Scheduling Report Delivery For The First WORKING Day In The Month?

Sep 16, 2007

Has anyone figured out a good way of doing this?

The only suggestions I have seen along these lines involve scheduling the job every day and then manually editing the SQL Agent job that is created.

However the problem with this is that it completely removes the ability for non programmers to set the schedule themselves using the web interface.

Any ideas?

View 1 Replies


ADVERTISEMENT

SQL Reporting Services Delivery Extensions For Email. Not Working, Please Help.

Jan 10, 2007

In Sql Reporting Services 2005 (This is bolded because this same error is all over the web for Sql Reporting Services 2000 and thats not where my problem lies) I schedule a report to be emailed. However when the delivery extensions Deliver method is called I get the following error

Failure sending mail: The report server has encountered a configuration
error. See the report server log files for more information.

In the log it shows the following

ReportingServicesService!emailextension!4!01/10/2007-12:21:01:: Error sending email. Microsoft.ReportingServices.Diagnostics.Utilities.RSException: The report server has encountered a configuration error. See the report server log files for more information. ---> Microsoft.ReportingServices.Diagnostics.Utilities.ServerConfigurationErrorException: The report server has encountered a configuration error. See the report server log files for more information. at Microsoft.ReportingServices.Authorization.Native.GetAuthzContextForUser(IntPtr userSid) at Microsoft.ReportingServices.Authorization.Native.IsAdmin(String userName) at Microsoft.ReportingServices.Authorization.WindowsAuthorization.IsAdmin(String userName, IntPtr userToken) at Microsoft.ReportingServices.Authorization.WindowsAuthorization.CheckAccess(String userName, IntPtr userToken, Byte[] secDesc, ReportOperation requiredOperation) at Microsoft.ReportingServices.Library.RSService._GetReportParameterDefinitionFromCatalog(CatalogItemContext reportContext, String historyID, Boolean forRendering, Guid& reportID, Int32& executionOption, String& savedParametersXml, ReportSnapshot& compiledDefinition, ReportSnapshot& snapshotData, Guid& linkID, DateTime& historyOrSnapshotDate, Byte[]& secDesc) at Microsoft.ReportingServices.Library.RSService._GetReportParameters(ClientRequest session, String report, String historyID, Boolean forRendering, NameValueCollection values, DatasourceCredentialsCollection credentials) at Microsoft.ReportingServices.Library.RSService.RenderAsLiveOrSnapshot(CatalogItemContext reportContext, ClientRequest session, Warning[]& warnings, ParameterInfoCollection& effectiveParameters) at Microsoft.ReportingServices.Library.RSService.RenderFirst(CatalogItemContext reportContext, ClientRequest session, Warning[]& warnings, ParameterInfoCollection& effectiveParameters, String[]& secondaryStreamNames) at Microsoft.ReportingServices.Library.RenderFirstCancelableStep.Execute() at Microsoft.ReportingServices.Diagnostics.CancelablePhaseBase.ExecuteWrapper() --- End of inner exception stack trace --- at Microsoft.ReportingServices.Diagnostics.CancelablePhaseBase.ExecuteWrapper() at Microsoft.ReportingServices.Library.RenderFirstCancelableStep.RenderFirst(RSService rs, CatalogItemContext reportContext, ClientRequest session, JobType type, Warning[]& warnings, ParameterInfoCollection& effectiveParameters, String[]& secondaryStreamNames) at Microsoft.ReportingServices.Library.ReportImpl.Render(String renderFormat, String deviceInfo) at Microsoft.ReportingServices.EmailDeliveryProvider.EmailProvider.ConstructMessageBody(IMessage message, Notification notification, SubscriptionData data) at Microsoft.ReportingServices.EmailDeliveryProvider.EmailProvider.CreateMessage(Notification notification) at Microsoft.ReportingServices.EmailDeliveryProvider.EmailProvider.Deliver(Notification notification)

So it seems to be failing at GetAuthzContextForUser


I've set up my smtp as out domain email smtp, given the accounts all the permissions I could (Even going to far as to give Everyone permissions everywhere)
Currently my IIS, SQL 2005 and reporting Services 2005 as well as my local SMTP is running on the local machine account.


I cannot seem to get it to work, or even give me a different error.

Could anybody please tell me what needs permission where and what settings I need to have set up for this not to happen.


Some extra information

I'm using Windows XP to develop on however the server where this will eventually run is Windows Server 2003

I'm using ASP.NET 2 and SQL Reporting Services 2005 and SQL 2005 with sp1 loaded

Any help would be appreciated

View 1 Replies View Related

Report Delivery

Mar 27, 2007

hi all,
I have created a report using sql server 2005 RS.Ive deployed it in the server(localhost)also.In the subsription section of the report manager ive mentioned a emailid to whom ive to send the report.Ive selected the report server email delivery method from the dropdown list.After entering the emailid and scheduling the report and when i click ok i find that the report was not delivered.Im getting this error.

