SSRS Hardware Planning

Oct 18, 2007

I've done a fair amount of hardware planning for the SQL Server Database Engine. Now I'm doing so for SSRS which I don't have as much experience with. I haven't been able to find much information, especially around RAM capacity and have a few questions. Any responses or pointers to resources are appreciated.

Scenario: 2 load-balanced SSRS 2005 App servers with an independent back-end SQL DB for the config database. Total userbase is about 2000 (not simultaneous), and I'm still trying to get statistics for per hour requests. May also install multiple SSRS instances on these boxes with one of them in Sharepoint Integrated mode (don't anticipate high volume here). Load-balancing is for both performance and availability goals.

I'm looking at the SSRS App servers only and am analyzing amount of RAM, 32 vs 64 bit, and perhaps CPU core count.

1. Does 32-bit Enterprise SSRS benefit from more than 4 GB on a server, using AWE or other memory extension? Or is anything > 4 GB unused at 32 bit?
2. Are there material benefits to going to 64-bit OS / SSRS and increasing memory above 4 GB? (does IIS handle this?), Perhaps to 8 or 16 GB.
3. The boxes will be 2-way, dual core, with possibility of going to quad core. Is increasing core count a better use of budget than increasing RAM above 4 GB?


I've read the white paper, "Planning for Scalability and Performance with Reporting Services" (http://www.microsoft.com/technet/prodtechnol/sql/2005/pspsqlrs.mspx) which briefly (but incompletely) discusses 32 vs 64 bit, and really doesn't touch on RAM at all.


Thanks for any pointers,

Scott

View 2 Replies


ADVERTISEMENT

DR Planning Help....

Mar 8, 2007

I was told that my company is thinking about inplementing a "backup" server for out content loading server (aka load server)... this server loads files from several companies and then replicates the data out to our production environment to be seen. This server has serveral DTS/IS packages that do all this data movement and manipulation... I am not too up to date on technology for what they are asking so I thought I would ask here for some recommendations to head in the right direction...

I am not sure if clustering will work or maybe mirroring the database...

The server now is a publisher so the backup server would have to pick up if the #1 failed and then give command back to #1 once it is good... this is the part I have no idea about...

The #2 server would not have to really do anything but keep its data up to date unless #1 fails so you could say it would be fine to be a passive server...

Any ideas on what direction I should look into???

Thanks ahead of time.

View 8 Replies View Related

Planning To Install SP3

Jan 8, 2001

Hi All

I am planning to install SP3, anyone have suggestion before installation what are the precaution I need to take. please post your comments. Thanks in advance.

Thanks

Regards
Leong

View 1 Replies View Related

Capacity Planning

Nov 4, 2000

hi, can any one tell me what is the meaning of capacity planning and where do I get info about it,and how does this help me in sql server admin role
thanks

Ahmed

View 1 Replies View Related

Replication Planning

Feb 8, 2001

Hi every body,

my company wants implements transactional replication. We have three servers one in chicago(production)
second server in chicago, third server in kansas city.Can give me plan for implementing the replication.

Thanks

View 1 Replies View Related

Capacity Planning

Dec 11, 2000

What si capacity planning?
Where can i find more stuff on it?

View 1 Replies View Related

New SQLSERVER Planning?

May 26, 2004

Hi Guys,

We are planning for a new SQLSERVER for one of our application. The database will receive around 58 million events/year is roughly 160,000 messages/day

Making the assumption that an average message size is 2K. The messages comes to database through edi processes.

Any suggestion about database server configuration, and any other steps that need to be take care of before even thinking about creating a database??

help is greatly appericated..

View 3 Replies View Related

Capacity Planning !!!

May 28, 2001

Hi Everybody,

Can anybody explain me, what is Capacity Planning and what is Load Balancing?

tks in advance
sri

View 1 Replies View Related

Planning A Database

Aug 7, 2007

Hi all,

I'm very new to SQL and am learning via books and whilst on the job. I'm putting together my logical design at the moment and was wondering if anyone could suggest any websites that might give me an insight into the best way to go about this in an effective manner.

TIA,

SamuelT

View 1 Replies View Related

Project Planning

Feb 13, 2007

HelloBased on three tables (Projects, Tasks and UserCalender) I would liketo work out the total amount of available resources (UserCalendertable contains a entry for each user for each day, day being 7.5hours) and total required effort (sum of Tasks.EstimateLikley) splitover 12 months.For example:Jan:Available Resources: (4 Users, 7.5 hours per day, 5 working days perweek, 23 Working days in Jan) = (23 x 4) = (92 * 7.5) = 690 AvailableHoursRequired Resources:Project Start Date: 1/1/2007Project End Date: 1/6/2007Total Required effort (Sum of Tasks.Hours for above project): 500Hours Average over 6 months = 83.33 Hours per month, so in Jan I needto deduct 83.33 from 600 = 516.67 Hours.etcHow could I do this, I have tried several ways but finding it hard.Thanks

View 1 Replies View Related

Planning On Going With Dynamic SQL, But...

Jun 13, 2007

I've read a few posts on the stored procedure vs dynamic sql debate. I ran a few performance test for myself and it appears to be a wash.



Given that, I'm leaning toward dynamic sql mostly because it would mean one fewer place to have things.



But, before we go that route we wanted to ask the question:



Is there any compelling reason why we shouldn't abandon all of our stored procs and just write the SQL inside inside our functions in our business layer (essentially our data access layer)?



Or, is it just preference these days?



I was leaning toward procs, but I have to admit it would be nice not to have to keep up with all of them per all of our functions that call them.



Thanks,
Ron

View 3 Replies View Related

Planning A Replication

Aug 5, 2006

hallo
we have a sql2000 in the headquarter, and 3 new remote branches opening in few weeks with no sql servers installed yet.
We plan to setup a merge replica. The headquarter will have the highest activity on the replicated tables.
Shall we use all SQL2000 in the remote branches? Or could we use SQL2005, using a 2005 as a publisher and distributor?
TIA

View 3 Replies View Related

Planning Ahead W/ SQL Server...

Jan 3, 2004

With the current web app that I am writing, I am starting to plan ahead to the scalability problems that I am planning on encountering with the number of users that I may have...

My hosting plan now allows for a 50MB SQL Server database, but, I know that will not last long, each user will be using 3-5MB each of the database, so I am going to outgrow my space fast.

Would looking into (until i have enough subscribers to get a dedicated host), SQL Hosting be a good idea? Atleast to start off with something like http://www.alentus.com/hosting/sqlserver.asp ?

But then again, would a SQL Database growing to large get bad? Within a few years, i expect to have at max 5,000 users, so that could grow to a 25GB database... with millions of rows.

Would breaking it up into smaller databases for each N amount of users be a wise idea? Or would it not really matter?

Any help is much appreciated

Happy New Year
Harold.

View 1 Replies View Related

Need Advice On Planning For DataBase Changes

May 16, 2005

Hello;

View 8 Replies View Related

Database Capacity Planning

Sep 27, 2001

Does any one know where I can locate a document or template for database capacity planning on the web? Any help would be greatly appreciated. thanks.

View 1 Replies View Related

Planning For Creating A Database

Nov 16, 2007

Dear Experts,
now i was allotted as a complete DBA for one client and i've to take care from the creation itself.

we've understood the data will be around 20 GB initially, and from there onwards, 1GB data will grow in the database. total number of tables are around 1400. and we have primary key on each table.

Now you Experts, please guide me that how can i take the Fragmentation levels for best performance? or i need to give you more information regarding that.....

i need your valuble suggesions and guidence

View 2 Replies View Related

Planning Multiple Queries

Dec 2, 2005

I'm cleaning data which involves updating ~12 million rows with threedifferent models, progressively. First clean values using the modelwith finest granularity, then the remainder with the next model,finally what's left using the last model. The first model sets ~1/2 ofthe rows, the second ~1/4, the third ~1/5, and the remaining 5% don'tget updated.It's something like this:UPDATE t SET value=value*m.AdjustmentFactor, updateFlag='updated'FROM Table t JOIN Models m ON ....WHERE m.ModelID='first model' AND t.updateFlag IS NULLStart with 'first model' then 'second model' etc.I'm wondering what happens if I submit all three queries together, oras three separate submissions, waiting for the one before to complete.If I do them all as one group, the query planner might plan for thesecond and third updates based on the initial distribution of values.However, the first update removes half of the rows from consideration,so it seems to me a new plan should be prepared for the second query,based on the distribution at that time. If I highlight the queries inQuery Analyzer and execute, are all three plans created at thebeginning? Does putting GO between them (which I do) make anydifference?This is SQL Server 2000.Thanks,Jim

View 2 Replies View Related

Planning Database On SQL Server 2005

Apr 30, 2007

Hello,
We are establishing a database server for our product suite containg 14 products- these products is basically intended to be used by CAs and Accountants.

my databaseserver will have 14 databases-
4 are very small, 4 are complex and 6 are Very complex- there is a close intraction between all these databases.
at any time there will be around 500 users using these products but since these products are seasonal there is a chance that all 500 users are connected to one database only.(but there is also a possiblity that load is equally distributed on all the databases)
My product will run on intranat.

My requirement is:
1. What is best server configuration for hosting such type of database.(sqlserver 2005)
2. How many concurrent users sqlserver supports(MSaccess supports 15 concurrent users)
3. I want that if user has license for 10 users my Database should bear load of only 10 user.

View 1 Replies View Related

Sql Server Sizing Planning - Architecture Help

Jul 20, 2005

HiI joined a project where 100,000 rows were added everyday. Now due toadditional customers the expectation is 2 million reocrds/day ie 10 GB worthof textfiles. We have to estimate the hard disk, memory, # of CPUs etc.Wewill have one yearworth of data in the db. Rest will be in tapes etc.We will be using WIN2000, SQL Server2000.- Any comparable server sizing willbe appreciated.1. Tohandle every day load, I thought that we will have a table for each day(pre created in the database )and have a view with union all selectingfromall these 365 tables. (This is the only way to partition in MSSQL Serverright?).2. The requirement is to populate datawarehouse tables with all the data.However there will be only inserts mostly but there can be updates too whichhappenned in the past 12 days.Hence we have to use the data from the last12 days and massage it etc and populate into datawarehouse tables.How can I do this so that I will have the datawarehouse tables with n-12days of data and I will alwys add the last 12 days data to it.Do you have any suggestions?Ragu

View 3 Replies View Related

SQL Server Capacity Planning Best Practice

Aug 8, 2007

Hello,

I have been working on SQL Server Capacity Planning for a few weeks now and have gathered a lot of materials, but non of thes materials contain recommended best practices on SQL Server capacity planning and also they do not contain operational guidelines.

I would be glad if anyone can recommend a website or book that contain information on SQL Server Capacity Planning Best Practices.

Thanks,
Jide

View 3 Replies View Related

Model Database Recovery Planning

Mar 29, 2007

I cannot think of any reason, in our environment, why I would recover the model database. Change framework has all databases coming from DEV & QA before landing on PROD. We have never used the model database as framework of new databases either.

So, if I discontinued backup of the database, what is my recovery method if it become corrupt? Since mine is not used, can I simply copy it from another server?

View 5 Replies View Related

Planning For SQL Server 2005: 64-bit, OS, Processor, Memory

Jul 23, 2005

I was browsing Microsoft's SQL Server site, looking forsome details about SQL Server 2005. Didn't find whatI was looking for...I'm thinking about moving an existing SQL Server 2000workload to a new box, using SQL Server 2005, andmaybe the 64-bit version.My questions are:1. What is the current target date for release of SQL Server 2005?Will 64-bit ship when 32-bit ships?2. Will 64-bit SQL Server 2005 require a special versionof Windows Server 2003 (e.g. Windows Server 2003 Enterprise x64)?Will it work with both Intel and AMD processors?3. How many CPUs, and how much memory, will be supported bySQL Server 2005, 32-bit and 64-bit, on each OS that can runSQL Server 2005.I'm looking for a chart here, something like the chart onpage 117 of Kalen Delaney's "Inside SQL Server 2000" book.SQL Server 2005 SQL Server 2005Feature Enterprise 32-bit Enterprise 64-bit------------------- ----------------- -----------------CPUs supportedWin Srvr 2003:Win Srvr 2003 Adv:Win Srvr 2003 Ent x64:Physical memorysupportedWin Srvr 2003:Win Srvr 2003 Adv:Win Srvr 2003 Ent x64:Has Microsoft published this info, and I just can find it?

View 1 Replies View Related

Planning Database Storage For SQL Server 2005

Feb 13, 2008

Here are my planning details:

RAID 1:

2 disks RAID 1 for OS and BINS
2 disks RAID 1 for Backups.

RAID 10

4 disks RAID 10 for data
4 disks RAID 10 for log
4 disks RAID 10 for TEMPDB

Should i put the master and other system database on RAID 10 along with TempDB.

Or what else a guru fellow will advise in above setup.

thanks,

View 5 Replies View Related

SQL 2012 :: TempDB - Tlog Sizing / Capacity Planning?

Nov 18, 2014

I am in the process of formulating recommendations with respect to the purchase of additional storage for our current SQL 2012 SharePoint (2013) instance. My recommendation is to purchase separate storage (i.e, 15k disks) for the TempDB and Tlogs respectively (two sets of raid 10 disks). Currently, this server is hosting several instances, including SP, using two arrays (one for database and the other for Tlogs).

I am attempting to find information/recommendations on how to go about projecting the amount of storage for each of these while factoring in for growth.

Additional Details:

how to best formulate a reasonable estimate. Our largest content database belongs to IT and is currently ~80GB. That said, this is currently an outlier. The remaining content databases are less than 10GB (most are less than 2-3 GB). However, SharePoint will be used for digital document imaging in addition to, eventually, replacing file shares as our primary document storage medium once we roll it out.

Our current tempDB is ~400MB, but the instance was recently started a few days ago, as we had to failover to our backup server for hardware maintenance. I do not have any historical data on TempDB growth at this time. Also, I don't know how useful this would be given we have not fully deployed yet.

View 0 Replies View Related

Analysis :: SSAS Planning / Forecast Copy Data In Cube

Oct 2, 2015

Is there any way to copy my Data of 2015 to the Planning/Forecasting Value of 2016?

My question is based on that we use INFOR ION BI right now and there we can just add an Button in our reports wich physically copies the value from one year to the next year based on some other rules in the cube.

Now I need to make this example work with SSAS and Excel PivotTables but I cant figure out how.

I have absolutely no clue where and how to accomplish it. Do I use Calculations, do I use Actions, do i make it in the Dataview, Cube or directly in Excel?

View 4 Replies View Related

Using Visual Studio 2003 With Sql Server 2000 And Planning To Switch To Sql Server 2005

Aug 24, 2006

We have a project already developed iusing VS 2003 Enterprise architect edition using sql server 2000(have lots of table and stored procs etc.)
Now planning to switch to Sql server 2005 are there any issues associated with the switch.
 
I mean front end programming wise asp.net and vb.net front end codes do they work straight away or need to make any changes to all the front end codes, we are using datasets, data readers calling stored procs and also using lot of hash tables and XML object to make bulk loads to sql server via sqlxml3.0 sp3.
Please help thank you very much for the information.

View 1 Replies View Related

List Of Parameters Used Together With Rs: Parameter In SSRS 2000 And SSRS 2005

Apr 24, 2007

Hi,

Does anyone know of a link or list that has all the parameters for the "rs:" section of the URL access parameter, except for the ones in the Microsoft books?

Thanks,

View 1 Replies View Related

Reporting Services :: Interface Code Compatibility Between Custom Delivery Extension Of SSRS 2008R2 And SSRS 2012?

Sep 3, 2015

Currently we are using Custom Delivery Extension for SSRS 2008R2 We are planning to move it SSRS2012

My Question is: Whether we can use the same Code used for SSRS2008R2 to SSRS2012?

if not what code changes we should do?

View 3 Replies View Related

Can I Write SSRS 2008 Reports To Run On SQL 2005 SSRS?

Sep 12, 2007

Is it possible to write SSRS 2008 reports to run on an existing SSRS 2005 server?

If yes, what do I need to do to be able to write SSRS 2008 reports on my developer PC that will run on the SQL 2005 Server (which also has SSRS 2005 installed on it)?

I installed Visual Studio 2008 beta on the development PC and it appears that it needs SSRS installed on it too. So I installed SQL 2008 SSRS (SQL Server Reporting Services) and SQL 2008 Workstation Components onto the developer PC. Next I run the SQL 2008 "Reporting Services Configuration" tool. When I click on the "Web Service URL" section it hangs indefinitely and I have to force it closed.

The developer PC is Windows Vista Business.

Any suggestions on making this work, or any other information that you can think of that would allow me to use Visual Studio 2008 and the SQL 2008 "Report Designer Preview" tool to develop SSRS reports that will run on the SQL 2005 SSRS server?

Thanks!
-ErikR

View 4 Replies View Related

SSRS 2005 - Migrating SSRS Subscriptions

Oct 25, 2007



Hi,
We are in need of migrating SSRS subscriptions along with the reports. Could you please let me know the process ?

I really appreciate your help on this.

Thanks,
Sam

View 6 Replies View Related

SSRS 64Bit And SSRS 32Bit

Mar 11, 2008

I did a quick Google for this but found nada...

If I develop a report in SSRS 64 bit, can it be ported to a 32 bit installation? Any issues?

I will do my own testing, but I was curious if anyone else had experience doing this.

View 1 Replies View Related

Ssrs

Jun 3, 2008

send me some procedures to test reports in ssrs (sql server 2005)

sunil

View 3 Replies View Related

SSRS From .net

Jan 14, 2008

Hi,
In a .net application there is a link that brings up a SSRS report.
I have noticed that if it is the first time this report is requested i.e. Application has just been opened and the report button is clicked, then it takes a while to get this report to appear on the screen. But if this report is requested again (i.e. for the second time or more) then it only takes a few moments for the report to appear on the screen.
So it seems that only the first time the report is requested it takes a longer time to get this report. Is there a way to reduce this initial load of the report?
Thanks

View 3 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved