Profiler Duration Column Value.
Jul 12, 2007
Hi Experts,
We have a VLDB ( few table with above 200 million records ). This database is used for performance testing by simulating for 150 users and executing all necessary functional flows.
When I examined the profiler results , I could see some very high values as shown below in the duration column for many events.
1521729
3462142
1624325
3211255
1248276
3903998
Does it mean that that SP or the T-Sql statement is taking this much time in milliseconds to execute and give the output ?
Any help would be greatly appreciated.
Thanks & Regards,
DBLearner
View 1 Replies
ADVERTISEMENT
Jan 20, 2005
If monitoring for duration with sql profiler, what does the number represent ie 2733906 is it milliseconds, thousandths, looked in BOL no clear definition
View 2 Replies
View Related
Aug 1, 2002
Can someone please tell me what unit of measurement the Duration column is in when running SQL Profiler? I assume milleseconds, but am not sure.
I'm trying to filter on this and want to be sure I'm not missing anything.
Thanks!
View 1 Replies
View Related
Jan 9, 2007
Sarfaraz writes "I have captured SQL Profiler data. I was reviewing top running CPU intensive SQL statements. The Duration (in seconds) 1.39, 1.09, 0.16 and CPU (in seconds) 0.97, 0.95, 0.16 respectively for some SQL statements. How do I know what is the normal baseline for duration and CPU in order to determine the CPU intensive SQL statements.
Secondly same question for long running procedure duration 0.14, 0.11. What is the normal baseline here. Is this normal or too long.
Thanks,
Sarfaraz"
View 5 Replies
View Related
Jul 20, 2007
Hi
I have a procedure in a history database that does insert into 3 tables inside a transaction. users complaint that the proc sometimes takes too long during heavy usage. I did some traces to see what is taking up the time, I found that the rpc duration was averaging > 500 ms (should only take 50ms). I checked to see if one of that statements were taking too much time, but only see the commit transaction statement taking around 500 ms). I check the avg disk queue to be around 30. ( this is on a single local disk) .
So is this definitely a disk issue, or is there something else I need to check
thanks
P
View 1 Replies
View Related
Jun 19, 2007
Hello everybody,
I have a very stranger problem that I need to understand...
In last days I executed a plan SQL 2005 Profiler to review TSQL Duration. When reviewing the results encounter that a SP displays a value of 4037312 in field DURATION which are not normal.
Could to help me to identify why passes this?
View 5 Replies
View Related
Jun 2, 2008
I ran Sql profiler and got the following results for a stored procedure
CPU of 1078;
Reads of 125464
writes of 0
Duration of 1882
how do i interpret the above results.
also what CPU and Duration is considered high and indicating a poor performing query.
I am using SQL Server 2005. Thanks
View 4 Replies
View Related
Dec 9, 2004
I've set the Duration of my trace to "Greater than or Equal to: 1000". However when I start my trace the Duration column is now empty. Prior to the setting, there were values showing in this column. Any ideas on how to fix this?
View 1 Replies
View Related
Aug 14, 2007
Profiler was run against a database looking for "long running" queries. I used the Duration column to filter out the queries that I didn't want. When reviewing the output, I noticed that for some queries the StartTime was equal to the EndTime even though the Duration was set higher.
My question is, "What can account for this discrepancy and what inferences should I draw about the difference?"
Does the difference represent a resouce being locked or some other type of blocking (Duration) and once the query was allowed to run, it completed quickly?
TIA
=======================================
If Tyranny and Oppression come to this land, it will be in the guise of fighting a foreign enemy. -James Madison, fourth US president (1751-1836)
View 2 Replies
View Related
Jun 4, 2015
I have the following SQL query
SELECT
[Req_ID]
,[Service_Name]
,[Req_Started_Date]
,[Task_Name]
,[Task_Status]
,[Performer_Full_Name]
[code]....
Which works fine, but what I need to calculate the total duration of a request based on the duration of the tasks completed in the request based on Req_ID. I would like to use the CASE statement I have to determine the SLA_Mins for each task and add them together to get total request SLA_Mins.
Below is the create table schema and data
GO
/****** Object: Table [dbo].[MidrangeOtherSourceControl] Script Date: 06/03/2015 18:13:15 ******/
SET ANSI_NULLS ON
GO
SET QUOTED_IDENTIFIER ON
GO
CREATE TABLE [dbo].[MidrangeOtherSourceControl](
[Req_ID] [float] NULL,
[Service_Name] [nvarchar](255) NULL,
[code]....
View 9 Replies
View Related
Jul 27, 2006
I run Profiler against my production Db to keep an eye on poorly performing t-SQL batches and SPs. There's an "Error" column in the profiler output. According to BOL (topic:Describing Events by Using Data Columns), Error = The error number of a given event. Often this is the error number stored in sysmessages.
The profiler output usually shows "0 - OK" in the error column. But it sometimes shows "1 - Error" or "2 - Abort" in this column. What do these error messages mean? I've looked around but haven't been able to find anything more detailed about what these two messages mean and how I can perhaps dig deeper to figure out what's going on. (When these values are displayed, CPU is usually taking a beating and the SPID runs this for at least 30 seconds before displaying information pertaining to this SPID).
Thanks much,
Smitha
View 9 Replies
View Related
Jul 20, 2005
Is there a way to determine why the Textdata field has "NULL" for a value.The trace shows multiple "NULL" value records with the longest durations;many greater than 50,000ms. The {} indicate the TextData and Duration onthe line below:rownumber | textdata | Eventclass | ......| Duration |...966 | 15 | {NULL} | 24 smm5413 | 808 | Microsoft Office XP | misview012 | 78| {604636} | 2004-02-11 15:25:12.010 | 4747 | 0 | 469
View 1 Replies
View Related
Aug 19, 2015
Is the SQL Server Profiler Reads Column Incorrect For Parallel Plans?
I often use profiler as one tool to identify bad plans. The reads column gives me a good indication of excessive IO to dig into and correct if necessary. I often use it with Showplan so I can see what a query does, replicate it and fix it.
However I have just lost some faith in it. I am looking at a poorly performing query joining five tables. A parallel plan has been generated and one table is being scanned (in parallel) due to a missing index. This table had in excess of 4 million rows in it. The rest hitd indexes well. However the entire query generates ONLY 12 READS.
Once corrected, a single processor plan is used. This looks really efficient and uses 120 reads. That looks the right figure to me.
Does the profiler only display one thread of a parallel plan perhaps? Or something else?
View 9 Replies
View Related
Aug 19, 2015
I often use profiler as one tool to identify bad plans. The reads column gives me a good indication of excessive IO to dig into and correct if necessary. I often use it with Showplan so I can see what a query does, replicate it and fix it.
However I have just lost some faith in it. I am looking at a poorly performing query joining five tables. A parallel plan has been generated and one table is being scanned (in parallel) due to a missing index. This table had in excess of 4 million rows in it. The rest hitd indexes well. However the entire query generates ONLY 12 READS.
Once corrected, a single processor plan is used. This looks really efficient and uses 120 reads. That looks the right figure to me.
Clearly 12 reads is wrong. Does the profiler only display one thread of a parallel plan perhaps? Or something else?
View 1 Replies
View Related
May 13, 2015
I found this nifty code on stackoverflow that works well but I'm trying to send the results to a text file and the column lengths are huge. I used CAST for the first line and it worked great but I can't seem to make it work with duration. Here's the original code:
SELECT
j.name,
h.run_status,
durationHHMMSS = STUFF(STUFF(REPLACE(STR(h.run_duration,7,0),
' ','0'),4,0,':'),7,0,':'),
[code]....
how to run a CAST on DURATION?
View 5 Replies
View Related
Jan 18, 2007
I am trying to get a query that will allow me to report the time taken to complete a certain training module.
The database itself does not have a duration field so I am tring to get the duration by using MIN and MAX. I can get the timing for when the module was opened and the time for the last mouse click on it, from this I need to be able to calculate the time taken to complete.
