I got a problem with my project on reporting services. I installed MS SQL Server 2014 (86x version), Report Builder 3.0 (for creating my reports) and Data Tools for my SQL Server.Now I created a report via Report Builder 3.0 with a SAP NetWeaver as a data source. I could create and view it in Report Builder 3.0.
But when I want to view it on my Report Server it doesn't work. I only get this error."An error has occurred during reporting processing. (Processing Aborted) An attempt has been made to use a data extension 'SAPBW' that is either not registered for this report server or is not supported in this edition of Reporting Services. (rsDataExtensionNotFound)" ...
I found on the internet a few solutions. I installed the Data Tools for the 86x version of the SQL Server. Didn't work. And when I want to change some coding in "RSReportDesigner.config" it says that I'm not allowed to save the changes in this directory.
I have a cube that we are processing nightly via an Analysis Service Processing Task in SSIS. In order to increase the performance of the processing time, we elected to use a lot of rigid dimension attributes, and do a full process of everything in the SSIS task. The issue that I am having is that after that task completes, I need to go into Visual Studio to deploy the cube becuase we are unable to browse or use the cube. This issue seemed to start once we changed the SSIS Analysis Service Processing Task to do a full process on the dimensions, rather than an incremental.
I would expect that once development is done, and it is processed and deployed, that is it. My thinking is that the SSIS task should just update the already deployed cube,
We have set up an IS package to process an AS 2005 database (comprising cube & dimensions, etc) daily, via a SQL Server Agent job on both development and production systems. This has been working fine for months.
A new dimension was added to the cube on the development system - automatic processing via the IS package continued without issue. However, when the new dimension was added to the production system the IS package no longer processes the cube correctly. Although all appears ok (and all is present and correct in the logs), no data updates to the cube are made. Only when the cube is manually processed does the cube get updated.
Anyone got any ideas about how to get around this issue? We have created a new IS package, with a single Analysis Services Processing Task, and tried this but get the same outcome.
Hello,Can I import an OLTP (Reltional DB) as a Data Source into SQL ServerAnalysis Services 2005 and then use the Cube Wizard and the new DataSource View feature to create the OLAP model ?Or do I have to first design an OLAP Data Warehouse with a Star Schemaand then import this DW as a Data Source into my Analysis ServicesProject.With SQL Server 2000 , OLAP would be the way to go..but with SQLServer 2005 , it seems as though the wizard and data source viewfeatures do half the work for you.I have an OLTP DB and am not sure which route I should take ! Anysuggestions / input would be much appreciated.Thanks in Advance...RegardsRusszee
I am using Custom Data Processing Extension to call a stored procedure. Iam getting following error when creating a dataset in report designer using the extension. I wrote the code in c#.
could not update a list of fields for the query. verify that you can connect to the data source and that your query syntax is correct.(Details-Object reference not set to an instance of an object.)
Here is my code
using System; using System.Collections.Generic; using System.Text; using System.IO; using System.Data;
We have an Integration services package that executes a few TSQL tasks, then processes an Analsys Services database. This has been in production for about three weeks now and twice the package has failed with this error from the event log:
Event Type: Error
Event Source: MSSQLServerOLAPService
Event Category: (289)
Event ID: 3
Date: 7/11/2007
Time: 1:48:59 AM
User: N/A
Computer:
Description:
OLE DB error: OLE DB or ODBC error: An error has occurred while establishing a connection to the server.
When connecting to SQL Server 2005, this failure may be caused by the fact that under the default settings SQL Server
does not allow remote connections.; 08001;
Communication link failure; 08S01;
TCP Provider: An existing connection was forcibly closed by the remote host.
; 08S01.
For more information, see Help and Support Center at http://go.microsoft.com/fwlink/events.asp.
I don't think that this error is accurate because the package and Analysis Services are on the same server.
Also, this does not happen in our development environment. Any help is appreciated.
I try to generate ad hoc reporting model for analysis services cube in reporting services. in Management Studio I connected to reporting services, defined a data source to the analysis services database. But If i try to generate model i get the error: "While connection with a data source a mistake has appeared, or the query is invalid for the data source. (rsCannotPrepareQuery)(Report Services SOAP Proxy Source)"
I have an Analysis Services Processing Task in my SSIS package. I run the SSIS package using SQL Server job, the running of the package is a job step.
