Report Builder - Format Chart Y Axis

Oct 27, 2005

Is changing the display format of the Y axis of a column chart supported in the Sept CTP or is it going to be supported in the official release?  For example I have built a report model with the numeric sales values set as 'C' for currency and have created a simple bar chart with year on the category axis and sales on the Y axis.  The problem is that the Y axis displays as a general number (10000000) and would like to display it as a currency ($10,000,000). I can't for the life of me figure out how to display the Y axis as currency in Report Builder.

View 2 Replies


ADVERTISEMENT

Reporting Services :: Report Builder Bubble Chart - Axis Title Disappears

Aug 20, 2015

I have a bubble chart created with Report Builder 3.0. I have the Y-axis series is along the left side of the chart. When all X values are positive, everything displays normally. However, if any X-axis values are negative, the whole graph shifts slightly leftward and the Y-axis title is no longer visible. It seems to be overwritten by the shifted graph or simply pushed into nondisplay area.

Is there something I can do to make the chart stay put?

View 3 Replies View Related

Format Numbers On Chart Y Axis

Jan 2, 2007

Hi!

How can I format number on chart's y axis? I wanto to show 1.000 instead of 1000.

Thank you!

View 1 Replies View Related

Reporting Services :: Range Bar Chart - X Axis Dates Label Format Need To Be Converted To Quarter

Sep 4, 2014

I have created range bar chart and I am not able to achieve the following tasks.

1. Change X-axis Label Format to Quarter:

I have x-axis with dates and y axis of project groups. I have changed x-axis interval type = month and interval=3.
   
Set the Maximum =  Max(ProjectEndDate) and Minimum = Min(ProjectStartDate).

Now my chart showing 3 months x-axis interval dates in mm/dd/yyyy format. I want to change this interval date format to Quarter. The problem is LabelsFormat property is not recognize  the "=Q or q or quarter" and also not accepting the expressions. How can I achieve this?

2. Placing series side by side when it is not overlapping

I want to place the same group series side by side only when the previous project end date is less than next project start date, otherwise place the next project to next row. How can I achieve this?

View 2 Replies View Related

Combination Chart With Time Axis In Report Services

Mar 17, 2008

Hi

please excuse my ignorance but if someone could point me in the right direction i would be grateful.

i have produce a chart with some data against date points on x axis. i have another date field which i want to combine with the orignal date axis is this possible .

ie



table

results planned date Acutual date
10 02/03/07 01/03/07
46 03/03/07 03/03/07
60 06/03/07 07/03/07

i want to combine the planned date and actual date as an x axis


thanks

View 3 Replies View Related

Chart Problem: Multiple Values To Y-axis For The The Same X-axis Value

Jan 14, 2007

I have a simple-column chart and in the x-axis I put the date values and in the y-axis the sale price values.

The chart works perfectly in the case when there is only one sale price for the same date. But, when the price changes during the same day, then there is problem. In the following example

x y

1/1/2007 6.25

2/1/2007 7

2/1/2007 4

3/1/2007 8

the chart will have three columns and in the date 2/1/2007 will display the min or max of the two values. What I need is to represent all the values i.e. the chart must have four columns , as much as the rows of the dataset

Is it possible?

View 1 Replies View Related

Chart In Report Builder

Jan 16, 2007

hi there

I am just designing a simple chart in Report Builder - but when trying to drag any field into the value field of the chart (it doesn't change colour and won't accept any field).

If I drag a field into the category or series the curser changes and on approaching the chart properties they seem to change colour.

Can someone help to what can be wrong?

thanks

Dianne

View 14 Replies View Related

Cumulative Totals In Chart : Report Builder

Jan 24, 2007

Hi,

I am trying to display a line chart with cumulative totals over period of 12 months in a fiscal year. I know this can be achieveable in report designer using "Running value function".

Any idea how to achieve the same in Report builder ?

thanks in advance.

Here is the data :

Month Count

July 2

Aug 3

Sept 2



Expected output should be

Month Count

July 2

Aug 5(July count + Aug.Count)

Sept 7(July count + Aug count + Sept Count)

Regards,

bala

View 1 Replies View Related

Running Totals In A Report Builder Column Chart

Mar 9, 2006

I've created a Report Builder Column chart with months as the x-axis
(category) and revenue as the y-axis (value). This correctly displays
the revenue for each month, but I'd like to display a running total of
the revenue for the year.