Failure sending mail: The report server has encountered a configuration error. See the report server log files for more information.

I culdnt find enything in the log files.

Can any1 help me as how to accomplish this?

Balaji

View 2 Replies View Related

Report Delivery -- HELP

Mar 16, 2007

Is SSRS limited to delivering reports to recipients inside your domain (active directory)? I'm using an SMTP server for report delivery an have set the SendMailToUserAlias to False and still can only send reports to e-mails with my domain (user@mycompany.com). I need to send reports to recipients outside my company -- is SSRS capable? If so, how do I configure it to do so?

View 1 Replies View Related

Disabling Scheduled Report Delivery Conditionally?

Sep 16, 2007

Hi,

I am currently planning on using Reporting Services for delivery of reports, some of which in turn are reliant on an import from FTP via SSIS.

In the event that the FTP fails I would like the delivery of just the dependant reports to be cancelled for just that day.

Any advice on the best way of achieving this?

Cheers,

Martin

View 3 Replies View Related

How Do Set Printer Delivery Extension In RS2005 For Report Subscription

Mar 14, 2007

Can anyone help on this topic...

i need to set Printer Delivery Extension, and create a subscription for report which will be sent to the printer automatically

View 1 Replies View Related

E-mail Delivery Report By Trigger Or User Solicitation.

Dec 15, 2006

It's possivel delivery a report after trigger execution ou user solicitation?

Thanks in advance, Rui Figueiredo

View 1 Replies View Related

Reporting Services :: Split Report Into Multiple PDFs During Windows Fileshare Delivery

Jun 3, 2015

I have a report that groups a particular dataset by customer, with a page break between each customer. If print this report, it looks great - one page per customer.

What I would like to do is have the report deployed on schedule to a windows file share, one .pdf file per customer. How to parse the output into individual .pdfs (one per customer) instead of a single .pdf containing all customers? I get it if this is not possible.

My current (painful) workaround would be to replicate the report for each potential customer, and set a schedule for each report to deploy sequentially. (Customer 1 at 9:00, Customer 2 at 9:01, etc).

Currently on SQL Server/Visual Studio 2008.

View 2 Replies View Related

Select Employees By Start Day For 8 Month Working

Jul 15, 2013

I have this column Sdate in my Employees table. This value represent the start date working.

I need to get all of the employees that between 8 and 10 month of work from today. How can I do it?

View 3 Replies View Related

SQL Server 2014 :: How To Find 5th Working Day In A Month

Oct 29, 2013

I would like to know how to find fifth workingday* of a given month and year.

workingday - working day is just any day apart from saturday and sunday. no need to consider any other holidays.

ex: I would just give month number and year as input and i would like to know date and day of the fifth working day.

Input : 10/2013
Output : 7th October 2013, Monday.

View 4 Replies View Related

Help With Modifying Working Query (group By Month)

May 28, 2008

Hi,

I have the following query which is working fine, but its returning a row for each day.

I'd like to modify it somehow so that we had the same data returned, but 1 row for each month. Can anyone offer some insight ?

Any help is much appreciated !!

thanks once again,
mike123






CREATE PROCEDURE [dbo].[select_Stats_LoginHistory]

(
@numDays int
)

AS SET NOCOUNT ON


SELECT CONVERT(varchar(10),LL.loginDate,112) as loginDate,
COUNT(LL.userID) AS TotalLogins,
COUNT(DISTINCT LL.userID) AS TotalLogins_Unique

FROM tblLogins_Log LL WITH (NOLOCK)
WHERE DateDiff(dd, LL.loginDate, GetDate()) < @numDays
GROUP BY CONVERT(varchar(10),LL.loginDate,112)
ORDER BY loginDate DESC


table structure below


CREATE TABLE [dbo].[tblLogins_Log](
[loginID] [int] IDENTITY(1,1) NOT NULL,
[userID] [int] NULL,
[IP] [varchar](15) NOT NULL,
[loginDate] [datetime] NOT NULL
) ON [PRIMARY]

GO

View 1 Replies View Related

Calculating Number Of Working Days In A Month

Sep 4, 2007

Hi 2 all,
I need to calculate the number of working days in a month. In clear, i need to ignore saturday.sunday and holiday in a month.

can anyone say the solution?

thanks.

View 2 Replies View Related

Integration Services :: Run DTS Package On Nth Working Day Of Every Month

Aug 7, 2015

I have a  dts package where user suggested me to run it on nth working day of every month.