When I process manually the analysis services objects (in practise cubes) using dtexec utility I get a lot of log. In case the processing fails I get error messages that quite well describe the error. But when I run the job the only information I get in the job log is that the job step failed. I know the failure happens in the Analysis Services Processing Task.
Is there any way in SSIS to get a) the log of the Analysis Services processing or b) the error messages of the Analysis Services processing? Or should the processing be done some other way than I've been doing?
Hello, I have a problem when trying to fully process an SSAS database using Integration Services "Analysis Services Processing Task" task. I have 2 of these tasks which are responsible for processing the Dimensions then the Cubes. When I run the package either via the BIDS environment or on the local server from the Integration Services engine, I will get an error after about 20 minutes stating:
"Error: Memory Error: Allocation failure. Not enough storage is available to process this command""Error: Errors in the metadata manager. An error occurred when loading the <cube name> cube from the file \?D:Program FilesMicrosoft SQL ServerMSSQL.2OLAPDataMyWarehouse<cube file>.xml"
The cube name is not specific, it will fail and any of my cubes could be in the error log
If I fully process the AS database using the AS engine (logon to local AS server, right-click AS database and click Process), I get no errors at all, it processes and completes fine. The processing options are identical when I run in AS or via the SSIS "Analysis Services Processing Task" task.
I've searched quite a lot online but no joy, the information I have gleaned from various sites does not directly link SSIS with SSAS processing problems.
When either the AS processing starts via SSAS or SSIS the memory usage of MSMDSRV.exe increases to around 1.4 / 1.5 GB but never goes to 2GB ever, even when the error appears.
I've done the following with no effect.
" Have run via AS and works fine " No specific cube it fails on " Have created a Dimension only package, same problem " Changed the maxmemorylimit " Changed the connections to localhost " Memory DOES NOT max out on server
Server Specs: Windows Server 2003 Standard + Service Pack 2 4GM ram, 2GB paging file
I've got this error coming up while running the sql job for AS processing. I can't find anything about it on google or anywhere else. Has anyone had issues like this?
Code Snippet Executed as user: xyzsvc_sqlsvr. Microsoft (R) SQL Server Execute Package Utility Version 9.00.3042.00 for 32-bit Copyright (C) Microsoft Corp 1984-2005. All rights reserved. Started: 1:21:02 PM Error: 2008-04-04 13:21:07.41 Code: 0xC1000000 Source: Analysis Services Processing Task Analysis Services Execute DDL Task Description: Internal error: An unexpected error occurred (file 'mdprocessdim.cpp', line 3429, function 'MDProcessPropertyJob::OnLaunch'). End Error DTExec: The package execution returned DTSER_FAILURE (1). Started: 1:21:02 PM Finished: 1:21:07 PM Elapsed: 5.141 seconds. The package execution failed. The step failed.
I think I've seen a similar post on a blog or on the forums - but it seems like this should be possible -
I have an MDX query - that works fine in SQL Enterprise Manager, and has my dimension members on columns, and my measures on the rows. When I try the same query in Reporting Services, I get the error:
"The query cannot be prepared: The query must have at least one axis. The first axis of the query should not have multiple hierarchies, nor should it reference any dimension other than the Measures dimension.. Parameter name: mdx (MDXQueryGenerator)"
Although it works when you pivot the view, I really need my data presented with the members on the columns and the measures on the rows. Another forum post mentioned using the SQL 9.0 driver, but I can't see this listed anywhere (the only one I see is the .NET framework Data Provider for Microsoft Analysis Services).
Here's what my query looks like -
SELECT { [Time].[Month].&[2006-09-01T00:00:00] , [Time].[Month].&[2006-10-01T00:00:00], [Time].[Month].&[2006-11-01T00:00:00], [Time].[Month].&[2006-12-01T00:00:00] } on COLUMNS, { [Measures].[Unique Users], [Measures].[UU Pct 1], [Measures].[UU Pct 2], } ON ROWS FROM [Cube]
Hi. I have an Analaysis Services (2005) cube with four dimensions and one fact table (with three partitions - 2006,2007,2008) for which I need to create an SSIS package to process. I only want to process one of the three partitions (2008) - the previous two years should remain unchanged.
This is what I have currently in the Analysis Services Processing Task under Processing configuration: - An object for each of the dimensions with "Process Full." - An object for the 2008 partition with "Process Full."
(Note - Under Process Options, I see only Process Default, Process Full, Unprocess, and Process Data for dimensions and partitions).
Batch settings are: - Processing order: Sequential - Transaction mode: All in one transaction - Dimension errors: Ignore errors - Process affected objects: Do not process
When I execute the package, the cube loses the 2006 and 2007 data.
I am assuming that I have an issue with the Process Option or the Batch Settings, and I would appreciate any guidance!
The last node of my workflow in SSIS is an analysis Services Processing Task, which is supposed to fully reprocess a cube, defined in a different project.
In the configuration, I found the correct cube and setups for it, I thought I wasn't gonna have any problems with it, but it started to complain about user and password information. I thought since the databases configured itself when I added them, the same thing would happen with this Task.
I do have my own user and pass which has permissions to reprocess the cube, although I thought windows authentication would be better then setting up a user and password for the application/task.
I looked in the entire configuration pane and found no information regarding username and password. Where should I set it up, my SSIS solution or the Cube's solution?
This might be a newbie question, I'm not quite sure...
EDIT: Here is the error message: [Analysis Services Execute DDL Task] Error: The following system error occurred: Logon failure: unknown user name or bad password. .
I am trying to run Olap Cube 2000 inside SSIS project. I am using "Analysis Services Processing Task" Object. The Visual Studio Project is sitting on the machine where the analysis 2000 is running but yet i get an error while establish a connection to the Analysis server.
On that machine also install MICROSOFT SQL SERVER 2005 .
the error is: A Connection Cannot be made . Ensure that the server is running.
Does Anybody have an idea to why i get this Error.
I'm trying to create reports in RS2005 using AS2000 as my data source. I understand that if I use RS2005 on AS2000, I wont be able to enjoy the OLAP based parameters as in using AS2005. Does anyone know an easy way to easily use Parameters in RS2005 while still using AS2000?
Hi, I'm trying to learn about analysis, integration and reporting services. I have install SQL server 2005 management Studio Express. but I cant find these in the Start menu as mentioned in the tutorial Click Start > SQL Server 2005 > Business Intelligence Development Studio.(for reporting services). what do I need to do? Please help me.
I'm making my first attempt at creating a cube using Analysis Services based on my exisiting datamart. Datasource, views, and dimensions have been defined. But comes deploying the cube, it's giving the error saying "A connection cannot be made. Ensure that the server is running." The Deploy Target server and database are the same where my datamart is. Or, maybe I don't know what I'm doing.
Would appreciate any suggestion for my enlightenment. Thanks
I have a (hopefully typical) problem when it comes to cube design. Westore millions of product records every year, broken down bymonth/quarter. Each product can be assigned to various heirarchialclassification groups etc. The data in an OLTP DB occupies roughly100G for a typical year.We're looking at breaking this out into OLAP to provide faster accessto the data in various configurations and groupings. This is not aproblem, as this is the intended use for Analysis Services.The problem is that we apply projection factors on the product pricesand quantities. This would be ok if it only happened once, however,this happens every quarter (don't ask why). The projection factorschange 4 times a year, and they affect all historical product records.This presents a challenge because to aggregate the data into a usefulconfiguration in the cubes, you throw out the detail data, but thismeans throwing out the price and quantities which are needed to applythe projection.So if you have Product A at $10 and Product B at $20, and roll both upinto Category X, you'll have $30, but you'll lose the ability to applya projection factor of .5 to Product A and .78 to Product B. They'rerolled up.I don't want to regenerate the cubes every 3 months. That's absurd.But we can't live without the ability of projection theprices/quantities on a product level (detail level). So how can thisbe achieved when the other cubes are created at a higher level withless details and sums of the detail data?My initial guess is that we have to update the product data, and thenreaggregate all the other data that is built upon that product data.Is there any other way to apply math to the data on the way out?Thanks in advance!Regards,Zach
I recently installed SQL Server 2005 Enterprise on a machine running Server 2003. I have successfully configured Reporting Services (see below for summary of settings) - Used the defaults for the Repor tServer and Report Manager Virtual Directories - Windows Service Identity set to domain user. The domain user is part of the administrator group on the machine and has sysadmin rights to the database - Web Service Identity set to NT AuthorityNetworkService
When I open http://localhost/reports/, I get the following error:
I have check a bunch of forums, but have no success. Any advise would be greatly appreciated!!
