Reporting On A Cube -- Time Dimension Issue

Feb 28, 2007

Hello,

I have an Analysis Services Cube that I would like to report on. However, the Time Dimension currently only has four columns, Day of Month, Month(name) , Year, and DateKey (DateTime representation at midnight for every day). Thus when I drag the month attribute onto the report, it is sorted April - August - December - etc. instead of Jan - Feb - Mar. How do I fix this? I remember reading something in the MSDN Library about it but I can't find it again now.

Thomas

View 5 Replies


ADVERTISEMENT

The Time Dimension Is Growing Much After Every Process Of Cube

Apr 11, 2008

Hi guys,

I made a cube with time dimension with hieracly year/month/date/hour
the problem is that dimension is growin to fast. In older version of MSSQL (2000) the same dimension doesn't grew so much.
Any ideas? The table is big (may be around 1 500 000 rows per month) now it contains around 4 500 000 rows.

View 19 Replies View Related

Data Mining Against A Cube With Time Dimension

Nov 21, 2006

We have a set of cubes and dimensions, and we're experimenting with data mining against the cubes (primarily for forecasting applications). We have a custom time dimension (which we call calendar), not generated by the BIStudio wizard. The dimension has year/month/day/hour/... attributes. But when I try to add this Calendar dimension to the mining structure as a nested table using BI studio, it only shows the Year attribute, not the others. Other dimensions seem to show all the attributes.

Is there something we've done wrong in defining our time dimension? What determines which attributes show up as available for selection in BI studio?

View 5 Replies View Related

Changing Cube Dimension Filter Via Reporting Services

Apr 27, 2007

Hi all

sorry im new with using Reporting Services and even more inexperienced with using cubes.

My situation is as follows. I perform dynamic grouping (user selects the view via a parameter) Depending on the view selected, I need to change the dimension filter in the dataset.. Is this possible ?


Regards,
Neil

View 5 Replies View Related

Analysis :: Add Dimension To Cube Dimension Without Any Relation In Dimension Usage

Oct 26, 2015

When i add a dimension to the cube dimension without any relation in my dimension usage to any measure group my units are going down.However when i remove the dimension from the cube am getting the correct values.

View 4 Replies View Related

Filtering Out 1 Time Dimension Based On The Selection In Another Time Dimension

May 19, 2008

Hi!

Need some help building a query that does the following :

I have 2 Time Dimensions ; Time (Transdate) and ClosedDate (ClosedDate)

In my report/query, if [Time].CurrentMember = [Time].[YMD].[YMD].[2006].[200610].[20061031] I want to FILTER out all ClosedDate < [ClosedDate].[YMD].[YMD].[2006].[200610].[20061031]

Both Time Dimensions are Year -> Month -> Day and have the same Members.

I have every option available, using calculated Members and/or Measures to do this.

The report I'm creating is Aging of Receivables : Balance / 30 days / 60 days / etc.. But for the Aging, I need to filter like explained above.

Appreciate all help!

Regards,
Stian Bakke

View 3 Replies View Related

Power Pivot :: Aggregating Time Periods In Cube-member / Cube-value Formulas?

Aug 23, 2015

I am just starting out using CUBEMEMBER/CUBEVALUE formulas in excel linked into a sql olap db - using this method for some custom reports where pivot tables are not suitable.
The time dimension values include Months, Quarters and Years and the CUBEMEMBER formulas like

=CUBEMEMBER("OLAPCUBE","[Time].[Time].[Year].&[2015].&[1].&[1]") work fine - 1st quarter 1st month etc.

Is there a straightforward notation to aggregate months or do I need to use a plus sign to add a number of CUBEMEMBER formulas together.In other words - Is there an easier way of for say jan to july 2015 totals than

=CUBEMEMBER("OLAPCUBE","[Time].[Time].[Year].&[2015].&[1]") + (CUBEMEMBER("OLAPCUBE","[Time].[Time].[Year].&[2015].&[2]")) + (CUBEMEMBER("OLAPCUBE","[Time].[Time].[Year].&[2015].&[3].&[7]"))

I haven't tested this but have assumed it works but a bit long and clumsy.

View 5 Replies View Related

Different Reportparameters For Same Dimension In Different Cube

May 24, 2007

Hi,



I have 1 report with 2 charts, both charts have their own dataset. The two datasets are mdx queries on 2 different cubes, but some dimensions have the same name.



Now I want to have 2 differenent selectable parameters for the [dim time] dimension. One for the first query in the first cube and the second for the other query in the other cube .



So I check in the mdx query builder, both dimensions as parameter, but because both dimensions have the same name, i have only one selectable [dim time] -parameter in my report.



How can i solve this?





Thanks,

Dennis

View 3 Replies View Related

NULL Values In Cube Dimension

Apr 16, 2004

I have a fact table with a simple integer lookup key into a basic dimension table. However, some of the fact lookup key fields are NULL. I would like the Analaysis Services reports to show this NULL category. Instead, Analysis Services discards any NULL entries and the records are completely absent from the reports. What is the best way to achieve this?

Thank you!

View 2 Replies View Related

Why Mining Structure Can Only Use One Dimension From A Cube?

Sep 11, 2006

Hi,

I am working with several tables, but for now I just mention 4 : one is fact table (named Usage), and 3 dimensional tables Periods, Products, and Regions. The fact table contains references to the dimensional tables. Table Periods contain two other columns month and year.

I created a cube containing columns from those 4 tables. Deployment was successful. Trouble comes when I want to create a mining structure using Time Series containing these columns :

- Period
- Amount (of money)
- Product name
- Region name

When I choose to use cube (instead of table) as source for mining structure, I'm forced to choose only one dimension (among the Periods, Products, and Regions). Whatever dimension I choose I end up being unable to use the column period as the Time-Key column. Effectively I cannot use Time Series method since I cannot use the column period.

(1) Why is this so [why Visual Studio forced us to use only one dimension from the cube] ?
(2) Why Visual Studio eliminates the column period, column that has relationship with the
time dimension?
(3) What is the use of Cube anyway to the mining? Is there still any use for it?
(4) What is the solution to that kind of problem I face?

Thank you,

Bernaridho

View 6 Replies View Related

Analysis :: How To Print Dimension Usages For Any CUBE

May 5, 2015

Best way to print Dimension Usages with Measure Group for any CUBE.

This actually facilitate business people to understand which dimensions mapped to which measure group.

View 2 Replies View Related

Analysis :: Dimension Was Not Found In The Cube When String Was Parsed

Sep 1, 2015

I'm using SQL-Server 2008, Visual Studio 2013. I've got created Linked Object (Linked Measure) in Cube2 from Cube1. Everything was fine, but I edited Measure in Cube1, as I found documentation there is no ability to refresh Linked Objects so I deleted and recreated Linked Measure on Cube2. After It I can't process Cube2, receiving following errors:

MdxScript(Cube2) (10, 24) The dimension '[Dim]' was not found in the cube when the string, [Dim], was parsed.The END SCOPE statement does not match the opening SCOPE statement.

View 3 Replies View Related

Analysis :: Set Attributes In Sort Order For A Dimension In SSAS Cube

Jul 22, 2015

For Example: I have one dimension named as "Name", Under this I have "FirstName" and "LastName" Attributes are there.But when i drag "Name" dimension, By default "First Name" dragged. But i Want "Last Name" should drag.

View 6 Replies View Related

Analysis :: How To Set Attributes In Sort Order For A Dimension In SSAS Cube

Jul 22, 2015

I have a dimension like Districts, Under that 2 Attributes are there i.e,District ID and Districts. When i drag Dimension "Districts", in OLAP grid it come District ID first. But i want Districts to drag first. How can we sort Attributes(District ID and Districts) for a dimension.

View 6 Replies View Related

Error Processing Cube With Disabled Lowest Level Of Shared Dimension

Jul 23, 2005

Hi,This is probably a classic scenario with a shared dimension that weneed to use in different cubes, where all fact tables do not offer thesame level of detail. Dimension is snow-flaked.The cube that's causing me troubles was designed by marking the lowestdimension level Diabled and not Visible. This allows me to get rid ofone of the snow-flake tables (the one with the lowest level), thusallowing an INNER JOIN with the remaining table which has a level ofdetail corresponding to the fact table.When processing the cube, I get a 'member with key '[blah]' was foundin the fact table but was not found in the level '[blah]' of thedimension '[blah]'' that seems to indicate that none of my fact foreignkeys exist as primary keys in the dimension table. However if I thenattempt to query the cube, all data seems to be there.Would anybody be in a position (and willing ;-)) to share his/her ownexperience working around a similar issue?Thanks,SRL

View 2 Replies View Related

Analysis :: Creating OLAP Cube / Dimension In Visual Studio ERRORS

May 15, 2015

When I want to create a dimension i always end showing up errors below:

COPY
<Batch xmlns="http://schemas.microsoft.com/analysisservices/2003/engine">
  <Process xmlns:xsd="http://www.w3.org/2001/XMLSchema" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:ddl2="http://schemas.microsoft.com/analysisservices/2003/engine/2" xmlns:ddl2_2="http://schemas.microsoft.com/analysisservices/2003/engine/2/2"
xmlns:ddl100_100="http://schemas.microsoft.com/analysisservices/2008/engine/100/100"

[Code] ...