View 7 Replies View Related

'Dynamic Time(year,month,date)' Report Template (rdl) Using Report Designer VS2005

Jan 19, 2007

I have three types of specific reports that i have to create with the input parameters (range) either

1: By date (rdl 1)

2.By Month (rdl 2)

3.By Year (rdl 3)

Is it possible ( or how do I ) to create just one report template ( one rdl) with the three sets of parameters ( hiding/invisible which ever two sets base on user selection) and the output of the report will display the desired type( either by year, month or date).

I ask this because its possible to create a drill down report from year down to date etc in report designer (vs 2005). Not sure if I can create one instead of three rdls and with the 'logic' built within that template.

Thanks

Regards

Alu

View 4 Replies View Related

How To Scheduling Report

Jun 25, 2007

Hi Friends



How to generate the Report every month automatically.with out endusers explicitly .



Regards



Raju

View 1 Replies View Related

Scheduling Montly Report

Aug 10, 2007

Hi all,

I currently have a report which needs to be scheduled to run on every 1st of the month to get records of last month. For example, on Feb. 01 the report will get all records by the date range of Jan. 01 to Jan. 31. My current report does not have any defined report parameter. It gets all the date range it finds from the table.

Please advise how can I start with this.

Any help is much appreciated! Thanks!

View 11 Replies View Related

Customizing The Report Scheduling...

Feb 28, 2007

one of the requirements is that if the report takes a long time to run the user can start report processing and later
when that report is processed user can see that in his 'My reports' section,

What will be the best way to do this, my main concerns are -

1 How can I use scheduling to accomplish this.

2 How to save the report, as snappshot or what...

3. How can I find in my Web app. that report is ready or not and show a link to it.

View 5 Replies View Related

Scheduling Report With Dynamic Filename

Jan 18, 2008



Hi,

I have report that needs to be scheduled hourly and the output is in excel. I want this to have a dynamic filename (Filename + datetime.xls).

How do i do that?


cherriesh

View 4 Replies View Related

How Can I Generate A Report With Sqlserveragent Job Scheduling

Apr 30, 2008



Hi all

Thanks for advance if u people giving solution to me

How can i generate SSrs with Sqlserveragent job

plz give me steps or send me any example





Regards
Kishore shetty

View 1 Replies View Related

Scheduling To Email A Report With Dynamic Parameters

Feb 8, 2006

Hello,

I have a report that uses a begin date and an end date as paremeters along with a user's email adddress to generate thier schedule for the coming week. I would like to schedule this report to run at the beginning of the week and email to each user based on thier email address. So the parameters will be system.date +1 and system.date+6 and user email. I have the users email addresses in a table so the 3rd parameter could be a "for each email in table users...". Is this posssible? Should it be in Report services or a scheduled Stored Procedure? Any help with syntax will be greatly appreciated!

Thanks,

Bob Myles

View 4 Replies View Related

Transact SQL :: Convert Entire Scheduling Functionality For A Report

Oct 19, 2015

In our application, we do scheduling.   I need to convert the entire scheduling functionality into Transact-SQL for a report.  I'm stumped on how to convert some of that functionality.  We use a function from Delphi that I see no equivalent in SQL.  Further, we still support SQL2005, so the Transact-sql has to be compatible with SQL2005.  So, DateFromParts will not work at all for me as it was added in a later version.

The function looks like this:function EncodeDayOfWeekInMonth(const AYear, AMonth, ANthDayOfWeek, ADayOfWeek: Word): DateTime;

The purpose of the function is:Returns a DateTime that represents a specified occurrence of a day of the week within a specified month and year.how I can do this with a Transact-sql statement?  As I said earlier, I'm constrained by the fact it must work in a SQL2005 instance.

View 4 Replies View Related

Reporting Services :: Scheduling MS Report With Date Parameters

Jun 2, 2015

I need to schedule a report with date ranges which change from month to month.  Is there a scheduler date function I can place in the parameter field(s) for that report?

View 4 Replies View Related

User Profile Dependencies Problem In Report Scheduling

Aug 2, 2007

Hello
I have a report i want to cache each night.
To make this possible, we do not use parameters but use filters based upon de user that is executing the report. So we can cache the report the first time any user executes it and the same report is already cached for all users becasuse the security is based on filters, not in query parameters.

When i try to schedule it, i get the message:
"user profile dependencies and cannot be run unattended rsHasUserProfileDependencies"

Although user variable paramter is not used in the query and it is only used in the filter when any user views the report RS dont allow me to schedule it.

How can I schedule this report to be executed all night unattended ?? The user is not a query parameter so it should allow it.

Thanks in advance

View 8 Replies View Related

Reporting Services :: Calculating Average Amount Of Working Days In A Month - SSRS 2005 Matrix

Jun 22, 2015

I have got this matrix and I am trying to calculate the average amount of working days in a month. At the moment, I have divided the total number of jobs by 21 for every month which is a hard coded value. However, I am not sure how to retrieve this value dynamically. Is there any formula that can find out the working days?

View 7 Replies View Related

Reporting Services :: Fixing Ssrs Report Table Column Heading While Scrolling Is Not Working In Report-viewer?

Dec 14, 2012

i just clicked on Advanced mode in Column Group, and then in Row Group Side i set Fixed Data=true for first  top static. I'm using local report not server report and i'm displaying that local report in Reportviewer. Now also its not working....

View 6 Replies View Related

Report Explorer And Report Viewer Webparts Not Working With New WSS 3.0

Jan 22, 2007

I just installed a fresh lab machine with WSS 3.0 and SQL 2005 SP1. I registered the RS web parts.

In the home page I added the Reports Explorer and the Report viewer web parts. I set up the Reports Explorer and the list of reports are showed.

When I connect the Report Viewer Web part to get report from the Report Explorer web part I get the maintenance WSS page. I have to delete the Report Viewer web part to have the page working again.

If I use only the Reports Viewer with a report (not connected to Reports Explorer) is working just fine.

Any ideas what could be the problem? Any hints on how to investigate this is also much appreciated.

Thanks,

Joe

View 1 Replies View Related

Parameter Selection Of Month, Showing Selected Month And Sum Up To That Month In Another Row

Apr 5, 2008

Hello what I'd like to display the following in a matrix report:

Parameter selected: 3 (March), 2008 (Year)

Monthly TO Summed up
ArtNo March <=March
1210 20,500 50,900
1220 21,200 64,000
1230 15,400 40,300
... ... ...

So, in the rows I have the articles and in the column the selected month via parameter. In another column I need to sum up all monthly values up to the selected month, meaning in this example the sum of jan, feb and mar per article.

View 3 Replies View Related

Reporting Services :: SSRS- How To Generate Sample Subscription Report Before Scheduling Time

Sep 24, 2015

How to achieve by using SSRS. How we can "quick run" report within the subscription menu to ensure report was set up correctly during creation.  Is there any way to generate sample subscriped report without waiting for scheduled time.

I mean whether we can verify the report parameters & data in generated the report. I have verified SSRS report manager .i cant see any button or option to test run the report in subscription feature.

View 6 Replies View Related

Need To Return Month/YYYY And Sort By It In Report

Aug 20, 2007

I have a report that is grouped by Month and Year.

So I need it to display:

Jan, 2007
Feb, 2007
Mar, 2007
Apr, 2007
Etc…

AND it needs to be sorted with Jan as the first month and Dec as the last (as if it was 1-12 for months).

Now I can get it to display by taking the month name and concatenating it to the year, but then of course it won’t sort the way I want it to.

Any suggestions on this?

Perhaps I could/should return two values, the first being what I display on the report, and the second being what I sort on as a hidden field? So I could return 200701, 200702, 200703, and so on, to sort on that?

View 2 Replies View Related

Show The Data Of A Report For Previous Month

Nov 14, 2007

Can we show the data of a report for previous month? The report is supposed to run montly basis. But once it is run, it shows the data only for the previous month.

we can show it if its only for previous day. In this case it is like this;

cdtable.SubmittedDate = GETDATE () - 1

But I dont find function like GETMONTH() or smthing.

Thanks

View 1 Replies View Related

Need Report Also Showing Months Even When No Data For That Month

May 13, 2008

Hi All,

would like to make a report with sales figures per month even is there are no sales figures that month.
Report should still show the month.

Any help to get me started in the wright direction much appreciated

edwin

View 1 Replies View Related

Show The Data Of A Report For Previous Month

Nov 14, 2007

hi,

Can we show the data of a report for previous month? The report is supposed to run montly basis. But once it is run, it shows the data only for the previous month.

we can show it if its only for previous day. In this case it is like this;

cdtable.SubmittedDate = GETDATE () - 1

But I dont find function like GETMONTH() or smthing.

Thanks

View 3 Replies View Related

SSRS Past 3 Month Analysis Report Problems

May 1, 2007

Hi all,



Hopefully someone can point me in the correct direction as to how best to implement this.



I'm looking to build a report in analysis services which connects to an analysis cube. Its a simple report showing a session count value by procedure type. What i'd like to do however is to show only data for the last 3 months.



I assume that i select the measure group i want to show (in this case {Session Count}) and then the relevant dimensions ({Procedure}, {Site}, {Session Date.Calander}) I've set up a Matrix on the report itself and added the measure group and Procedure dimension. I want to be able to choose the {Site} as a parameter. The problem i am having is how to show only the data from the last 3 months, either from the current date or from a date specified as a parameter.



I hope this makes sense. Any help people can give will be most appreciated.



Cheers,



Grant



View 7 Replies View Related