I'm currently displaying:
Jan $2
Feb $1
Mar $4


I want to display:
Jan $2
Feb $3
Mar $7


I know this is possibly using the RunningTotal formula in Reporting
Services, but I'd like to do this in Report Builder so the users can
change and create their own graphs with running totals. Is there a way to do this in Report Builder?

Thanks.

View 1 Replies View Related

Reporting Services :: Change Scale Of The Chart In Report Builder

Sep 11, 2015

I have an stacked chart with line with markers. The scale on the right side is the finished good which has a min qty of 383 while the highest is 52439. how can i set this scale that start from 0 to 300 and soon. right now under scale properties I set the max to 60000, the min is set to auto while in the interval properties i set this to 10000. How this line marker adjust the scale quantity (fisnished good).

View 2 Replies View Related

Chart X-axis Y-axis

Jan 17, 2007

I'm trying to convert an old chart to Reporting Services.
We have used the same dataset for years, it is very very simple. But it seems to me that Reporting Services can't deal with this simple dataset.

My question is: How can I get create a line chart using this dataset.

The data set consists of 1 row with 96 columns (a day divided into 96 sets of 15 minutes). Each column records how many events occurs within the 15 minutes. Along the x axis I would like to display a vertical line every 4 hours. The y axis should be numbered 0 to the highest value in the results.


I could not make this dataset any more simple than it is. But Reporting Services just chokes on this.

Here is a sample of the dataset :
1 2 0 4 5 6 7 8 9 10... 96

View 1 Replies View Related

Chart Axis

Oct 17, 2007

I created a graph which retrieves value from database.And currently,my axis is in ranged 0-10.But i have a doubt that my value in will exceed my maximum y-axis value 10..My question is, could it be possible that i make my y-axis dynamic??Thanks!!

View 5 Replies View Related

Reporting Services :: Date Format In Report Builder When Using UTC Server

Oct 14, 2015

I am building reports based on Report Builder and SQL server 2014.

Our report data are hosted on azure sql database.

Date time on azure are stored as UTC.

When I run my report locally, how can I format correctly the date/time format on my report in order that if I am in French, I should have the date/time set to UTC + French offset. How can I do this ?

View 3 Replies View Related

Multiple Value On Y Axis In Chart?

Sep 5, 2007

Friends, I would like to put employee name and type of leave on the y-axis and on the x-axis the date, so that users can select the date start and end and employee/employees and see the chart or leaves.
But how to do that?
My fields are: Name, LeaveDescription and Date.
The data with me is for each employee, for each date, leave codes are there.

View 4 Replies View Related

Chart Axis, How To Add A Prefix To A Label ?

Jun 5, 2008

I'm just getting into creating charts and one I'm working on could realy do with a prefix on its axis label, the symbol '£'.

I honestly have no idea how to do this and what syntax to use, can anyone help ?.

Also as the label could do with having a thousands seperator as well but as you can tell I'd have no idea how to do this either.

Thanks.

View 1 Replies View Related

Chart-simple Line X-axis

May 29, 2007

How is it possible to have the values on the chart x-axis to be shown vertically rather than horizantal?
Thanks

View 3 Replies View Related

Chart Properties - Date On X Axis

Nov 27, 2007



Hi!
In SSRS2005 I made an chart,
but on x-axis I only want date-part (if possible ISO-format yyyy-mm-dd).

The resulting chart shows date AND time-part. How to avoid this?

thanks.

View 5 Replies View Related

Chart Y-axis Intervals Not Using Formula?

Jul 17, 2007

i put the formula day(Parameters!Parameter1.Value) into my y-axis's major gridlines interval value, and it doesn't obey the value i put in.

is this a bug or another "feature"?



when i just type in "31" is works as expected.



is there a work around for this?

View 4 Replies View Related

Only Dates In X-Axis Of Chart --Urgent

Sep 30, 2007



Hi

I have a report where i am using line chart with date column for grouping.
For X axis i have choosen the "NUmeric or Timescale Values". In the Chart the dates are displayed in this format 1/1/2007 12:00:00 AM . I don't want Time part to be shown

If possible i want it to be shown as 1-Jan. The Chart should display Point even when there is no record returned from the query.