Errors and Warnings from Response
    Internal error: The operation terminated unsuccessfully.
    The following system error occurred:
    Errors in the high-level relational engine. A connection could not be made to the data source with the DataSourceID of 'DB LAB2', Name of 'DB LAB2'.

[Code] .....

View 2 Replies View Related

SQL 2012 :: SSAS Cube - Show Dimension Attributes For Only One Specific Fact Measure?

Aug 3, 2015

I have built a fact table and few dimension views in Datamart with the aim of creating a Cube.

On the Fact table I have added a CASE Statement with the following threshold for Premium due amounts:

CASE WHEN....
'Due_0-1_Month'
'Due_1-2_Month'
'Due_2-3_Month'
'Due_Over_3_Months'
'Overdue_0-1_Month'
'Overdue_1-3_Month'
'Overdue_3-6_Month'
'Overdue_Over_6_Months'
...END

I then created a Dimension to link this to:

CREATE VIEW...
Select 'Due_0-1_Month' as Ageing_Threshold
union all
Select 'Due_1-2_Month'
union all
Select 'Due_2-3_Month'

[Code] ....

I was successful in processing the cube, however the problem is everytime I drag the dimension on the columns field in Pivot tables the Thresholds start to break up the other amounts that I have on display like Acquisition Costs, Tax amounts. I am only interested in showing the breakdown of Premium amount measure by the Threshold dimension.

somehow 'Hide' or 'prevent' the Threshold dimension from breaking down the other measures on the Pivot and only breakdown the amounts for Premium?

how I should structure my tables in SQL or any MDX queries to resolve this.

View 0 Replies View Related

How To Convert UTC Time (retrieved From SQL) To Local Time In Reporting Services Based On Time Zone

Aug 7, 2007



Hi all,

I have created a report in SSRS 2005 which is being viewed by users from different Time Zones.

I have a dataset which has a field of type datetime (UTC). Now I would like to display this Date according to the User Time Zone.

For example if the date is August 07, 2007 10:00 AM UTC,

then I would like to display it as August 07, 2007 03:30 PM IST if the user Time Zone is IST.


Similarly for other Time Zones it should display the time accordingly.

Is this possible in SSRS 2005?

Any pointers will be usefull...

Thanks in advance
sudheer racha.

View 5 Replies View Related

Analysis :: Cube Dimension With Bool Filter Shows (blank) And True Instead Of False And True?

Jul 31, 2015

I have a cube that has a Dimension set up with several values some of which are bools. While Browsing in Excel or SSMS, two new values, when used as a filter shows (All) (Blank) and (True) for selections instead of (All) (True) and (False). 

View 2 Replies View Related

Time Dimension

Sep 4, 2007

Hello,

I am trying to make a time dimension in analysis services. Is it possible to include the hours of a day in the dimension ? Is necessarily the day level the lowest of the hierarchy?

Thank you
ST

View 3 Replies View Related

Time Dimension

Aug 14, 2007

(This is the Twilight Zone......not so much)

What are the pros and cons to using SSAS to create time dimensions based on a date field in the fact table as opposed to a stand alone time dimension table.

I can see many problems with loading a time dimension table. The date is from the same table as most of my fact data. I have a column in my OLTP that sets last change date so I can tell if my fact data is an insert or update but it wouldn't tell me if the date column had been changed, just some column in the table. I'm going to have several thousand sales on any given day so I'll be reading a lot of rows just to put one row into the dimension.

From a SSIS point of view I'd think leaving the date in the fact table would be better.

View 5 Replies View Related

Need Help To Create My Time Dimension

Mar 30, 2004

Hi,

I have a fact table which contains the transaction date, ProductID, QTySold, TotalSaleAmount, etc...

Since I am new to OLAP therefore I need help to now create the table for TIME on which I will be basing my time dimension... I have read a few articles and have gathered that at the end of the exercise my fact table should have a 'timeid' column which will be linked to the same column in the table being used for the time dimension...

I have gone through the tutorial of MS-Analysis Service and FoodMart example have some idea about what he structure of this table will be.

My questions are:

1. I need guidance on how to create the table for time. One option is to just copy the table used in the Foodmart example but thought that might work but my concept will not be clear

2. The structure of the table to be used for time dimension is quite clear (i think this part is easy). What I want to understand is that how do i POPULATE this table which data? Can some one provide me with scripts, SPs, or whatever to do this.... This is the area where I am lost...

3. How will I enter the "TheDate" column in my fact table and link it with my table for time dimension...

Looking forward to someone's help.

BTW, I would like to share a very good article which i recently found in one of the newsgroups. Some of you might like appreciate it too:
http://www.sqljunkies.com/Article/D1E44392-592C-40DB-B80D-F20D60951395.scuk

View 3 Replies View Related

Creating A 4-4-5 Time Dimension

Aug 29, 2007

Hello:
Very soon my company will be moving to a 4-4-5 reporting schedule. Basically, what this means is that the first month of the quarter will have 4 weeks, the second will have 4 weeks, and the third will have 5 weeks. Therefore, for the 2007 the dates for Jan, Feb and Mar will be as follows:
Jan - 1 - 27
Feb - 28 - 24
Mar - 25 - 31

Currently, I have an SSIS package creating a record for each day in the Time Dimension. Is there any script out there that will help me build a Fiscal calendar such as the one described above?

I realize that this is not a direct SSIS question but I figured that some of you might have encountered this situation and hence my post.

Thank you!

View 4 Replies View Related

Time Dimension According To Different Granularity

May 29, 2008

Hi,
I got inventory fact table. For the past two weeks, I got on a daily level; beyond that, weekly level, and beyond that monthly. I need to tie it all in to the time dimension of course €“ and the problem is, how do I do it on different granularity?
As far as time dimension, tn the datamart, I got tables dim_date with key column date_id (int) , and correspondingly dim_week with week_id(int) and dim_month with month_id(int).

What I€™ve done so far, is created a time dimension from dim_date table (meaning granularity=daily) and simply tied in all the inventory €“ daily, weekly, monthly, on the day level (it all has date_id field in it, even the weekly and the monthly. Its simply the day of the end of week or end of month) I didn€™t tie anything to dim_week and dim_month.
Does that makes sense? The result is kind of strange. I cant upload an image here, but€¦ well it seems ok, I got year, week (€˜GL Week€™) and then €¦ this is the annoying thing: why am I getting a €˜date€™ column, when I only want it by week or by month? I can€™t make that column disappear (e.g when in time hierarchy I only group by month, still a €˜day€™ column will be there, and will show 4 days€¦ the 4 €˜end of week€™ that comes from €˜date_id€™.)
How do I make it go away??

Thanks for reading : ) I know it€™s a bit long

View 1 Replies View Related

Time Dimension Design Question

Dec 20, 2007

Im trying to design my time dimension and need to add a field tohandle null dates in the fact. So if at the time of ETL the date isntknown, referential integrity will be preserved. Kimball suggestsinsterting a record in the time dimension to handle this with adescription of 'Date not available' or something like that. Howeverif users are doing inner joins on the dimension they will obvisouslybe pulling the datetime field..what should be in the datetime fieldfor this particular record?

View 4 Replies View Related

Sorting The Time Dimension In Browsers

May 20, 2008



Hi All,
I've looked around but can't seem to find an answer for this.
I have a cube that has a fairly large time dimension (going back to 1949) as the data demands this.
When a user is browsing the cube and applies a filter or adds the a time heirarchy as a value it's always sorted from oldest to newest. Whilst the need is there to look at data from 1949 most people want to look at the last few years. The problem is they have to scroll right down the list to get to this. Is there a way of having the most recent years of the time dimension appear first in these lists to make them more accessable?

I hope that makes sense!

Any help would be appreciated.
Thanks
yayomayn

View 10 Replies View Related

Please Guide - Especially About Time Dimension And Approach In General

Mar 30, 2004

Hi,

I have a table which contains all the transaction details for which I am trying to create a CUBE... The explanation below in brackets is only for clarity about each field. Kindly note that I am using the following table as my fact table. Let's call it tblFact

This table contains fields like transaction date, Product (which is sold), Product Family (to which the Product Belongs), Brand (of the product), Qty sold, Unit Price (at which each unit was sold), and some other fields.

I have created a Product dimension based on tblFact. I don't know if this is a good idea or not :confused: Is it okay and am I on the right track or should I base my Product Dimension on some other table (say tblProducts and then in the Cube editor link tblProducts with tblFact based on the ProductID field? Please guide.

Now coming to my last question:
Currently I am also creating my Time Dimension based on tblFact. Is this also a wrong approach?
1. Should I instead create the Time Dimension based on a different table (say tblTime) and again link up tblTime and tblFact in the Cube editor?

2. if yes, then how do I create tblTime from tblFact in a manner that it only contains all the transaction dates.

3. Assuming that I should take the tblTime approach, then should this table (tblTime) also contain the ProductID - representing the Product which was sold for each date in tblTime?

I realize that this is a lenghty post but reply and more importantly guidance from the experienced users will be greatly appreciated becuase I have recently started learning/playing around on the OLAP side of things and I know that this is the time that I get my foundations correct otherwise I'll end up getting used to some bad practice and will find it difficult to change my approach to cube designing later down the road.

So many thanks in advance and I eagerly look forward to reply from someone.

View 10 Replies View Related

HOW TO MODIFY MDX TO RESTRICT MEMBERS IN TIME DIMENSION

Dec 29, 2006

There are some 55 members in the arrival year level of the time dimension (1995 - 2055).
I am trying to find a way to restrict the number of years returned by this mdx query to the current year - 5. Any help will be appreciated.

WITH MEMBER [Measures].[ParameterCaption]
AS '[TIME DIMENSION].[ARRIVAL YEAR].CURRENTMEMBER.MEMBER_CAPTION'
MEMBER [Measures].[ParameterValue]
AS '[TIME DIMENSION].[ARRIVAL YEAR].CURRENTMEMBER.UNIQUENAME'
MEMBER [Measures].[ParameterLevel]
AS '[TIME DIMENSION].[ARRIVAL YEAR].CURRENTMEMBER.LEVEL.ORDINAL'
SELECT
{
[Measures].[ParameterCaption],
[Measures].[ParameterValue],
[Measures].[ParameterLevel]
} ON COLUMNS,
[TIME DIMENSION].[ARRIVAL YEAR].allmembers ON ROWS
FROM [TOURISM CUBE]

Thanks

View 4 Replies View Related

MDX To Compare The Currentmember Of The Time Dimension To Today

May 21, 2008

This is a cross-post from the Office PPS Planning site: http://forums.microsoft.com/TechNet/ShowPost.aspx?PostID=3379691&SiteID=17 I was hoping there may be some additional MDX resources here.

I'm trying to determine if the currentmember of the time dimension is > or < the value of today. I want to use this to change the the value of a member that I display on columns from actual (for prior to today) to forecast (after today). I have this MDX:


with

member [measures].[PYCY] as IIf(VBA!CInt(Format(VBA!Now(),"MM"))<10, VBA!CStr(VBA!CInt(VBA!Year(VBA!Now())-1)), VBA!CStr(VBA!CInt(VBA!Year(VBA!Now())+0)))

member [measures].[CYNY] as IIf(VBA!CInt(Format(VBA!Now(),"MM"))<10, VBA!CStr(VBA!CInt(VBA!Year(VBA!Now())+0)), VBA!CStr(VBA!CInt(VBA!Year(VBA!Now())+1)))

member [measures].[NYNY2] as IIf(VBA!CInt(Format(VBA!Now(),"MM"))<10, VBA!CStr(VBA!CInt(VBA!Year(VBA!Now())+1)), VBA!CStr(VBA!CInt(VBA!Year(VBA!Now())+2)))


member [measures].[test2] as Format(Now(), "yyyyMM")

member [measures].[test4] as [Time].[Day View].CurrentMember.Member_Key

member [measures].[diff] as DateDiff('m', Format(Now(), "yyyyMM"),[Time].[Day View].CurrentMember.Member_Key)


select

StrToSet('{' + Generate(Descendants(

{strtomember('[Time].[Day View].[year].&[' + [measures].[PYCY] + ']'), strtomember('[Time].[Day View].[year].&[' + [measures].[CYNY] + ']'), strtomember('[Time].[Day View].[year].&[' + [measures].[NYNY2] + ']') }

, [Time].[Day View].[Month]), [Time].[Day View].CurrentMember.UNIQUE_NAME, ", ") + '}')


* {[measures].[test2],[Measures].[test4],[measures].[diff]}



on 0,

[Scenario].[All Members].members

on 1

from [SalesForecasting]


Here is the result for 2 months:










October FY2007
October FY2007
October FY2007
November FY2007
November FY2007
November FY2007


test2
test4
diff
test2
test4
diff

All
200805
200610
#Error
200805
200611
#Error

None
200805
200610
#Error
200805
200611
#Error

Actual
200805
200610
#Error
200805
200611
#Error

Forecast
200805
200610
#Error
200805
200611
#Error

Override
200805
200610
#Error
200805
200611
#Error

Plan
200805
200610
#Error
200805
200611
#Error



The error is: #Error Execution of the managed stored procedure DateDiff failed with the following error: Exception has been thrown by the target of an invocation.Argument 'Date1' cannot be converted to type 'Date'..

Why can't DateDiff calculate the difference between 200805 & 200610?

Thanks

View 5 Replies View Related

Cube Processing Takes Time

Jan 31, 2007

Hi,
cube processing is taking more time in a new server while same cubes takes less time in another server.
the cubes are processed through DTS package
can anybody help finding out the possible reasons for this.
Regards
Naseem

View 5 Replies View Related

Slow Moving Dimension And History Time Stamp

Nov 14, 2007

The following question might sound a bit stupid but I'm not a database expert so hopefully nobody minds me asking it.

Here's what I did:

1. I created an SSIS package that is supposed to import new data into my data warehouse as it becomes available.

2. Since I need to maintain some of the history I use the Slow Moving Dimensions part (set the history flag on input fields) but run into an error condition while running the package. The message basically says that I'm about to create a duplicate record which is not allowed.



Original Table1:

PK1 field1
PK2 field2
PK3 field3
field4
field5

-----------

Now I enhanced it like this:

Extended Table1:

PK1 field1
PK2 field2
PK3 field3
field4
field5

CreateDate (new)
NewDate (new)
ActiveFlag (new)
_____________________

Now on some records the package is supposed to archive history by populating the (new) fields. In order to keep the record unique (primary key constraint) thought, do I need to make the (new) fields primary keys as well?

So I guess I'm struggling with a more basic concept;)

I would appreciate if somebody could shed some light on this.

Thanks in advance.
Dirk

View 3 Replies View Related

Query Builder Shows Time Dimension As Two Dimensions?

Oct 17, 2007

Good afternoon all,

I have created a cube in Analysis Services with a time dimension named Time. The data is only needed at the month level, so the fields in the table that the dimension is based on are [DTE MM] and [DTE YR]. In Visual Studio 2005 or in SQL Server Mgmt Studio I can browse the dimension and I see that Time has the following attributes: Year and Month both Regular attributes and Time (Key attribute). There is also a hierarchy named [Year - Month] and if I browse that it looks good dril down from All to Year to Month.

However, when I point my Reporting Services Datasource to the cube, and start Query Builder, I see two dimensions, [DTE MM] and [DTE YR] and no Time dimension.

[DTE MM] has attributes [DTE MM].[Month], [DTE MM].[Time], [DTE MM].[Year], [DTE MM].[Year - Month].

[DTE YR] has attributes [DTE YR].[Month], [DTE YR].[Time], [DTE YR].[Year], [DTE YR].[Year - Month]

This is causing me huge problems in my report. I need to use a date range in the query. To do this, I created Query Parameters and refer to Report Parameters that will be passed in. For example, I use ="[DTE YR].[Year - Month].[Year].&[" + Parameters!StartYear.Value + "].&[" + Parameters!StartMonth.Value +"]" (thanks to Simon Philips) as the query parameter for the Start Year Month, but if I use the [DTE YR].[Year - Month] in my SELECT, the data is not sliced in my query results. That is to say that the Year and Month show correctly, according to the date range, but the Measure is equal for each month and is equal to the total for the cube. To slice the data, I have to use [DTE YR].[Year].[Year] and [DTE MM].[Month].[Month] in my select, but then the data is shown for every month, i.e. the date range is ignored.

What am I doing wrong, or is this a quirk of RS that I can work around?

Thanks,
Kathryn

View 3 Replies View Related

Analysis :: SSAS Time Period Dimension Aggregation

Jul 27, 2015

I have a monthly time period dimension representing average number of students for each month. At the yearly aggregate level I don't want it to sum up the avg number of students from every month because that number is incorrect. I would like it to use the number of students from the most recent month as a roll up. Is that possible to configure in SSAS?

View 2 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved