I have set SQL Database Maintenance plan in SQL Server 2000. it ws working fine but now it didnt work and fails everytime. can anyone advise me how to identify the reason why its not working.

View 5 Replies


ADVERTISEMENT

Backup Maintenace Plan

Apr 17, 2000

I made a backup maintenace plan in sql7.0, but it doesn´t work. The message included on the event logger is:

SQLServerAgent
SQL Server Scheduled Job
'DB Backup Job for DB Maintenance Plan 'Teste''
(0x219C5CB03C11D4119D8F0020188D7311) -
Status: Failed - Invoked on: 4/17/00 3:25:00 PM - Message:
The job failed. The Job was invoked by Schedule 12 (Schedule 1).
The last step to run was step 1 (Step 1).


And before this message there is another one that can be making something goes wrong:


SQLServerProfiler
Executable: C:WINNTsystem32mmc.exe
Description: Unable_To_Set_RegKey_Val
Source: ........srceventlog.c
Line: 315


Someone can help me telling me the reason that is generating this kind of error and doesn´t work. I have do the same think in others two server and there it works ok.
Thanks in regards

Sandra Lino

View 1 Replies View Related

Maintenace Plan Question Please

Dec 11, 2005

I am trying to "Edit Recurring Job Schedule" in a new maintenance plane,however in start and end times there is no option or display for AM or PM toselect. I have seen on other systems an available AM/PM in the time window.I tries entering the time in 24 hour format, but that was not recognized.thank you

View 1 Replies View Related

Maintenace Plan Best Practice

Aug 28, 2007

My question is recommendation for setting up maintenace plans that are safe and complete. What do you recommned I do for setting up a plan that backs up, and deletes old files older than 5 days. Should I do anything else and why?

thank you!

View 2 Replies View Related

SQL Server - Database Maintenace Plan

Jul 13, 2000

Help!!!

Our Database Maintenance Plan has stopped backing up the database. I can manually backup the database but the plan does not work. We tried creating a new plan but the new plan is not backing up either. Any ideas would be appreciated. Thank you for your help!

View 3 Replies View Related

Maintenace Plan Not Executing In 2005

May 1, 2008

Hello All,

Few days before, I had setup Maintanance plan for taking backup in 2005. It was running nice.But suddenly it stops automatically. It is not creating log file too.

Does anyone faced this type of problem ? Or does anybody knows the workaround for this.
Thanks in advance

--kneel

View 3 Replies View Related

Moving Maintenace Plan From One Server To Another

Feb 7, 2007

I am moving from one physical server to another. I have a full working maintenance plan backing up the databases on the production server.

Is there a way to "script" / move the maintenace plan from the productiuon server to the new one easily?

thanks for help!

www.mirrorgate.com

View 2 Replies View Related

Database Maintenace Plan Location

Dec 18, 2005

Hi again,I have setup a maintenance plan schedule, my question is; can I create anadditional plans located on another network location ?In my attempts the only locations displayed are those on the current server.thank you

View 1 Replies View Related

Maitenace Plan Check Database Integrity Task Fails With Failed:(0) Alter Failed For Server 'xyz'

Feb 21, 2008



Hi,



I am administering several SQL Servers running SQL Server 2005 SP2 Build 3042.
I have a common maintenance plan that runs on each of the servers. The maintenance plan runs
fine on all the servers except for one. On the one server the Database Integrity check fails with the following error:


Check Database integrity on Local server connection
Databases: <list of databases>
Include indexes
Task start: 2008-02-21T00:05:42.
Task end: 2008-02-21T00:05:46.
Failed0) Alter failed for Server €˜XYZ€™

I created a test maintenance plan to just do the integrity check and selected one database only and this also failed with the same error message. I ran this test maintenance plan and configured it for each of the databases in question and it failed each time.
If I run the DBCC manually against the databases they all report fine.


I read some of the post that talked about the €œAllow Updates€? being set incorrectly but that does not apply to my problem since my configured and run values are set to 0.

Does anyone know what the problem could be?

View 23 Replies View Related

Database Maintenance Plan Failed

Mar 4, 2002

Hi all-

I have a database maintenance plan set up to run for user databases. The integrity checks job for a user database failed today with the error 'error 7919 Repair cannot be processed, db must be in single user mode' . I have scheduled the job to run once every week. Is this a bug in sql server 2000? I thought that the db is placed into single user mode when the integrity job starts. Please advise.



Thanks,
ndba

View 2 Replies View Related

Backup Maintanence Plan Failed

May 18, 2007

Hello,



I created a backup maintanence plan which run good before. I am not sure why it didn't work now.

The error message from job history is:



05/18/2007 09:04:40,backupdbs.backupdbs,Error,0,PEPESQL2005PROD,backupdbs.backupdbs,(Job outcome),,The job failed. The Job was invoked by User RMWB3cs002291. The last step to run was step 1 (backupdbs).,00:00:00,0,0, 0
05/18/2007 09:04:40,backupdbs.backupdbs,Error,1,PEPESQL2005PROD,backupdbs.backupdbs,backupdbs,,Unable to start execution of step 1 (reason: line(1): Syntax error). The step failed.,00:00:00,0,0,,,,0



How to debug this problem?



Thanks

View 11 Replies View Related

SQL Server 2005 Maintenance Plan Failed To Run

Sep 19, 2007

I created a database maintenance plan on sql server 2005 (standard SP2, cluster environment). The plan created successfully on scheduled successfully. But when execute the plan, it fails. Here is the information in the log:

The last step to run was step 1 (TranLog backup).,00:00:01,0,0,,,,0
09/19/2007 12:06:38,Tranlog backups.TranLog backup,Error,1,LAIWWORKSITE1LA,Tranlog backups.TranLog backup,TranLog backup,,Executed as user: STROOCKSQLSRV. Microsoft (R) SQL Server Execute Package Utility Version 9.00.3042.00 for 32-bit Copyright (C) Microsoft Corp 1984-2005. All rights reserved. Started: 12:06:38 PM Warning: 2007-09-19 12:06:39.27 Code: 0x80012017 Source: Tranlog backups Description: The package path referenced an object that cannot be found: "PackageTranLog backup.Disable". This occurs when an attempt is made to resolve a package path to an object that cannot be found. End Warning DTExec: Could not set PackageTranLog backup.Disable value to false. Started: 12:06:38 PM Finished: 12:06:39 PM Elapsed: 0.688 seconds. The package execution failed. The step failed.,00:00:01,0,0,,,,0

Any ideas? Thanks.

View 1 Replies View Related

Failed Maintenance Plan [SQLSTATE 42000] (Error 22029)

Apr 9, 2001

We have a maintenance plan that runs every 15 minutes to backup a transaction log. It fails intermittantly with the message:
"sqlmaint.exe failed. [SQLSTATE 42000] (Error 22029). The step failed."
This is the only error message to be found in any of the logs. I've checked event viewer, the SQL error logs, exception log, maintenance plan log, sysdbmainplan_history table in msdb, but can't find any extra information. I checked the MSDN for info on this error and this did not add any extra light on the problem.
Does anyone have any ideas on how to de-bug this error?
regards
Stuart Ainsley

View 4 Replies View Related

SQL Server 2008 :: Failed Task In Maintenance Plan Not Being Reported By Database Mail

Apr 29, 2015

I have inherited a server on which is a maintenance plan with two subplans on different schedules. In each subplan there are Execute T-SQL tasks with scripts for index rebuilds. Each task is set up with a Completion arrow to the next task and a Failure arrow to a Notify Operator Task. I was asked to add a task for index rebuilds to a specific subplan for a specific database, which is what the other tasks also do. I discovered that my task was failing but the others were fine. No notification was sent about my task failing even though the job is marked in MSDB as a failed job. I have sent a test email using the "Send Test Email..." option when right clicking Database Mail in SSMSand I receive an email so I know Database Mail works.

I set up a test job to model the index job that I can't get notifications from. I have two T-SQL tasks that just select the top row from a small table. The first task has a syntax error that I did so it would fail. I have a failure arrow to a Notify Operator Task and a Completion arrow to another T-SQL task with no syntax error which has a Success arrow to a Notify Operator task. As expected, when I execute this job I receive one failure email and one success email.

The only other troubleshooting step I know to try is to add a Notify Operator task before my failing task. That Notify Operator task will hopefully fire to tell me that the previous step was successful. I am not having problems with the other steps so I was just thinking I would try to get the subplan to send me a success email about one of the steps that has been working fine.

View 1 Replies View Related

Maintenance Plan Failing With Login Failed For User 'sa'. [CLIENT: &&<local Machine&&>]

Nov 28, 2007

Maintenance plan for bakcup is failing with "Login failed for user 'sa'. [CLIENT: <local machine>]"

I went to the Maintenance Plan and opened the Subplan. I clicked the "Manage Connections"

It has three tabs:

Name: Local Server Connection
Server: prod
Authentication: SQL Server Authentication

I clicked the Edit and it shows the Connection Properties:

It says: Enter information to logon to the server. "Use a specific Username and Password" is checked. Username is set as "sa" while the password is empty. I typed in the correct password and pressed Ok. When I go back again, the password still shows empty. I tried to run the plan and it again fails. Do you know why it is not showing the password as blank even if I try to save the password.

View 1 Replies View Related

Database Maintenace

Jan 25, 2008


Does any body have any good recommendations for maintenace plans?

Here are few questions I have.

When should indexes be re-indexed?
What should be done first? Reorganize indexes or rebuild indexes?
How often backups should be done and what kind?
How often should database statistics be updated?
Do database statistics need need to be updated on system databases?
How often should a database integrity check be done?
How long should history be kept for?
What is a good order for tasks should be done?

Any input would be great

Eytan

View 16 Replies View Related

Maintenace Plans

Jan 25, 2008

Does any body have any good recommendations for maintenace plans?

Here are few questions I have.

When should indexes be re-indexed?
What should be done first? Reorganize indexes or rebuild indexes?
How often backups should be done and what kind?
How often should database statistics be updated?
Do database statistics need need to be updated on system databases?
How often should a database integrity check be done?
How long should history be kept for?
What is a good order for tasks should be done?

Any input would be great

Eytan

View 3 Replies View Related

Maint Plan - Failed To Acquire Connection Local Server Connection

Feb 15, 2008

I created a single step plan that does integrity checks. It fails with the error below. I created a new connection using our clusters virtual sql name.


Executed as user: ACCTCOMsqlagent. ...n 9.00.3042.00 for 64-bit Copyright (C) Microsoft Corp 1984-2005. All rights reserved. Started: 1:10:06 PM Error: 2008-02-15 13:10:49.02 Code: 0xC00291EC Source: {0CF32F3D-A8D1-492A-9C0F-AD4E0FC67D14} Execute SQL Task Description: Failed to acquire connection "Local server connection". Connection may not be configured correctly or you may not have the right permissions on this connection. End Error Warning: 2008-02-15 13:10:49.02 Code: 0x80019002 Source: OnPreExecute Description: SSIS Warning Code DTS_W_MAXIMUMERRORCOUNTREACHED. The Execution method succeeded, but the number of errors raised (1) reached the maximum allowed (1); resulting in failure. This occurs when the number of errors reaches the number specified in MaximumErrorCount. Change the MaximumErrorCount or fix the errors. End Warning Error: 2008-02-15 13:11:31.26 Code: 0xC0024104 Source: Check Database Integrity Ta... The package execution fa... The step failed.

The agent and db are running under domain accounts and the job is owned by sa.

Thanks for your help.


View 13 Replies View Related

MS SQL Server Maintenance Plan Failed: Error Code 0x534. [SQLSTATE 42000] (Error 15404))

May 3, 2008



hello,

we have changed the name of MS SQL server 2005 from XYZ to ABC using


sp_dropserver <old_name>

GO

sp_addserver <new_name>, local

GO


Now our maitenance plan is getting failed we are not able to execute backup jobs we are getting following error


Date 03.05.2008 16:00:00
Log Job History (ADM_AdminDB_TP_Backup.Subplan_1)

Step ID 0
Server ABC
Job Name ADM_AdminDB_TP_Backup.Subplan_1
Step Name (Job outcome)
Duration 00:00:00
Sql Severity 0
Sql Message ID 0
Operator Emailed
Operator Net sent
Operator Paged
Retries Attempted 0

Message
The job failed. Unable to determine if the owner (XYZSQLServer) of job ADM_AdminDB_TP_Backup.Subplan_1 has server access (reason: Could not obtain information about Windows NT group/user 'XYZSQLServer', error code 0x534. [SQLSTATE 42000] (Error 15404)).

please help us in this issue

View 13 Replies View Related

SQL Server 2008 :: Is Only One Plan Is Kept For One Query In Plan Cache

Mar 14, 2015

Is only one plan is kept for one query in plan cache?

i heard generally hash is created for a query and plan is search with this hash.

View 2 Replies View Related

Cached SQL Plan Vs. Stored Proc Plan

Dec 12, 2002

We have a debate in our team about embedded SQL vs. Stored Procs.

The argument is why use SP's if you can embed the SQL in the code and SQL2K will cache it on the fly?

I can't find any definitive information on pros and cons between the two methods.

If there are no major performance issues, or gotchas, I guess it comes down to developer preference.

SP Pros:
- Great SQL support in VS.NET (dev, debug, integration)
- Seperation of database specific code from middle tier.
- Less lines of code in middle tier
- VS.NET support for .xsd dataset definitions.
- Logic closer to data for more demanding processes.

Embedded SQL Pros:
- Less artifacts for version control
- Better encapsulation of logic


Any info would be appreciated.

thanks

Kevin

View 4 Replies View Related

Prepared SQL Plan Vs. Procedure Plan

Nov 23, 2005

I am working on tuning the procedure cache hit ratio for my server. We haveadded 4 Gb of memory to the server, which has helped. In addition, I have runthe DBCC FREEPROCACHE, which helped for a couple of days to get the hit ratioup to about 84% (from 68%).When I use the performance monitor on the server and look at SQL Server CacheManager:Buffer Hit Ratio, I see that the Prepared SQL Plan is around 97%, butthe Procedure Plan hit ratio is down around 55%. I've done some research ondifferent tuning techniques, but can't seem to find 1. a clear definition ofthe difference between the prepared sql plan and the procedure plan and 2.other than adding memory and running dbcc freeprocache, how can I get theprocedure plan cache raised? I do know that there are some procedures thatneed to be modified to be called fully qualified (e.g. exec dbo.sp_###instead of exec sp_###), but I don't think that those will increase theprocedure plan by 30% or more.Any insight you can give would be greatly appreciated.Thanks,Michael--Message posted via SQLMonster.comhttp://www.sqlmonster.com/Uwe/Forum...eneral/200511/1

View 1 Replies View Related

Actual Execution Plan Vs Estimated Execution Plan

Jul 7, 2006

The benefit of the actual execution plan is that you can see the actual number of rows passing through each step - compared to the estimated number of rows.But what about the "cost percentages" ?I believe I've read somewhere that these percentages is still just an estimate and is not based on the real execution.Does anyone know this and preferable have a link to something that documents it?Thanks

View 1 Replies View Related

Sqlmaint.exe Failed. [SQLSTATE 42000] (Error 22029). The Step Failed.

Jan 3, 2001

I get the following error when I try to run my scheduled job.
sqlmaint.exe failed. [SQLSTATE 42000] (Error 22029). The step failed.


Any ideas Thanks in advance
Reddy

View 1 Replies View Related

Package Failed : Failed To Decrypt Protected XML Node DTS:Password With Error

Apr 21, 2008

Dear all,

I've built SSIS package and made a job to execute it automatically but it always returns an error. The job returns OK but when we looked at the Log File viewer, it conatins this error log :

Key not valid for use in specified state

Failed to decrypt protected XML node "DTS Password" with error

What's wrong with the package ?
Thanks in advance.


Best regards,

Hery

View 22 Replies View Related

Fix For Transmission_status Message Connection Handshake Failed [...] The Logon Attempt Failed

Mar 30, 2007

Full message:

Connection handshake failed. An OS call failed: (8009030c) 0x8009030c(The logon attempt failed). State 66



Under these conditions, setting trustworthy on on the sending and receiving databases will solve this issue

1) Communicating between multiple instances

2) Using Kerberos security (NT Authentication, i.e. not certificates)

View 5 Replies View Related

Stuck Between Failed To Generate User Instance And An Attempt To Attach...failed

Sep 29, 2005

I wrote an application using Visual Studio 2005 beta 2 which uses a SQL Express .mdf file, included in the project, for the database.  After installing Visual Studio 2005 RC and the SQL Express that comes with it (I followed all of the uninstall instructions first) I can no longer add a SQL Express database to any of my projects, nor can I open the SQL Express database in my original project.  When I try either of these tasks, I get the "Failed to generate user instance of SQL Server due to a failure in starting the process for the user instance.  The connection will be closed."  I read the thread which dealt with this error, and changed the connection string for the database file that had worked before to User Instance = false.  The moment I click Test Connection or OK, I get the error: "An attempt to attach an auto-named database for file C:<path to project>EngSQL.mdf failed.  A database with the same name exists, or specified file cannot be opened, or it is located on UNC share." (<path to project> is actually a full path, I didn't want to type the whole thing out. :) ).  A search for this error turns up a solution of setting User Instance = false, which puts me in a catch 22 position.

View 80 Replies View Related

Log Shipping Failure Sqlmaint.exe Failed. [SQLSTATE 42000] (Error 22029). The Step Failed.

Sep 13, 2001

I have log shipping set up between 2 SQL 2000 SP1 Servers on Win 2000. The db is small 10 meg, and when the restore job on the backup server fails I am getting "sqlmaint.exe failed. [SQLSTATE 42000] (Error 22029). The step failed." as the message, the maint paln on the primary server show no error. Anyone seen this before? The restore has worked 3 out of 5 times

View 2 Replies View Related

Login Failed For User - Token Based Server Access Validation Failed With Infrastructure Error

Sep 9, 2015

Many a times see the below error in SQL Error log.

Login failed for user 'NT AUTHORITYANONYMOUS LOGON'. Reason: Token-based server access validation failed with an infrastructure error. Check for previous errors. [CLIENT: ]

Is this something to do here?

Note: If I run the below statement I know that the SQL Error log entry will go off, but wanted to know the real significance of this error?

CREATE LOGIN [NT AUTHORITYANONYMOUS LOGON] FROM WINDOWS

View 1 Replies View Related

Executed As User: CONNECTSRVmyadmin. Sqlmaint.exe Failed. [SQLSTATE 42000] (Error 22029). The Step Failed.

Feb 29, 2008

Hi all help needed from your End.

I have a re-indexing stored procedure,yester day night it got failed
"Executed as user: CONNECTSRVmyadmin. sqlmaint.exe failed. [SQLSTATE 42000] (Error 22029). The step failed."
what may be the reason..



View 4 Replies View Related

Import Export Failed : Data Conversion Failed

Dec 10, 2006

[Source - chn_employee_vew_test_txt [1]] Error: Data conversion failed. The data conversion for column "Column 42" returned status value 4 and status text "Text was truncated or one or more characters had no match in the target code page.".

[Source - chn_employee_vew_test_txt [1]] Error: The "output column "Column 42" (136)" failed because truncation occurred, and the truncation row disposition on "output column "Column 42" (136)" specifies failure on truncation. A truncation error occurred on the specified object of the specified component.

I using Locale (People's Republic of China) and code page of 936 (Simplied Chinese GBK) with header row delimiter {CR}{LF}.

I am using flat file import method.

Whenever the server process the Column 42 with value "11,Nanjing Rd.W, China" which contain 'comma' or '.' it will hit error importing with above message. When i manually change the column value to non comma or '.' (11 Nanjing Rd W China) in the flat file it is ok.

I am using SQL server 2005.

Please advise what need to be done to avoid this error ?

Thanks in advance and any idea or suggestion is very much appreciated as i have try to solve this issue for over a week but still not able to find any answer on it.

Please help.

regards,

kong



View 1 Replies View Related

Failed To Acquire Connection / The AcquireConnection Method Failed

Nov 11, 2005

I am running the Sept CTP.  I have created a SSIS package that pulls data from a text file and inserts into a database.  When I run the package on the DB server it runs fine.  I have moved the package the the web server (we are attempting to kick off the package from a web site) and we get connections errors. We are running the package using dtexec from the command line.

View 7 Replies View Related

Import Export Failed : Data Conversion Failed

Dec 10, 2006

[Source - chn_employee_vew_test_txt [1]] Error: Data conversion failed. The data conversion for column "Column 42" returned status value 4 and status text "Text was truncated or one or more characters had no match in the target code page.".

[Source - chn_employee_vew_test_txt [1]] Error: The "output column "Column 42" (136)" failed because truncation occurred, and the truncation row disposition on "output column "Column 42" (136)" specifies failure on truncation. A truncation error occurred on the specified object of the specified component.

I using Locale (People's Republic of China) and code page of 936 (Simplied Chinese GBK) with header row delimiter {CR}{LF}.

I am using flat file import method.

Whenever the server process the Column 42 with value "11,Nanjing Rd.W, China" which contain 'comma' or '.' it will hit error importing with above message. When i manually change the column value to non comma or '.' (11 Nanjing Rd W China) in the flat file it is ok.

I am using SQL server 2005.

Please advise what need to be done to avoid this error ?

Thanks in advance and any idea or suggestion is very much appreciated as i have try to solve this issue for over a week but still not able to find any answer on it.

Please help.

regards,

kong