Say DATE Column

Date AMOUNT
1/1/2007 12:00:00 AM 10
1/3/2007 12:00:00 AM 20
1/4/2007 12:00:00 AM 30

Now the Chart should plot from 1/1/2007 to 1/4/2007 including 1/2/2007

Any help on this will be appreciated

Thanks
Smitha

View 1 Replies View Related

Pivot Chart Value Axis Scaling Question

Jul 23, 2005

I have a pivot chart that displays 3 data series.Series 1 values range from 17 to 106.Series 2 values range from 1 to 18.Series 3 values range from 0 to 1.When I display all three series on the chart, the value axis labels run from1 to 120 with major unit lines at intervals of 20.When I remove Series 1, the chart automatically adjusts itself and thevalue axis labels run from 1 to 20 with lines at intervals of 2, thusnicely accommodating the value ranges of Series 1 and Series 2.All this is fine. But when I remove Series 2, leaving only Series 3,the labels run from 1 to 1.2 with interval spacing of .2. Since thesevalues are counts, it makes little sense to show decimal values.Can anyone provide advice on how to keep these axis labels fromshowing decimal values, if a user removes Series 1 and Series 2?Thanks.- Bob

View 2 Replies View Related

Foramtting Chart Axis Colour Using Expression

Sep 8, 2006

I have a chart on a report that shows value in £ on the Y Axis. The values can be both positive and negative. I would like to have the negative labels to show in red and the positive in black. What is the expression syntax to achieve this? i know it will be an IIF statement, but what is the syntax to show the Y Axis label as <0?



eg if i was doing this for a field it would be iif(Field!Fieldname.value <0, "RED","BLACK") but what would i replace the FIELD!Fieldname.vaue with so the expression would change the Y Axis label.


Thanks in advance for any help



Dave Munro

View 1 Replies View Related

Chart X-axis - Define HH:MM For A Group Category?

Oct 8, 2007

I have a chart that I am grouping data by Year, Month, day then Hour (this is to view server performance data) - however i need the label for the hour grouping to be in the format of HH:MM and not H:M by using expression



=HOUR(Fields!Timestamp_perfmon.Value) &":"&MINUTE(Fields!Timestamp_perfmon.Value)



...but this as you would kind of expect returns 0-23:0-5 ie 18:1 whereas i need it to return 18:12 or 8:12 PM..



when i change the format code for the x-axis it unfortunatey screws up all my other group by values and labels..



can anyone help? Please....

View 2 Replies View Related

Reporting Services - Chart X-axis - Define HH:MM For A Group Category?

Oct 5, 2007



I have a chart that I am grouping data by Year, Month, day then Hour (this is to view server performance data) - however i need the label for the hour grouping to be in the format of HH:MM and not H:M by using expression

=HOUR(Fields!Timestamp_perfmon.Value) &":"&MINUTE(Fields!Timestamp_perfmon.Value)

...but this as you would kind of expect returns 0-23:0-5 ie 18:1 whereas i need it to return 18:12 or 8:12 PM..

when i change the format code for the x-axis it unfortunatey screws up all my other group by values and labels..

can anyone help?

View 2 Replies View Related

Colouring The Chart Plot Area Based On X-axis Scale

May 3, 2007



Hi,



I have a report based on a line chart.

The values on X-axis are scaled from -100 to +100. I want to colour the band from -100 to 0 with red colour and that from 0 to +100 in green colour, and i want to provide legend for these bands/sections. How can i do this?

A prompt response would be really appreciated



Thanks a lot!!



Simranjeev

View 1 Replies View Related

Reporting Services :: Date Labels On X Axis In SSRS Line Chart

Jul 27, 2015

What is the best optimised options to display the date labels with bi-weekly intervals starting date Date from one month to three months future from the current date?

As per above requirements, I have built the below line graph query and graph, currently it only displays the date labels as per data but I need to display date labels with bi-weekly intervals starting date from one month to three months future from the current date. Also another issue found, if there are few more date labels then does not show all labels on horizontal axis.

Select
/* Set Week End date as Sunday */
DATEADD(DAY, 7 - DATEPART(WEEKDAY, t.TaskBaseline0FinishDate), CAST(t.TaskBaseline0FinishDate
+1 AS DATE)) as[WeekEnd]
,count(t.TaskBaseline0FinishDate) as Baseline
,count(t.TaskFinishDate) as Finish

[Code] .....

View 3 Replies View Related

Reporting Services :: How To Show The Chart Data In Y Axis In SSRS 2008R2

May 22, 2015

I have requirement where i want to show my chart report data in Y axis...it is possible in SSRS 2008R2? or it is possible only in SSRS 2012 only?

View 7 Replies View Related

Creating Line Chart Expession Based Y-Axis Scale Values

Feb 28, 2008



Hello,
I need to know what means are available to change the Minimum and Maximum Y-Axis scale values rather than leave them simply as they are in the properties.
Right now whatever min/max values I enter into the scale for the Y-Axis are unchangeable.
I need to be able to change the min/max scale values based on the value of the data at run time.

Any help is appreciated.

Thanks.

View 6 Replies View Related

Report Builder: How Can I Append Two Table Fields To Report In Report Builder

Feb 6, 2008


Hi,



When i select datasource in Report Builder, i am able to see all the available DataSources.

Eg: I have selected one datasource from the list and which has 3 tables(table1, table2, table3) associated to that datasource.



when i drag and drop table1 fields to report, i am not able to see the other 2 tables(table2 & table3)

Is there any property or relationship do i need to maintain?



Thanks,
SR.

View 5 Replies View Related

Format Y Axis Label As Percentage

Aug 6, 2007

I have entered the code as P0 when formatting my Y axis to show 0% to 100%. This showed me percent values as 0% to 10,000%. Then after reading the forums I put the major gridline interval as 0.2 to get jumps of 20% but this just puts a lot of lines on the chart as 0,0.2,0.4 till 10,000%.

How can i fix this one ..

Thanks
Kiran

View 14 Replies View Related

Reporting Services Report / Chart / Dynamically Hide-Unhide DataFields In A Chart

Mar 26, 2007



Hello All,

I have a reporting services report in the form of a chart. I have two datafields on the chart.

I need to be able to dynamically hide one datafield and view the chart for the other one and vice versa.

How do I do this ?

Any help would be appreciated..

Thanks!



View 4 Replies View Related

Reporting Services :: Export Server Report Chart To Excel As Editable Chart

Jul 17, 2014

When I export the report in excel format the chart is displayed as picture. I want it to be displayed as editable chart.Does Office Writer work in this situation and did anyone use Office Writer to accomplish same type of problem.Is there any other method or product we can use instead of the office writer.

View 2 Replies View Related

Question (X-axis): How Does Automatic X-axis Label Positioning Work?

Jul 19, 2007

All,

I have read through the following:

http://technet.microsoft.com/en-us/library/aa964128.aspx.

The relevant section of this document is :-

Question (X-axis): How does automatic x-axis label positioning work?
Answer: Currently, built-in Reporting Services charts only allow automatic positioning in order to avoid overlapping the x-axis labels. The label direction (horizontal/vertical) of the axis labels depends on the label string sizes and the available space. X-axis labels are either shown horizontally in one line, horizontally in multiple lines with line breaks, or vertically. Showing x-axis labels at an angle, or explicit manual control over individual x-axis label positions is currently not supported.

Note There are several third-party chart add-ins that enable more control over axis labels. These add-ins can be installed on top of Reporting Services 2005.

I have exactly the problem indicated above in that some sectors of my Pie Charts I am are trying to produce are small and are close together thus labels overlap in some cases. As it says above, only automatic placing of the labels is available, but there could be a solution through third party software.

Does anyone know of a 3rd party solution/add in or a workaround?

Thanks
Msuk

View 3 Replies View Related

Multiple Y-Axis Values In Report

Oct 23, 2006

I will try to explain this best I can. I have a report where it shows total number of pieces over time. This range is from 0 to like 100 pieces. I have done a UNION query to add average accumulation (in inches).

If adding average accumulation to the "Data fields" section of the report in report designer, It shows the average accumulation on the bottom in releation to the number of pieces. (which is what I want.. But.. ) The numbers are not proportional obviously there wont be 60 inches of snow.. more like 1 or two inches.. So the line is very close to the bottom almost invisible..

Now that ive dont a muck up job of explaining.. This is what im looking for.. Some type of chart that will overlay the average accumulation but somehow be smart enough to show the different scale of precipitation vs pieces of equipment.

 

VS 2003 SQL Server 2000

View 8 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved