SQL 2012 :: SSAS Pivot Refresh
Jul 18, 2014
I had a pivot to pull data from cube previously.The pivot had certain measures which are now set as invisible measures at the cube level itself.After the cube publish,i just reconnected my pivot to the cube so that the new measures and dimensions are shown in the field list.
I just tried refreshing the pivot with my old measures(which are now set as invisible) and it allowed me to refresh.How can this be possible if the measure itself is set as invisible at cube level?
View 1 Replies
ADVERTISEMENT
Jul 8, 2015
Is it possible to generate automatic refresh of excel 2013 table which displays some table of a power pivot model on file open?? I dont want to use pivottable (which supports this ...)
View 2 Replies
View Related
Apr 29, 2015
I have a pivot table that connects to our data warehouse via a PowerPivot connection. The data contains a bunch of comment fields that are each between 250 and 500 characters. I've set the columns in this pivot table to have the 'Wrap Text' set to true so that the user experience is better, and they can view these comment fields more clearly.
However, whenever I refresh the data, the text wrapping un-sets itself. Interestingly, the 'Wrap Text' setting is still enabled, but I have to go and click it, then click it again to actually wrap the text. This is very burdensome on the user, and degrading the experience.
Any way to make this text wrapping stick so that I don't have to re-set it every time I refresh the data?
View 2 Replies
View Related
Nov 12, 2007
Hi guys,
This is my first post. Could anyone help me out? I am trying to refresh a cube that i created by using a new script command but i get the following error "the script contains the statement, which is not allowed." On the microsoft page i've read that for refreshing you need to create a new script. Is there another way for refreshing the cube?
Cheers
View 5 Replies
View Related
Oct 12, 2015
how to trigger report's refresh following its underlying SSAS cubes process?
I want to keep reports data updated at all times, especially when this happens while user is already browsing the report..
I don't want to set an auto refresh for the report every 5 minutes as my cube is processed only one time during the day...
View 8 Replies
View Related
Jun 11, 2015
I have powerpivot which is pulling data from sharepoint list.
When I add new row to the list, on refresh the new row shows 1,0,.... instead of KPI icons(green yellow)
I have to open the excel, deselct and select one measure then it starts reflecting.
The KPI should get refreshed automatically, right?
View 2 Replies
View Related
May 31, 2015
I am having issues where the PowerPivot Field List does not refresh once I add a new table/field then select Refresh All under Data. I have to refresh every single PowerPivot Field List so they are all refreshed. ("PowerPivot data was modified" message). This doesn't happen at first but once the model is built on it tends to happen.I'm on Excel 2010 PowerPivot 2012 SP2 32bit. I have Windows 7 64bit and I'm wondering if the bitness inconsistency is an issue.
View 3 Replies
View Related
Dec 21, 2014
My PowerPivot workbook, is generating new tables on each refresh.
When opened up the workbook I find a dozen tables named, "Query1", "Query2", "Query3" etc.
It's pulling data from SQL Server.
View 4 Replies
View Related
Dec 4, 2015
I have a PowerPivot table setup based of a SQL Server stored procedure. I am kind of surprise that when I click the Refresh button on the PivotTable Tools ribbon bar above the report the report does not refresh. I have to open the PowerPivot window, click refresh and then go back to the worksheet with the PivotTable and click Refresh. Is that by design? It seems like the Refresh on the worksheet just gets the existing data from the table.
View 2 Replies
View Related
Nov 20, 2015
I have a situation where I have created a report using Power Pivot data Model Manage and linked to a SQL View using external sources from SQL Server. Once the View was linked from SQL server, I created the report in Power View from Inserted --> Power View. Since the business user requested the same data to be replicated in the excel worksheet in the form of excel, I created a version of excel report by selecting Data tab--> From other sources-->SQL Server --> connected to View (Same view that I connected in Power Pivot Data model for Power View report).
Once I created all the reports in my local excel and proceeded to upload in Office 365 share point. I followed the below steps:
1. Create a data source using the admin power bi website
using the connection string..Excel sheet Data tab --> Properties --> Connection String
2. Once the Data Source was created, Uploaded the excel report to the Power BI website.
3. Scheduled for the daily refresh updates.
Expected result:Since the connection set up was all successful and no issues with the refresh schedules, I was expecting to see my reports in both Worksheet reports in excel version and Power View reports to be refreshed on a daily basis. And daily transactions to appear on the reports on both Power view and excel worksheet reports.
Actual Result:I now only see the data refreshed in Power view reports and not the reports linked through Data--> sql server--> view ( i.e., excel worksheet reports). What surprises to me eve more is my refresh schedule was always successful. I do not see the refresh failed message.
I wanted both the power view and excel worksheet reports to get refreshed on a daily basis.
View 6 Replies
View Related
May 28, 2015
I am using excel 2010 and SQL server as a data source. When I create a report with the User name "demo_user" which has db_writer access, and mail it to the colleague , he could not refresh the data with the "demo_user" credentials and apparently its throwing user name or password invalid. The one who created only could be able to refresh the data.
What should I do If other people want to refresh the data? How could I fix this issue? We are using SQL server 2012 and excel 2010 powerpivot.
View 2 Replies
View Related
Apr 3, 2015
I've encountered an issue where the ALLSELECTED function works fine unless I use a date hierarchy, i.e. year, quarter, month, date, for the rows in a pivot and then use a year slicer, select one or more years individually, and the clear the filter on the slicer. The year(s) that I selected in the slicer remain at 100% in the pivot instead of returning to the subtotals for the unfiltered slicer.
This only occurs when I use a calendar hierarchy for rows and a date field for the slicer, either from the hierarchy or a regular date field.Below are images of the normal behavior and then the result after following the steps above. Can't figure out why the calendar hierarchy is causing the issue since it works for all other time functions, etc., and follows best practices such as contiguous dates, etc.
View 3 Replies
View Related
Aug 19, 2015
I am trying to implement some powerview report in excel 2013 itself (not in sharepoint).
I have implemented a SSAS tabular model and deployed to server. Now my aim is to load this tables in the SSAS tabular database into powerpivot so that i can use this data for creating powerview reports. However when i tried to import data from SSAS, it asks database and MDX query. My requirement is to load the dimension and fact tables to power pivot as it is.
View 7 Replies
View Related
Nov 19, 2015
We have an Excel PowerPivot model that we are trying to move to SSAS Tabular. The model is complex and has over 300 measures. To group these in Excel, we pasted in dummy tables and defined the measures in logical groupings. Now when we are migrating to SSAS, we have to delete the pasted tables --that have ALL of the measures, in order for the import to work successfully.
How to migrate the model? We have a nice report of all of the measures from DAX Studio, but I am not looking forward to manually re-entering 300 measures through the user interface. Is there any way to define measures in batch? Or is there a way to change the pasted table to a file so the import will work? Will the import work in SSAS 2016?
View 3 Replies
View Related
Jun 25, 2015
The thing is I can´t make update powerpivot, it raises a generic error. Tried to import into ssas tabular and worked fine.
Is there any way to get a better error detail or debug it someway?
View 4 Replies
View Related
May 7, 2015
I have a very small SSAS database with around 35 Mb. I opened it on Excel 32 bits and started dragging fields to a pivot table and it started failing with memory errors. The behavior on the SSAS server was that memory started growing very fast until 8 GB (vm memory total) and then the error is reported in excel.
What might be the issue in such a small database? I would understand in a big database, but not on this one.
View 13 Replies
View Related
Sep 9, 2015
I have opened an account in [URL] and taken the 60 days trial for power bi pro. I've developed power pivot and generated power views in share point 2013. But, I'm new to Power BI desktop. I have created a report in power BI desktop and published to [URL]. Also, I have uploaded an excel file directly to [URL] and created the report from the workspace available there itself and pinned the report to dashboard also. Everything is fine till this. But, I need to refresh the file which I have uploaded. I have some dummy data in excel sheet.
ZipCode State ZipName
2345 AA AA
456 BB BB
6787 CC CC
This has been created as a table and then added to data model. So, power pivot has been created for the same. Then I have uploaded this file to [URL] site. But, I'm getting an error message while trying to schedule refresh for the same.
"You cannot schedule refresh for this dataset because it does not contain data model connections. You cannot schedule refresh on worksheet connections or linked tables. To schedule refresh the data must be loaded into the data model."
How can I create a data model connection? How can I schedule refresh for an excel file like this?
View 3 Replies
View Related
Sep 29, 2015
I have a ssas tabular model as a data source in a .pbix-file. I have uploaded the .pbix-file to Power BI Services and it works fine as long as my visual studio project is open. If I close my visual studio project, the objects in Power BI Services will say "The data recievement for this visual information was not successful."
View 2 Replies
View Related
Aug 20, 2015
When we use Partition switch and load the data to a table, can we refresh the indexes for specific partition, so that we don't need to rebuild / refresh for complete is this possible ?
View 1 Replies
View Related
Oct 22, 2015
I created sql job using maintenance plan to run DBCC Checkdb for all databases. But I didn't choose the option Ignore databases where the state is not online. If any db is restoring the same time as DBCC Check db job running, is check db job fails?
View 1 Replies
View Related
Aug 20, 2015
Given a model in Power Pivot with a number of KPIs that are hidden with the 'hide from client tools' option. After restoring the model in SSAS and connecting to the model from Excel, the KPIs are visible under a separate category/table "KPIs".
Other hidden items in the model like columns and measures remain invisible.
Is this normal behavior and what can I do about this?
View 2 Replies
View Related
Feb 25, 2013
Recently migrated from 2008 to 2012. Everything is working fine; however went to take my first set of backups today and one of them blew up:
Executing the query ...
Backup and restore errors: Unexpected number of disk files associated with database object. Possible cause for that is missing or corrupt cryptokey.bin or detach.log file.
Execution complete
Not finding much online on the specific error.
- Data source is valid
- Can process the cube
- Can query / navigate cube
Next step would be drop/recreate; however this is an older cube that I'd prefer to leave alone at this stage if possible.
View 1 Replies
View Related
Oct 20, 2014
Is there a way to determine when the SSAS Service last restarted? preferably a [mdx] query like you can do with the DB engine using a T-SQL query but any method that does not going to the servers OS and checking would be fine.
View 1 Replies
View Related
Jan 22, 2015
My customer asks to install three instances of SSAS on a single physical windows server. Is it possible?
View 1 Replies
View Related
Mar 12, 2015
I've built a robust looking Calendar dimension but that's easy because its all so well structured. Every date belongs to a particular week and every week belongs to a particular month and every month belongs to a particular quarter etc. January 1st is always going to be a member of week 1, month 1, quarter 1.But here's the rub, real life isn't as predictable and stable as a calendar.
Lets say you have an table containing personal information. You might have gender and marital status in there and even though they both relate to one person, they're unrelated to each other so how do you put those in a hierarchy? Which one goes first and which second because you can get combinations of either.
View 1 Replies
View Related
Jul 14, 2015
I know how to create an alias for a SQL server instance, so instead of MyServerMyInstanceName, I can type MyInstanceName into my SSMS connection box. But SSAS does not allow me to connect with the alias.
I've looked all over and found plenty of documentation that SQL 2005 and 2008 doesn't allow the use of instance aliases for SSAS. I've even found notes from Microsoft saying "we'll fix this in a future edition." I have not found any indications or notes as to whether or not this has been fixed.
Can aliases be created for 2012 SSAS? Or is this still not available?
View 0 Replies
View Related
Sep 10, 2015
how to move the dimension attributes from currency to geography and vice versa(i.e need to change their positions) in SQL Server 2012. i need currency to be placed in top of geography or geography below currency.
View 6 Replies
View Related
Nov 28, 2012
I have an SSAS cube that i want to add some actions to. I've had problems adding a reporting action to the cube so decided just to add a URL action instead. Start simple and build on the concepts...
So i add a new action, give it a name, set the Target Type to Cells, Taget object to All Cells. I've put no condition on the action since i want it to appear all the time.
The action content type is set to URL the action expression is set to [URL] I've also set a caption of "Google" under the additional properties and said that the caption is MDX (I'm aware that it isn't but i do intend to expand on this...).
I then build and deploy my cube, call up excel (2010) and then create a pivot table off the back of the cube but when i right-click the cells in the pivot table and go to "additional actions" it tells me that there are none specified.
[URL]
View 6 Replies
View Related
Feb 12, 2014
I have a server which has SQL Server 2012 SSAS.
My client wants SSIS and database engine to be installed to be mapped to this analysis services engine.
Is that possible?
View 3 Replies
View Related
Sep 5, 2014
How I can script out or copy an existing assembly to another SSAS box? I am kind of new to MDX.
View 0 Replies
View Related
Nov 19, 2014
I have a cube where i would like to define some actions. I have done report Actions but they are limiting in terms of what i am trying to achieve.I want a popup window from the action from relevant cells at the moment i can use the urlaction type to open the link in a new window which is ok but i want this as a popup.
View 0 Replies
View Related
Jun 26, 2015
I can detach/attach SSAS database.But I have a software that protects(backs up) the files of the SSAS Database.
What the customer needs is to be able to take these backed up files and port it to a different server and attach it there.But the new server complains that these files have no corresponding detach-log files.
The customer doesn't want to backup and restore the SSAS databases.
View 2 Replies
View Related
Apr 16, 2015
I am working on SQL 2012.We have a SSAS Cube build. On top of it client use Excel to connect to SSAS Cube and See the reports.My Cube process every hour and take almost a 1-2 min to Process.When ever End user/Client See or refresh the Excel report (Which use Cube as Source),WHEN CUBE IS PROCESSING ,they get an error that Source is not available
We Have tried best but cannot bring down the Processing time of the cube to 3-5 Second , so that End user don't face report refresh issue at the moment of cube processing
Requirement :In Case End User see the report while Cube is processing from back end , Instead of Error they should see some customize Msg which we can provide some thing Like "Data is Refreshing , please wait ".
View 5 Replies
View Related