databases in sync while I am testing. Any suggestions?

Also any suggestion or comments on how to run a test setup like this (in parrallel) are also welcome since this is my first time attempting a project like this.

Let me know if anyone needs more info.

Thanks in advance.

View 1 Replies View Related

SQL 2012 :: Approaches For Creating A Test Environment

Dec 11, 2014

I am try to put together options in regard to creating a test environment for our Dynamics NAV system. The environment will be mainly used to test new releases / changes ahead of applying them to production.The 2 options I am considering are…

1.Create a second Test instance on our Production SQL Server to host a test database

2.Purchase a set of SQL developer licences and having a totally separate server for our test environment.

My preference would be option 2. However I need to build a convincing case that this is the best way forward. I wondered if I could tap into the thoughts of the SQL Central community and see how other approach this.

View 3 Replies View Related

Migrate Project From Test To Prod Environment?

May 3, 2007

So, we are about 3 weeks away from going into production, and somehow we failed to give much thought to deploying our RS project into production.

We have over 110 report models that need to be deployed into production, and until now, we just deploy into our dev and test environments using Visual Studio. But, in our production environment, our deployers will not have Visual Studio.

Is there any simply backup/restore method that can be used to move our test environment into production? Please don't suggest a copy of each file one at a time /sigh.

Appreciated,
Scott

View 2 Replies View Related

Transfer Passwords From Production To Test Server

Aug 8, 2002

I would like to know what procedures are required to transfer passwords from my Production server to my Test server.

View 1 Replies View Related

Comparing Development, Test & Production Database

Aug 2, 2001

Hi,

We're using SQL Server 2000 as back end in our web project. The problem is we've 3 different copies of same database - one each for Development, Test and Production sitting in 2 different machines.

My question is - is there any tool for comparing the objects (tables, stored procedures, etc) ?

Thanks,
Harish

View 2 Replies View Related

Move A Subset Of Data From Production To Test

Nov 18, 2005

Here is my requirement.

There is a production database which has ever increasing data. For testing purposes though, I would like to build a test database with exactly the same schema but only a subset of data copied from the production database . I'll specify the criteria (something like a where clause in select query) for copying the data from the production database.

Is there a tool that anyone has come across to do this job ?

View 2 Replies View Related

SQL Server Test To Production Database Migration

Feb 25, 2006

Hi,



Is there any tool available to migrate the data from the SQL Server
test database to SQL Server production database. Data Migration should
be based on a condition which can be given as an input for a table by
the user. The dependant tables also should be migrated based on the
condition. i.e data subsetting based on the matching conditions.



Ex : Salary > 2000



The rows of the table which matches the condition alone need to be
migrated for the corresponding table. Also its dependant table's
rows should be migrated based on the given condition. Please help me
with a tool which can automate this.



Thanks,

Smitha

View 5 Replies View Related

Turning Off Parent-child Relationships (one-to-many) Off In Production Environment Is Beneficial?

Oct 16, 2007

I have heard that turning off 'primary key-to-foreign key-relationships'  between tables , helps to boost performance in production environments. Is this really true?

View 4 Replies View Related

Query To Compare Table Data Between Test And Production?

Jul 23, 2005

I am debugging one of our programs and ran the fix in Test. I would liketo compare table 1 between Production and Test. I want the query to outputcolumn 1 if Production <> Test output.What is the best way to achieve this?jeff--Message posted via http://www.sqlmonster.com

View 2 Replies View Related

How To Change Application To Work With Test DB Opposed To Production DB

May 26, 2015

How do I change application code to easily switch between the application working against a test database versus working with a production database?

My thought is to change the connection string to work with a test DB, and when ready to Publish, change the connection string back to the production DB.  After Publish is successful, change the connection string back to the test DB.

At first, it appears it will work.  Will it?  Whether it will or won't?

View 3 Replies View Related

User Tables/Views Transfer Between Production And Test Servers

Feb 22, 2005

Hello
I have a production database that i need to refresh to our test environment daily. The database size is 700 MB.
I do not need to transfer the stored procedures and triggers , users and logins.
Would a DTS package that runs every night be the best and the easiest solution to implement or should i look into log shipping and snapshot replication.

thanks

View 2 Replies View Related

SQL 2012 :: Creating Test DB From A Full Backup Of Production Database

Jul 23, 2014

I am attempting to create a Test db from a full backup of the production db. With 2012, I cannot do it the the way i had done it in previous versions (and now i understand why because of Logical names).

The Test db runs in the same instance as Prod db.

I attempted to run this but come up with errors. This is what i executed:

RESTORE DATABASE TEST FROM DISK = 'E:<path>FULL.BAK'
WITH REPLACE, RECOVERY,
MOVE 'PROD' TO 'E:<path>TEST.MDF';

The errors are all cannot execute due to PROD is in use.

View 9 Replies View Related

Data Source Deployment Best Practises Supporting Development, Test, And Production Environments

Feb 4, 2008

We are setting up a new Reporting Services 2005 enterprise reporting tier that will support multiple developers, applications, and end users. We will have mirrored environments including development, test, and production each with their own database cluster, and reporting server.

We have multiple report developers who share a single Visual Studio solution which is saved in SourceSafe and is setup to have separate report projects for each business unit in the orgainzation. Each report project is mapped to a specific deployment folder matching the business unit. Using the Visual Studio Configuration Manager, we can simply flip to the envirnoment we want to deploy to and the reports are published to the correct environment and folder structure.

My problem lies with the common data sources. We are using a single master Common Data Sources folder to hold all of the data sources. The trick is that each and every reporting folder seems to have to have it's own copy of the data source in visual studio. There does not seem to be an easy way to change the data sources for the reports when you publish to various environment, i.e. development, test, production etc.

Ideally, we would have a single project for the common data sources that all reporting projects and associated folders would map to, and we would have a way to associate the appropriate data source for each environment when we deploy.

I'm looling for best practices on how to setup data sources for development and deployment in an enterprise environment that uses Visual Studio to develop and publish reports. We have 3 environments, and 6 data sources per environment and about 20 reporting folder / project in Visual Studio. That's 360 changes that have to be manged when deploying reports. Is there a best practices way to do this?

There has got to be a better way? Can anyone give me some insite into how to set this up?

Thanks!

View 8 Replies View Related

Auto Restore .bak From Production To Same Server's TEST Db With Other Dbs &&amp; .baks In Same Server.

Aug 10, 2007



Howdy;
I've tried this in the 'tools' area, but that didn't work too well. I suspect, I will have to generate a T-SQL code then schedule it as a job. Why I can't just drag and drop with basic desires, is beyond me, but THAT probably does exist.

anyway here is the problem
[this server has many databases, on SQL 2000 sp2]
1. User only wants me to use Monday morning's full backup, which is good in that it doesn't include transaction logs.
2. Restore that data overtop/into Developement db. = good, no data to worry about damaging.
3. User does NOT want me to do this by hand, but schedule it.

ok,
a. must do a RESTORE WITH FILELISTONLY from [?] what ?, master? and if I user the *.bak of the production, it has
a coded date field in the name entry SO, I would, I guess, have to generate all sorts of wonderful code to find the date and build a file name. Why, because using the FROM DISK = 'F:MSSQLBACKUPDBPRODUCTION_yyyyddmm.BAK' is not going to work with a wild card.
Can I do a file lookup using a 'PRODUCTION' prefix into a variable, then use that or should I look for latest file date [remember there are several database backups here], or ????

then. How does one schedule such a T-SQL. Do I save it to some text file, and invoke it using a job scheduler.

any help appreciated.

IS there an easier way.
rik