Query I am using to get the basic info comes from 3 tables so I have only attached the relevent output. Query used is as follow:
SELECT *
FROM PPS_SCOS, PPS_TRANSCRIPTS, PPS_TRANSCRIPT_DETAILS, PPS_PRINCIPALS
WHERE PPS_SCOS.SCO_ID = PPS_TRANSCRIPTS.SCO_ID
AND PPS_TRANSCRIPTS.TRANSCRIPT_ID = PPS_TRANSCRIPT_DETAILS.TRANSCRIPT_ID
AND PPS_TRANSCRIPTS.PRINCIPAL_ID = PPS_PRINCIPALS.PRINCIPAL_ID
AND PPS_SCOS.NAME LIKE 'MTM-106 The Dangers of Smoking'
AND PPS_PRINCIPALS.NAME LIKE 'Nigel Cordiner'
AND PPS_TRANSCRIPTS.TICKET NOT LIKE 'l-%'
ORDER BY PPS_TRANSCRIPT_DETAILS.DATE_CREATED
Output:
pps_scospps_scospps_transcript_detailspps_principalspps_principals
SCO_IDNAME DATE_CREATED PRINCIPAL_ID NAME
136850MTM-106 The Dangers of Smoking08:17:2516287Nigel Cordiner
136850MTM-106 The Dangers of Smoking08:17:2516287Nigel Cordiner
136850MTM-106 The Dangers of Smoking08:17:4016287Nigel Cordiner
136850MTM-106 The Dangers of Smoking08:18:2516287Nigel Cordiner
136850MTM-106 The Dangers of Smoking08:18:5716287Nigel Cordiner
136850MTM-106 The Dangers of Smoking08:19:1416287Nigel Cordiner
136850MTM-106 The Dangers of Smoking08:19:4716287Nigel Cordiner
136850MTM-106 The Dangers of Smoking08:20:2116287Nigel Cordiner
136850MTM-106 The Dangers of Smoking08:20:4416287Nigel Cordiner
136850MTM-106 The Dangers of Smoking08:21:2616287Nigel Cordiner
136850MTM-106 The Dangers of Smoking08:22:1316287Nigel Cordiner
136850MTM-106 The Dangers of Smoking08:24:5516287Nigel Cordiner
136850MTM-106 The Dangers of Smoking08:25:1216287Nigel Cordiner
136850MTM-106 The Dangers of Smoking08:25:2916287Nigel Cordiner
136850MTM-106 The Dangers of Smoking08:26:4916287Nigel Cordiner
136850MTM-106 The Dangers of Smoking08:27:0216287Nigel Cordiner
136850MTM-106 The Dangers of Smoking08:27:2916287Nigel Cordiner
136850MTM-106 The Dangers of Smoking08:27:4316287Nigel Cordiner
Have added the column heading and the tables the output comes from.
Relatively new to SQL so any help would be greatly received.
View 4 Replies
View Related
Jan 24, 2008
I have a query that displays number of hours duration in a jobs by months matrix. Here is a simplified version of my tables.
CREATE TABLE jobhead (
jobnum varchar (14) NULL,
jobcompletiondate datetime NULL
)
CREATE TABLE labordtl (
jobnum varchar (14) NULL ,
clockindate datetime NULL ,
clockintime decimal(6, 2) NULL ,
)
Here's an abbreviated query.
SELECT h.JobNum,
(CASE WHEN MONTH(h.JobCompletionDate) = 1 THEN datediff(day,MIN(l.ClockInDate),MAX(l.clockInDate)) ELSE 0 END) AS JAN,
(CASE WHEN MONTH(h.JobCompletionDate) = 2 THEN datediff(day,MIN(l.ClockInDate),MAX(l.clockInDate)) ELSE 0 END) AS FEB,
...
FROM JobHead h
INNER JOIN LaborDtl l ON h.JobNum=l.JobNum
WHERE JobCompletionDate>='20070101' AND JobCompletionDate <'20080101'
AND l.ClockInTime<>0
GROUP BYh.JobNum
,h.JobCompletionDate
The query shows, for each job, the month in which the job completed, and the number of hours it took to complete. I€™m calculating the number of days€™ duration by doing a datediff between the oldest and newest clockindates. I need to ignore adjustment transactions in the labordtl table €“ these rows are easily identified as they have clockintime values of 0. So far, so good. Now here€™s my problem.
There are some jobs which have only one €śreal€? labor transaction €“ this could happen if the job only took one day to complete. Other labor transactions may exist for that job, but let's say they are adjustments which we can ignore -- the date they were entered should not extend the duration of the job. In this situation, my datediff between the oldest valid transaction and the newest, returns 0. I don€™t have to count hours between clockintime and clockouttime. The rule is simply that if there is only one "real" labor transaction, I need to count this as a 1 day job.
I thought a nested CASE statement or expression might be the way to go but I didn't make any real progress.
Any ideas to solve this problem would be appreciated.
View 5 Replies
View Related
Apr 13, 2007
Hi!
Does anyone know how to query for the job duration of all jobs in a server?
Thanks!
View 6 Replies
View Related
May 20, 2006
I'm developing a web app that displays the running packages and the total elapsed time. I'm calling GetRunningPackages() method and using the ExecutionDuration property of the returned package. The duration seems to be only for the currently executing container and not the entire package. Is there a way to get the duration of the entire package? Thanks.
View 2 Replies
View Related
Nov 27, 2007
Hi all, I want to find working duration between two datetimes in c#.i'm using following code... DateTime starttime = Convert.ToDateTime(Session["StartTime"]); DateTime endtime = DateTime.Now; TimeSpan duration = endtime - starttime; DateTime period = new DateTime(duration.Ticks); i want to store this duration in database through stored procedure, i've give datetime datatype to duration but it is giving error in conversion of TimeSpan to DateTime..Please help... Thanks
View 1 Replies
View Related
Nov 29, 1999
SQL 6.5 - run duration 6-7 hours
SQL 7.0 - run duration 12-13 hours
175+ columns with total record size=570
4.2M records with tablesize 2.5G
It's a simple 'select into...' with some embedded logic from a work table with all char fields into the actual table converting char fields into various data types (int, datetime, real, etc.) Here is a sample of the code:
SELECT
LoanNum=CASE
WHEN ISNUMERIC(ACCT#)=1 THEN CONVERT(int,ACCT#)
ELSE NULL
END,
PaidToDt=CASE
WHEN PAIDDT = '0001-01-01' THEN NULL
WHEN ISDATE(PAIDDT)=1 AND SUBSTRING(PAIDDT,1,2) = '19' THEN CONVERT(smalldatetime,PAIDDT)
WHEN ISDATE(PAIDDT)=1 AND SUBSTRING(PAIDDT,1,2) = '20' AND SUBSTRING(PAIDDT,3,2) < '79' THEN CONVERT(smalldatetime,PAIDDT)
ELSE NULL
END,
.
.
.
INTO db.owner.tablename
FROM db.owner.wrktablename (NOLOCK)
View 1 Replies
View Related
Sep 15, 2004
Hearing complaints from users about speed on db server (I have almost no control on design) it just has to work. Ran profiler looking for all sql statements over 4000 millsec and in one hour returned over 715 tsql statements. Over 300 of these were over 10000 milliseconds. THis is on an 8 way Dell with 8 gig of RAM. Looking for opinions, how bad does this look compared to other servers you are taking care of? Cache hit ratio is at 99 % and system queue length still under 1, but this does not look good.
View 2 Replies
View Related
Feb 21, 2005
Hello, everyone:
There is a trigger to monitor the modification on a table, and it turn on. For a special duration, I need to turn off this trigger to modify the table. And then turn on the trigger again.
Any help will be appreciated.
Thanks
ZYT
View 2 Replies
View Related
Oct 14, 2005
I have a table called Tickets which contains ticket information for a machine. Each machine can have more than one ticket number opened at the same time. The ticket number contains start date/time and end date/time of the ticket. Thereefore the table looks something like this:
Ticket_No (int)
Machine_No (int)
Description (char)
Start_Time (datetime)
End_Time (datetime)
I want to be able to calculate total duration time(in hours) that EACH MACHINE had a ticket open...but here is the tricky part. The total duration time that a machine had ticket open has to encompas any tickets that may fall in the same time period. For example:
If Machine A has a ticket open at 8:30 and the ticket is closed at 10:00. Meanwhile, Machine A had another separate ticket open at 9:30 which was closed at 10:30. In this case, the total duration time for this machine would be from 8:30 to 10:30 for a total of 2 hrs duration time.
Can anyone help me get started in tackling this problem or provide any examples?
View 4 Replies
View Related
Nov 8, 2006
Is there anyway to tell how long this will run for -- or how far it has got? I have a large database that has just had most of the data removed. The command has been running for 8 hours and I have just stopped it to let something else run quickly. Any way of telling how much longer it will take?
View 7 Replies
View Related
Aug 6, 2013
In my example, i have a table as below:
Time|Machine
2013-08-05 10:12:00 |M1
2013-08-05 10:15:00 |M1
2013-08-05 10:20:00 |M1
2013-08-05 10:11:00 |M2
2013-08-05 10:15:00 |M2
2013-08-05 10:16:00 |M2
2013-08-05 10:17:00 |M2
2013-08-06 11:12:00 |M1
2013-08-05 11:42:00 |M1
2013-08-05 12:02:00 |M1
I want to have a report for every machine by time that will show how long each machine worked. The result is something like below:
M1|8 (minutes)
M2|6
M1|50
View 5 Replies
View Related
Nov 6, 2003
/*
This SP has 2 functions.
a) if @method='duration' gives the average run duration in minutes for successful jobs
b) if @method='failures' displays failures/cancels/still executing jobs
It defaults to today's date. Specify @xdate for a different date
-- Louis Nguyen
*/
CREATE PROCEDURE UtilityJobsHistory
(
@method varchar(100)='duration'
,@xdate datetime=null
)
AS
set nocount on
set transaction isolation level read uncommitted
if @method='duration' begin
select @xdate=isnull(@xdate,getdate())
/*run_duration is in HHMMSS format; drop SS*/
/*run_staus: 1 complete 2 retry*/
/*step_id: 0 is final job outcome*/
/*run_date: yyyymmdd format*/
/*today's performance*/
select a.name,minutes=avg((b.run_duration / 100)/100*60 + (b.run_duration / 100)%100)
into #today
from msdb..sysjobs as a
join msdb..sysjobhistory as b
on a.job_id=b.job_id
where run_status in ('1','2') and step_id=0 and run_date =convert(varchar,@xdate,112)
group by a.name
/*7 day average performance*/
/*populate #D with dates in yyyymmdd format*/
create table #D (run_date varchar(50))
declare @idate datetime set @idate=@xdate
while @idate>dateadd(day,-7,@xdate) begin
insert into #D
select run_date=convert(varchar,@idate,112)
select @idate=dateadd(day,-1,@idate)
end
/*Avg7Days*/
select a.name,minutes=avg((b.run_duration / 100)/100*60 + (b.run_duration / 100)%100)
into #avg7Days
from msdb..sysjobs as a
join msdb..sysjobhistory as b
on a.job_id=b.job_id
join #D as c
on b.run_date = c.run_date
where run_status in ('1','2') and step_id=0
group by a.name
/*output*/
select name=cast(a.name as varchar(35)),OneDayAvg=a.minutes,SevenDayAvg=b.minutes
from #today as a
join #avg7days as b
on a.name=b.name
order by a.name
return end
if @method='failures' begin
select @xdate=isnull(@xdate,getdate())
select status=case run_status when 0 then 'FAILED' when 3 then 'CANCELED' when 4 then 'EXECUTING' end
,name=cast(a.name as varchar(35)),step_name
,time=replace(convert(varchar,@xdate,107),' ','')+' '+right('0000'+cast(b.run_time/100 as varchar),4)
,b.message
from msdb..sysjobs as a
join msdb..sysjobhistory as b
on a.job_id=b.job_id
where run_status in ('0','3','4') and run_date=convert(varchar,@xdate,112)
order by run_status,a.name
return end
View 1 Replies
View Related
Dec 13, 2007
Hi guys, I am having difficulty calculating the time duration between receiving process to shipping process.
I have a table that consists of: Order#, Processes, Time_In, Time_Out.
Order# can be 1, 2, 3, 4, 5.
While at the same time Order# 1 can go through more than one process, i.e.: Receiving, VisualTest, MechanicalTest, ..., Shipping.
Every Order# does not necessarily goes through all processes, but surely they will go through receiving process and shipping process.
For each process we will have recorded time when the order# comes in and when it finishes with each process.
I need to calculate the length of time from Time_In from Receiving to Time_Out in Shipping.
I.E.:
Order# | Process | Time_In | Time_out
1 | Receiving | 2007-12-1 10:00:00.000 | 2007-12-1 10:10:00.000
1 | Incoming Q.A. | 2007-12-1 10:40:00.000 | 2007-12-1 11:42:00.000
1 | Visual Check | 2007-12-2 08:10:00.000 | 2007-12-2 11:00:00.000
1 | Shipping | 2007-12-2 11:20:00.000 | 2007-12-2 11:52:00.000
2 | xxxxx | xxxxx | xxxxx
2 | xxxxx | xxxxx | xxxxx
2 | xxxxx | xxxxx | xxxxx
Please help.
Thanks in advance.
View 2 Replies
View Related
Mar 19, 2008
Hi!
I'm using RDA (Remote Data Access) to pull 20 tables to my Pocket PC. It took quite a long time so I ran a trace to see what happened. Everything looks fine except for when it runs:
exec [mydb]..sp_primary_keys_rowset N'Person',NULL
The duration is: 18446744073!!!
A couple of more tables has this enomous duration others have about 5000 which seems more normal.
Any clues?
/Magnus
Jesus saves. But Gretzky slaps in the rebound.
View 3 Replies
View Related
Sep 8, 2006
i want to get the execution duration of the ssis package and insert into one table,so i used a variable--"duration" and specified it's expression is getdate(). I think that only i can get the start value of the varible and the finish value,then i can know the duration.but whether i can get these two values? or better way i should try?
thanks
View 3 Replies
View Related
Dec 13, 2007
Hi guys, I am having difficulty calculating the time duration between receiving process to shipping process.
I have a table that consists of: Order#, Processes, Time_In, Time_Out.
Order# can be 1, 2, 3, 4, 5.
While at the same time Order# 1 can go through more than one process, i.e.: Receiving, VisualTest, MechanicalTest, ..., Shipping.
Every Order# does not necessarily goes through all processes, but surely they will go through receiving process and shipping process.
For each process we will have recorded time when the order# comes in and when it finishes with each process.
I need to calculate the length of time from Time_In from Receiving to Time_Out in Shipping.
I.E.:
Order# | Process | Time_In | Time_out
1 | Receiving | 2007-12-1 10:00:00.000 | 2007-12-1 10:10:00.000
1 | Incoming Q.A. | 2007-12-1 10:40:00.000 | 2007-12-1 11:42:00.000
1 | Visual Check | 2007-12-2 08:10:00.000 | 2007-12-2 11:00:00.000
1 | Shipping | 2007-12-2 11:20:00.000 | 2007-12-2 11:52:00.000
2 | xxxxx | xxxxx | xxxxx
2 | xxxxx | xxxxx | xxxxx
2 | xxxxx | xxxxx | xxxxx
Please help.
Thanks in advance.
View 6 Replies
View Related
Jan 8, 2007
Please forgive the stupidity of this question - it should be something very easy and I'm just not seeing it.
I am trying to set the duration of the ExecutionLog table. Currently it is ~ 1 week, and I would like to up the lifetime of the records - say, to 1 year. I would think this is as easy as changing a .config file value, but am unable to find something for this. I found the entry for the log files, but nothing for the execution log.
In the past I have tinkered with the Execution History DTS package, which would need to be scheduled to run and pull over only the newest records - is there anything else besides this? (just let them sit in the table?)
Thanks in advance,
John
View 4 Replies
View Related
Mar 17, 2008
Hi, I want to store a time duration such as 1:30 (mm:ss), 1:00, or 1:23 in a SQL 2005 database. What is the best data field type for this data? DateTime or TimeStamp? Thanks
View 2 Replies
View Related