I have a cube with 20 dimensions. I have two dimensions with more than one million of members. When I process these dimensions Analysis Services 2000 create files with "axis" extension. What are these files? Why, when I start MSSQLServerOLAPService or when I process another cube in another OLAP database, these files sre updated?
I have some questions about SQL Servers 2000 and 2005 compatibility. In my configuration I have to use both servers. The cubes are stocked in 2005 server. May I transfer from 2005 to 2000 Analysis Services the cubes?
If yes, what is the procedure? The result of migration is the same in the two different versions?
I'm trying to create reports in RS2005 using AS2000 as my data source. I understand that if I use RS2005 on AS2000, I wont be able to enjoy the OLAP based parameters as in using AS2005. Does anyone know an easy way to easily use Parameters in RS2005 while still using AS2000?
i have a small problem with the data sources in the reporting services, maybe you can clarify the situation... I have a MS CRM 3 solution with the reporting services 2005 installed. From an other vendor we have a arcplan solution on the 2000 analysis services. I would like to get access from the 2005 reporting services to the 2000 cube. Is this possible? Ive read that the SSMS cant connect to the 2000 cubes. Can i connect from the reporting services??
I have a problem with Microsoft Analysis services, we already configure the boot.ini and the registry to use 3GB in RAM, but 2 or 3 times in a day we should restart the services to clean the memory, as you can see thats not acceptable. The application that use the OLAP is OutlookSoft . Here the scenery SO. Windows Server 2003 Enterprise Edition with SP 1 RAM 4 GB Analysis services 2000 with SP 4
Hi, I've created an SSIS package to process cubes on Analysis Services 2005. This works fine.
Now I wish to use the same package to run Cubes on Analysis 2000. I have changed My connection manager to point to this DB. When I test connection it works fine.
The problem lies, when I try to edit the Analysis Service Processing Task. I get an error message saying: "A connection cannot be made-Make sure the server is running".
I can get into Analysis Manager ok, and see the database there.
Hope someone can point me in the right direction here?
How do I connect to an Analysis Services 2000 cube while in Integration Services? My idea is to execute an MDX query from within a package, and then stage the data to a SS 2005 table for a RS report to query.
I've got a software development PC that was running SQL 2000 + Analysis Services + Reporting Service (sp4 from memory). I then installed SQL Express 2005 and later then SQL 2005 Standard (dev) + Analysis + Reporting and upgraded to Sp2 last month.
To help improve the performance of this poor little PC, I've gone to Control Panel and uninstalled SQL 2000 service. I've also used the SQL 2005 Surface area configuration tool to switch off the SQL Express instance from running. Practically, I probably should remove the $SQLExpress instance.
The problem I'm faced with is the SQL 2000 Analysis and SQL 2000 Reporting service is still registered as Windows Services and showing the the SQL Server Configuration Manager (2005), but there is no uninstall option in the control pannel. So I can't work out how to uninstall these software and services.
It is also apparent that there are a series of "files" in the C:Program FilesMicrosoft SQL Server80* directory like ..ToolsDevToolssamples*.* directory and others that shouldn't really be there if I've uninstalled SQL 2000 via the control panel.
Is there a SQL 2000 cleanup or removal tool that will help remove these old services and files?
Does anyone have some suggestions on how to cleanup my development PC without the full operating system installation?
Question (X-axis): How does automatic x-axis label positioning work? Answer: Currently, built-in Reporting Services charts only allow automatic positioning in order to avoid overlapping the x-axis labels. The label direction (horizontal/vertical) of the axis labels depends on the label string sizes and the available space. X-axis labels are either shown horizontally in one line, horizontally in multiple lines with line breaks, or vertically. Showing x-axis labels at an angle, or explicit manual control over individual x-axis label positions is currently not supported.
Note There are several third-party chart add-ins that enable more control over axis labels. These add-ins can be installed on top of Reporting Services 2005.
I have exactly the problem indicated above in that some sectors of my Pie Charts I am are trying to produce are small and are close together thus labels overlap in some cases. As it says above, only automatic placing of the labels is available, but there could be a solution through third party software.
Does anyone know of a 3rd party solution/add in or a workaround?
I have a simple-column chart and in the x-axis I put the date values and in the y-axis the sale price values.
The chart works perfectly in the case when there is only one sale price for the same date. But, when the price changes during the same day, then there is problem. In the following example
x y
1/1/2007 6.25
2/1/2007 7
2/1/2007 4
3/1/2007 8
the chart will have three columns and in the date 2/1/2007 will display the min or max of the two values. What I need is to represent all the values i.e. the chart must have four columns , as much as the rows of the dataset
I'm putting Interval 50 and Maximum 100 in Vertical Axis Property but by default 0 is coming. I unchecked mark of Always include Zero Box and Minimum is Auto. But still I'm getting 0 in Vertical Axis Chart in SSRS.
We run 2014 enterprise. I have 3 series being charted on a line (with dots) chart. I know what the series are but to ssrs they are dynamic. One of them really needs a secondary y axis because its a percentage. Is there a way to do this? From what I read if I was to somehow make them less dynamic, then ssrs could treat this one differently. Also, what if I want data point values to show only on this plot but not the other two?
please excuse my ignorance but if someone could point me in the right direction i would be grateful.
i have produce a chart with some data against date points on x axis. i have another date field which i want to combine with the orignal date axis is this possible .
ie
table
results planned date Acutual date 10 02/03/07 01/03/07 46 03/03/07 03/03/07 60 06/03/07 07/03/07
i want to combine the planned date and actual date as an x axis
I have, a SSAS 2012 tabular instance with SP2, there is a database on the instance with a read role with everyone assigned permissions. When configuring the Power BI analysis services connector, at the point where you enter Friendly Name, Description and Friendly error message, when you click next I receive the error "The remote server returned an error (403)." I've tested connecting to the database from Excel on a desktop and connect fine.I don't use a "onmicrosoft" account so don't have that problem to deal with.
We use Power BI Pro with our Office 365. As far as I can tell that part is working ok as I pass that stage of the configuration with a message saying connected to Power BI.The connector is installed on the same server as tabular services, its a Win2012 Standard server. The tabular instance is running a domain account that is the admin account for the instance (this is a dev environment) that account is what I've used in the connector configuration. It's also a local admin account. There is no gateway installed on the server.
I have a cube that we are processing nightly via an Analysis Service Processing Task in SSIS. In order to increase the performance of the processing time, we elected to use a lot of rigid dimension attributes, and do a full process of everything in the SSIS task. The issue that I am having is that after that task completes, I need to go into Visual Studio to deploy the cube becuase we are unable to browse or use the cube. This issue seemed to start once we changed the SSIS Analysis Service Processing Task to do a full process on the dimensions, rather than an incremental.
I would expect that once development is done, and it is processed and deployed, that is it. My thinking is that the SSIS task should just update the already deployed cube,
I have a chart that I am grouping data by Year, Month, day then Hour (this is to view server performance data) - however i need the label for the hour grouping to be in the format of HH:MM and not H:M by using expression
i would like to show all Labels available in a Chart and rotate the Labels 90°. How can i do that ? I changed the Propertie "Interval" to 1, "LabelsAngle" to 90, "LabelsAutoFitDisabled" to true in my Chart Axis.
How to right choose key column in"Mining Structure" for Microsoft Analysis Services?
I have table:
"Incoming goods"
Create table Income ( ID int not null identity(1, 1) [Date] datetime not null, GoodID int not null, PriceDeliver decimal(18, 2) not null, PriceSalse decimal(18, 2) not null, CONSTRAINT PK_ Income PRIMARY KEY CLUSTERED (ID), CONSTRAINT FK_IncomeGood foreign key (GoodID) references dbo.Goods ( ID ) )
I'm trying to build a relationship(regression) between “Price Sale” from Good and “Price Deliver”.But I do not know what column better choose as “key column”: ID or GoodID ?
What is the best optimised options to display the date labels with bi-weekly intervals starting date Date from one month to three months future from the current date?
As per above requirements, I have built the below line graph query and graph, currently it only displays the date labels as per data but I need to display date labels with bi-weekly intervals starting date from one month to three months future from the current date. Also another issue found, if there are few more date labels then does not show all labels on horizontal axis.
Select /* Set Week End date as Sunday */ DATEADD(DAY, 7 - DATEPART(WEEKDAY, t.TaskBaseline0FinishDate), CAST(t.TaskBaseline0FinishDate +1 AS DATE)) as[WeekEnd] ,count(t.TaskBaseline0FinishDate) as Baseline ,count(t.TaskFinishDate) as Finish
Is it possible to remove the tick marks that I have circled in red?The chart has data Week by week over a year, and the T1, T2 etc are equivalent to Quarter1, Quarter 2 etcI've got a 3 level grouping, with the top level being Year, then Quarter, then Week. The label for the "Week" grouping is set to blank, and that's why you don't see it here.Removing the Tick marks would make the chart legend more readable in my opinion.
When I tried to create a bar chart using SSRS 2012, the vertical axis values are repeating for smaller data sets values. It's only happening when the data labels are below 5, when the data is above 5 this chart represents data fine.
I tried specifying the custom intervals and this option all together eliminated the bar for value 1, instead it only showed the value 1 as text on the chart.
I tried changing the data interval type as number and the data type is of Integer, these are counts which I am showing in the chart.
I have a bubble chart created with Report Builder 3.0. I have the Y-axis series is along the left side of the chart. When all X values are positive, everything displays normally. However, if any X-axis values are negative, the whole graph shifts slightly leftward and the Y-axis title is no longer visible. It seems to be overwritten by the shifted graph or simply pushed into nondisplay area.
Is there something I can do to make the chart stay put?
I have created range bar chart and I am not able to achieve the following tasks.
1. Change X-axis Label Format to Quarter:
I have x-axis with dates and y axis of project groups. I have changed x-axis interval type = month and interval=3.
Set the Maximum = Max(ProjectEndDate) and Minimum = Min(ProjectStartDate).
Now my chart showing 3 months x-axis interval dates in mm/dd/yyyy format. I want to change this interval date format to Quarter. The problem is LabelsFormat property is not recognize the "=Q or q or quarter" and also not accepting the expressions. How can I achieve this?
2. Placing series side by side when it is not overlapping
I want to place the same group series side by side only when the previous project end date is less than next project start date, otherwise place the next project to next row. How can I achieve this?
where uidate is a calculated field in my dataset that always has the value of 05/29/2012 (using formatdatetime("05/29/2012",dateformat.ShortDate))
Everything else is set to Auto, with stripwidth=0
I'm trying to display a single vertical line at the x-axis value of 05/29/2012
I have previously tried setting the interval offset to "05/29/2012" but that didn't work. I've also tried setting the value of a hidden text box on the report to "05/29/2012" and setting the interval offset to the value of that text box, but that gave me a "text box not declared" error.
How I can simply display a vertical stripline on my line graph at the x-axis value of 05/29/2012 ?
I'm trying to convert an old chart to Reporting Services. We have used the same dataset for years, it is very very simple. But it seems to me that Reporting Services can't deal with this simple dataset.
My question is: How can I get create a line chart using this dataset.
The data set consists of 1 row with 96 columns (a day divided into 96 sets of 15 minutes). Each column records how many events occurs within the 15 minutes. Along the x axis I would like to display a vertical line every 4 hours. The y axis should be numbered 0 to the highest value in the results.
I could not make this dataset any more simple than it is. But Reporting Services just chokes on this.
Here is a sample of the dataset : 1 2 0 4 5 6 7 8 9 10... 96
SSRS 2012 - VS2010...The report compares two years with a sort order on a value that has been engineered based on text switched to int. When sorting A-Z this is the result in the horizontal axis is: 5th, K, 1st, 2nd, 3rd, 4th, 5th..When sorting Z-A the result in the horizontal axis is:5th, 4th, 3rd, 2nd, 1st, PreK..Z-A is correct but A-Z sorting shows 5th as the start and end. The magnitude of the PreK location is correct but the label is wrong on the A-Z sort order. The sorting is implemented using the Category Group sorting option.
Hello, I have a problem when trying to fully process an SSAS database using Integration Services "Analysis Services Processing Task" task. I have 2 of these tasks which are responsible for processing the Dimensions then the Cubes. When I run the package either via the BIDS environment or on the local server from the Integration Services engine, I will get an error after about 20 minutes stating:
"Error: Memory Error: Allocation failure. Not enough storage is available to process this command""Error: Errors in the metadata manager. An error occurred when loading the <cube name> cube from the file \?D:Program FilesMicrosoft SQL ServerMSSQL.2OLAPDataMyWarehouse<cube file>.xml"
The cube name is not specific, it will fail and any of my cubes could be in the error log
If I fully process the AS database using the AS engine (logon to local AS server, right-click AS database and click Process), I get no errors at all, it processes and completes fine. The processing options are identical when I run in AS or via the SSIS "Analysis Services Processing Task" task.
I've searched quite a lot online but no joy, the information I have gleaned from various sites does not directly link SSIS with SSAS processing problems.
When either the AS processing starts via SSAS or SSIS the memory usage of MSMDSRV.exe increases to around 1.4 / 1.5 GB but never goes to 2GB ever, even when the error appears.
I've done the following with no effect.
" Have run via AS and works fine " No specific cube it fails on " Have created a Dimension only package, same problem " Changed the maxmemorylimit " Changed the connections to localhost " Memory DOES NOT max out on server
Server Specs: Windows Server 2003 Standard + Service Pack 2 4GM ram, 2GB paging file