Server Error in '/Reports' Application.
Compilation Error Description: An error occurred during the compilation of a resource required to service this request. Please review the following specific error details and modify your source code appropriately.
Compiler Error Message: CS0016: Could not write to output file 'c:WINDOWSMicrosoft.NETFrameworkv2.0.50727Temporary ASP.NET Files eports2cbaf422c4330628App_global.asax.th5hkjqv.dll' -- 'The directory name is invalid. '
Source Error:
[No relevant source lines] Source File: Line: 0
Show Detailed Compiler Output:
c:windowssystem32inetsrv> "C:WINDOWSMicrosoft.NETFrameworkv2.0.50727csc.exe" /t:library /utf8output /R:"C:WINDOWSassemblyGAC_32System.Web2.0.0.0__b03f5f7f11d50a3aSystem.Web.dll" /R:"C:WINDOWSMicrosoft.NETFrameworkv2.0.50727Temporary ASP.NET Files eports2cbaf422c4330628assemblydl3a890e9c0 068591f_f54cc701ReportingServicesFileShareDeliveryProvider.DLL" /R:"C:WINDOWSassemblyGAC_MSILSystem.Web.Mobile2.0.0.0__b03f5f7f11d50a3aSystem.Web.Mobile.dll" /R:"C:WINDOWSassemblyGAC_32System.Data2.0.0.0__b77a5c561934e089System.Data.dll" /R:"C:WINDOWSassemblyGAC_MSILSystem.Web.Services2.0.0.0__b03f5f7f11d50a3aSystem.Web.Services.dll" /R:"C:WINDOWSassemblyGAC_MSILSystem.Configuration2.0.0.0__b03f5f7f11d50a3aSystem.Configuration.dll" /R:"C:WINDOWSassemblyGAC_32System.EnterpriseServices2.0.0.0__b03f5f7f11d50a3aSystem.EnterpriseServices.dll" /R:"C:WINDOWSassemblyGAC_MSILSystem.IdentityModel3.0.0.0__b77a5c561934e089System.IdentityModel.dll" /R:"C:WINDOWSassemblyGAC_MSILSystem.ServiceModel3.0.0.0__b77a5c561934e089System.ServiceModel.dll" /R:"C:WINDOWSassemblyGAC_MSILSystem2.0.0.0__b77a5c561934e089System.dll" /R:"C:WINDOWSMicrosoft.NETFrameworkv2.0.50727Temporary ASP.NET Files eports2cbaf422c4330628assemblydl34a099978 068591f_f54cc701ReportingServicesEmailDeliveryProvider.DLL" /R:"C:WINDOWSMicrosoft.NETFrameworkv2.0.50727mscorlib.dll" /R:"C:WINDOWSMicrosoft.NETFrameworkv2.0.50727Temporary ASP.NET Files eports2cbaf422c4330628assemblydl3de5a2332 0958a20_f54cc701ReportingServicesWebUserInterface.DLL" /R:"C:WINDOWSassemblyGAC_MSILSystem.Xml2.0.0.0__b77a5c561934e089System.Xml.dll" /R:"C:WINDOWSMicrosoft.NETFrameworkv2.0.50727Temporary ASP.NET Files eports2cbaf422c4330628assemblydl3498aee86 042473c_93d0c501ReportingServicesCDOInterop.DLL" /R:"C:WINDOWSassemblyGAC_MSILSystem.Runtime.Serialization3.0.0.0__b77a5c561934e089System.Runtime.Serialization.dll" /R:"C:WINDOWSassemblyGAC_MSILSystem.Drawing2.0.0.0__b03f5f7f11d50a3aSystem.Drawing.dll" /R:"C:WINDOWSMicrosoft.NETFrameworkv2.0.50727Temporary ASP.NET Files eports2cbaf422c4330628assemblydl3cd47089b 0f2a80e_f54cc701Microsoft.ReportingServices.Interfaces.DLL" /R:"C:WINDOWSMicrosoft.NETFrameworkv2.0.50727Temporary ASP.NET Files eports2cbaf422c4330628assemblydl3f180608d 0083daf_b16dc701Microsoft.ReportingServices.Diagnostics.DLL" /R:"C:WINDOWSMicrosoft.NETFrameworkv2.0.50727Temporary ASP.NET Files eports2cbaf422c4330628assemblydl323449648 068591f_f54cc701ReportingServicesNativeClient.DLL" /out:"C:WINDOWSMicrosoft.NETFrameworkv2.0.50727Temporary ASP.NET Files eports2cbaf422c4330628App_global.asax.th5hkjqv.dll" /debug- /optimize+ /w:4 /nowarn:1659;1699;1701 "C:WINDOWSMicrosoft.NETFrameworkv2.0.50727Temporary ASP.NET Files eports2cbaf422c4330628App_global.asax.th5hkjqv.0.cs" "C:WINDOWSMicrosoft.NETFrameworkv2.0.50727Temporary ASP.NET Files eports2cbaf422c4330628App_global.asax.th5hkjqv.1.cs"
Microsoft (R) Visual C# 2005 Compiler version 8.00.50727.1433 for Microsoft (R) Windows (R) 2005 Framework version 2.0.50727 Copyright (C) Microsoft Corporation 2001-2005. All rights reserved.
error CS0016: Could not write to output file 'c:WINDOWSMicrosoft.NETFrameworkv2.0.50727Temporary ASP.NET Files eports2cbaf422c4330628App_global.asax.th5hkjqv.dll' -- 'The directory name is invalid. '
Version Information: Microsoft .NET Framework Version:2.0.50727.1433; ASP.NET Version:2.0.50727.1433
I 'm using 'Analysis Services Processing Task' as part of a SSIS package to refresh the cube. in the property page,
the 'loggingMode' is set 'enabled', but there is no records in the sysdtslog90 table while all other tasks are logged in the table. How to logging into the sysdtslog90 table?
I have deployed Lync 2013 and monitoring which all went through fine. However just one of the monitoring reports (conference join time) shows no data even though there is data within SQL All other reports are fine and all datainformation is displayed. I've tired to publish the reports again but this has not made any difference.
i have a small problem with the data sources in the reporting services, maybe you can clarify the situation... I have a MS CRM 3 solution with the reporting services 2005 installed. From an other vendor we have a arcplan solution on the 2000 analysis services. I would like to get access from the 2005 reporting services to the 2000 cube. Is this possible? Ive read that the SSMS cant connect to the 2000 cubes. Can i connect from the reporting services??
If there are any AS gurus out there, I could use some help. I've been having some problems with particular AS dimension and cubes and it's driving me crazy! It doesn't matter what I do, nothing seems to work.
Anyway, here's what I'm trying to do. I've got a fairly simple dimension. There is a date stored in the dimension that is formatted as an int. The dimension needs to only display AGE, so I cast the int as a date and do a datediff to get AGE. The dimension builds just fine and I get the results I want. My problem is when I add the dimension to the cube. The cube fails to build and I get an error message - "Data source provider error: The column prefix 'MY TABLE' does not match with a table name or alias used in the query." Basically, AS is telling me that the table that is used for the dimension doesn't exist, even though the fact and the dimension are joined properly and I've validated the structure.
I've run a number of queries in QA on the two tables and everything works fine. No funky data issues. I've run the service packs a few times, but that didn't work either. I've tried making a cube that only has the just fact table and the one dimension table, and it still fails.
Basically, I'm out of ideas. Any help that anyone has is greatly appreciated.
How do I connect to an Analysis Services 2000 cube while in Integration Services? My idea is to execute an MDX query from within a package, and then stage the data to a SS 2005 table for a RS report to query.
I have an olap database "A" and SSIS package "P" which process all the dimensions and cubes in "A" olap database.
I created "A1" olap database copy of "A" and made copy of "P" SSIS package as "P1" I opened "P1" SSIS package and updated olap connection properties "Initial Catalog = A1". A1 is my new olap database.
When I run package "P1" guess what? it processed "A" olap database's cubes and dimensions. Try it, not in production because I did it in production.
I have a report created using MS SQL Server 2005 reporting services and deployed to the report server. I added a subscription for the report to be scheduled to run and emailed to someone on a regular basis. But now we want the report emailed ONLY when there is data returned. If no data is returned after the report runs then don't email it. Does anyone know how to do that?