Active/passive W/o Shared Disk Array
Feb 2, 2005can you have an active/passive without a shared disk array?
can you have an active/active without a shared disk array?
Where are the actual db files stored?
thanks
can you have an active/passive without a shared disk array?
can you have an active/active without a shared disk array?
Where are the actual db files stored?
thanks
Hi
I am having some teething problems while installing SQL on a 3 node cluster. Within the Cluster configuration I have 3 Cluster Groups with each of them having their associated disk resources. All these disk resources physically exist on a SAN.
The actual cluster is running absolutely fine and I can access all the disks from their respective owner node. The problem only starts when I start installing SQL Server 2005 on this cluster. I specify the Cluster group from the Cluster Group Selection and choose the desired partition and then the error message pops up
"There is not enough diskspace on the destination disk for the current SQL Server data files. To proceed, free up disk space to make room for data files, or install the data files to a different drive"
But the disk I am trying to install it on is 264Gb and none of it is used. I have also tried to change it to a different disk within the same Cluster group but to no avail. I have even tried to install it in a different cluster group all together but I get the same error message.
I have googled around havent found anything so far. The disks have got full permissions for the account I am installing SQL with.
Any help will be much appreciated.
Regards
Adnan
We have a SQL cluster server running with SQL 2005 Enterprise Edition SP2 on Windows 2003 Enterprise Edition.
Currently the cluster has 2 nodes with Active/Active. Now I need to add a new node as a Passive node. So after I have done it, the cluster will be a Active/Active/Passive cluster.
Because the cluster is a production server, I need to know exactly how I add a new node onto the current cluster without breaking anything. Also this is my first time to install a passive node, so it is difficult for me to understand how to install and configure it.
I have already added the physical node onto the cluster group so I can see the new node €˜paused€™ from the Cluster Administrator. Now I need to install the SQL but I am too nervous to run the installation program.
My questions are:
1. Do I need to run the SQL install program from one of other active nodes in order to install the SQL on to the new node? Or is it ok to run the SQL install program from CD?
2. Do I need to create a new virtual name, a new SQL named instance and a virtual IP address for the new passive node?
Physical node name Virtual name SQL Server Instance Name IP address
Node1 (active) SQL1 SQL1 xxx.xxx.xxx.100
Node2 (active) SQL2 SQL2SQL2 xxx.xxx.xxx.110
Node3 (passive) SQL3??? SQL3SQL3????????? xxx.xxx.xxx.120????
3. Is there a risk to delete or change the current active nodes? If so, will you let me know as I will be super-careful not to do it.
I highly appreciate your help!
I invoke xp_cmdshell proc from inside a stored procedure on a 2-node active/passive SQL 2005 SP2 Standard cluster. Depending on which server the xp_cmdshell gets executed on I need to pass different arguments in the shell command. I thought I could use host_name() function to get the runtime process server, however, I am finding that it's not behaving correctly. In one example I know my active node is server2, but the host_name() function is returning server1. The only thing that I could possible explain this is that the MSDTC cluster group is not always on the same active node as the SQL server group and in the case I am talking about the cluster groups are in this mode (differnet nodes). Does the xp_cmdshell get executed by the SQL active node or the MDTC active node? And what is the best way to find out which server is going to run my xp_cmdshell?
Thanks.
Edit:
Perhaps another by product of this is that if I run select host_name() from the Studio Management query window i get different results depending on which server I am running the Studio Management on. On server1 I get server1 and on server 2 I get server 2, all the while server2 is the active node. I need a different function that will always let me determine the correct server that'll be running the xp_cmdshell...
Edit 2: I guess I could determine the running host inside the command shell itself, but I am curious to see if i can do it (cleaner) from SQL.
What is the different between Active/Active and Active/Passive cluster configuration.
I am new, that's why.
Help please
(1) During installation of second node in active /passive mode do we have to assign new virtual sql sever name and IP address or can we join existing first node Virtual SQL server ?
(2) Do we have to carry full instllations in 2 nd node or only clint instllations ?what about location binary and data in 2 nd node ?
Hi,
We are trying to set up an active/active configuration of a SQL Server
cluster, and we had a few questions.
Initially, we want to have 2 Database Servers that would share the same
Database (both reading/writing to the same tables).
However, from reading the MS docs, we find out that we can have what
they call an "active/active" configuration using a Cluster but they
need to have 2 different disk sets, i.e. having 2 separate databases.
If this assumption is correct, how does the data get synchronised
between the 2 databases (that are on the 2 different disks sets)?
Can anyone help? thanks
Axel
Hi all,
Newbi to sql clustering.
I have a sql server 2005 standard edition with Active/Passive Cluster in production.
I have a new requirement where i need to create a new instance on this active/passive cluster that can be used by our sharepoint servers. Can somebody please let me know what are the steps that i need to follow like
1.What i need to ask my network admin?
2.How i need to proceed installing?
I am planing to do this over the weekend where i have the liberty of some down time.
Any help greatly appreciated
Thanks
I have a 2 way cluster and I want to apply SP4 on it.
Basically, I have 2 servers. Server A runs a default instance and another instance. While the default services is disabled and the other instance is running, Server B runs the default instance and has the other instance disabled. This basically acts like a 2 way cluster (active/passive).
How can I apply SQL Server 2000 SP4 on the 2 servers and have all the nodes come up the correct way? What are the steps to achieve this?
I just tried to apply SQL 2005 Std SP2 on a cluster, and all succeeded except for the Database Services. I've looked about and can't see any specific information for this. The Summary.Txt is below. I thought I was following the appropriate steps, according to the SP2 Readme.
Thanks for any help. (I'm at the client today)
Bob Coppedge
me at RLCoppedge dot com
Time: 04/04/2007 10:55:44.249
KB Number: KB921896
Machine: SQL01
OS Version: Microsoft Windows Server 2003 family, Enterprise Edition Service Pack 1 (Build 3790)
Package Language: 1033 (ENU)
Package Platform: x64
Package SP Level: 2
Package Version: 3042
Command-line parameters specified:
Cluster Installation: Yes
Log Location on Passive Nodes:
(SQL01) C:Program FilesMicrosoft SQL Server90Setup BootstrapLOGHotfix
(SQL02) C:Program FilesMicrosoft SQL Server90Setup BootstrapLOGHotfix
**********************************************************************************
Prerequisites Check & Status
SQLSupport: Passed
**********************************************************************************
Products Detected Language Level Patch Level Platform Edition
Setup Support Files ENU 9.1.2047 x64
Database Services (MSSQLSERVER) ENU RTM 2005.090.1399.00 x64 STANDARD
Notification Services ENU SP1 9.00.2047.00 x64 STANDARD
Integration Services ENU SP1 9.00.2047.00 x64 STANDARD
SQL Server Native Client ENU 9.00.2047.00 x64
Client Components ENU SP1 9.1.2047 x64 STANDARD
MSXML 6.0 Parser ENU 6.00.3890.0 x64
SQLXML4 ENU 9.00.2047.00 x64
Backward Compatibility ENU 8.05.1704 x64
Microsoft SQL Server VSS Writer ENU 9.00.2047.00 x64
**********************************************************************************
Products Disqualified & Reason
Product Reason
**********************************************************************************
Processes Locking Files
Process Name Feature Type User Name PID
**********************************************************************************
Product Installation Status
Product : Setup Support Files
Product Version (Previous): 2047
Product Version (Final) : 3042
Status : Success
Log File : C:Program FilesMicrosoft SQL Server90Setup BootstrapLOGHotfixRedist9_Hotfix_KB921896_SqlSupport.msi.log
Error Number : 0
Error Description :
----------------------------------------------------------------------------------
Product : Database Services (MSSQLSERVER)
Product Version (Previous): 1399
Product Version (Final) :
Status : Failure
Log File :
Error Number : 11009
Error Description : No passive nodes were successfully patched
----------------------------------------------------------------------------------
Product : Notification Services
Product Version (Previous): 2047
Product Version (Final) : 3042
Status : Reboot Required
Log File : C:Program FilesMicrosoft SQL Server90Setup BootstrapLOGHotfixNS9_Hotfix_KB921896_sqlrun_ns.msp.log
Error Number : 3010
Error Description :
----------------------------------------------------------------------------------
Product : Integration Services
Product Version (Previous): 2047
Product Version (Final) : 3042
Status : Success
Log File : C:Program FilesMicrosoft SQL Server90Setup BootstrapLOGHotfixDTS9_Hotfix_KB921896_sqlrun_dts.msp.log
Error Number : 0
Error Description :
----------------------------------------------------------------------------------
Product : SQL Server Native Client
Product Version (Previous): 2047
Product Version (Final) : 3042
Status : Reboot Required
Log File : C:Program FilesMicrosoft SQL Server90Setup BootstrapLOGHotfixRedist9_Hotfix_KB921896_sqlncli.msi.log
Error Number : 3010
Error Description :
----------------------------------------------------------------------------------
Product : Client Components
Product Version (Previous): 2047
Product Version (Final) : 3042
Status : Reboot Required
Log File : C:Program FilesMicrosoft SQL Server90Setup BootstrapLOGHotfixSQLTools9_Hotfix_KB921896_sqlrun_tools.msp.log
Error Number : 3010
Error Description :
----------------------------------------------------------------------------------
Product : MSXML 6.0 Parser
Product Version (Previous): 3890
Product Version (Final) : 6.10.1129.0
Status : Success
Log File : C:Program FilesMicrosoft SQL Server90Setup BootstrapLOGHotfixRedist9_Hotfix_KB921896_msxml6.msi.log
Error Number : 0
Error Description :
----------------------------------------------------------------------------------
Product : SQLXML4
Product Version (Previous): 2047
Product Version (Final) : 3042
Status : Success
Log File : C:Program FilesMicrosoft SQL Server90Setup BootstrapLOGHotfixRedist9_Hotfix_KB921896_sqlxml4.msi.log
Error Number : 0
Error Description :
----------------------------------------------------------------------------------
Product : Backward Compatibility
Product Version (Previous): 1704
Product Version (Final) : 2004
Status : Success
Log File : C:Program FilesMicrosoft SQL Server90Setup BootstrapLOGHotfixRedist9_Hotfix_KB921896_SQLServer2005_BC.msi.log
Error Number : 0
Error Description :
----------------------------------------------------------------------------------
Product : Microsoft SQL Server VSS Writer
Product Version (Previous): 2047
Product Version (Final) : 3042
Status : Success
Log File : C:Program FilesMicrosoft SQL Server90Setup BootstrapLOGHotfixRedist9_Hotfix_KB921896_SqlWriter.msi.log
Error Number : 0
Error Description :
----------------------------------------------------------------------------------
**********************************************************************************
Summary
No passive nodes were successfully patched
Exit Code Returned: 11009
In desperate need of implementing a solution where the customer has purchased a CMS to replace their corporate site and wants to use MSSQL as the DB server type. I have 3 servers allocated to me to complete this and I could use some advice on the best setup.
THey're running windows 2003 standard server along with sql 2000 standard server. The intended plan is for the 2 servers to become web servers with the last server becoming the sql server. The CMS will reside soley on the sql server and the content for the web site on the seb server(s).
What I need to know is if it's possible to set up an active/passive node to accommadate this using the items mentioned above? From what I've been reading sql 2000 enterprise does clustering but I'm hoping this version of sql can be used for something.
Any responses are appreciated.
This is the 1st time we are building a active/passive cluster with 1 node each. we usually install default instance and setup domain account as service account which will have an spn delegated. Now for active/passive cluster is it ok to use same domain account as service account for both clusters with both creating as default instance again as the windows was built as SERVER1 and SERVER2.
View 4 Replies View RelatedFew questions on a SQL Server 2012 two node active/passive cluster installation on Win2012.
1. What are the permissions required for the user used to install SQL Server 2012 cluster. Does it need to have any rights on DC or anywhere else apart from the local nodes ?
2. Can we give ANY meaningful name to "SQL Server Network Name" during installation ? Do we need to manually configure it anywhere else before or after the installation ?
3. On what scenarios we need to check/uncheck DHCP check box ?
It is an active passive cluster which doesn’t allow any testing. All instances have to be failed over together, we aren’t allowed to just failover 1 even for testing purposes. Node 1 is the active node and we can failover to node 2 for 30 days free of charge but services have to then be failed back.
We need to run the cluster with node 1 as the primary node always and 2 just use for failover testing or for less than 30 day periods whilst performing cluster patch upgrades etc.
Now l am sure we could fail over 1 instances at a time for testing and diagnosing issues plus if add a new instance that's not production to get to the platform level as the rest of the instances this would avoid taking production down in the fail over process.
let me know apart from the following what else is required
2 for private network
2 for public network ......
1 for virtual server/windows cluster ip which is used to connect application
We have a SQL 2014 active passive cluster with 5 instances. When the cluster was installed one of the nodes was a virtual machine. As we started to have problems and this is not a Microsoft supported configuration we decided to replace the virtual node with a phyiscal one. On 3 of these 5 instances we configured static ports (1433 TCP) this was required for applications and firewall implementation.
Now with the physical node joined to the cluster we have issues with these three instances. Whenever one of these instances is moved to the passive node the server authentication is changed from mixed to windows only. I'm no SQL expert at all but to me it looks like the configuration of the instances are not replicated to the passive node? I found some similar problems on the net but these are mostly under sql 2008.
Hi all,
I have some doubt about the IP Required for configuring cluster(both Window and SQL server)
Details :
----------
How Many IP(Public & Private) Required for 2 Node Active/Passive both window and SQL server Cluster ?
IP(Public & Private) Required :
---------------------------------------
1 : For Window Clustering : 2 node Active/Passive Cluster ? How many ip ?
2 : For Sql Server Clustering : 2 node Active/Passive Cluster ?how many ip ?
3 : Is there any mathematics for that ? How to analyse the IP requirement ?
Thanks
I have upgraded our test server and on non cluster production machine. My next server is a cluster and I don't have a test cluster server. Do I upgrade the active node and that is all or am I going to need to fail it over and upgrade the other node.
Also the prerequesite for the upgrade advisor is .net 2.0 I am going to up that on each server one at a time but I am only going to add the upgrade advisor to one node is that ok.
I read the SP1 documentation and it clearly states only patch the active node and do not patch the inactive nodes.
Could someone give me an ideal of what it takes to upgrade the memory in my cluster. Is it as easy has upgrading the passive node, switching the nodes, then upgrading the other server. And do I need to re-configure the windows cluster. And will both server need to be down at the same time at any point.
Or is their more to the process? Thanks for any assistance.
btw, I currently have 16mb of RAM in each node.
Anyone know of any differences in an active/active cluster and an active/passive cluster that would cause an application to work on an active/passive environment but not an active/active environment?
View 8 Replies View RelatedGreetings,
I need to install the SSIS components on the referenced database server. I believe the SSIS components are cluster aware, so I was planning on just doing add/remove and selecting the components. Rather than breaking the cluster apart to patch the components back to SP1, I was thinking of just running the SP2 install right over the top of the running cluster to bring everything up to SP2.
I'm looking for any suggestions/comments on whether this is the proper way to proceed or if I'm going to have a problem.
TIA
Environment: Windows Advanced Server with SP2. SQL 2K Enterprise edition with SP2.
There are three disk drives in my shared array named E:, F:, and H:.
When I use EM (Enterprise Manager) to create a job (like a backup job), the drop down box contains only drive F:.
Drive F: was the drive specified during the install process for data files.
Drive C: and D: also exist. Drive D: was specified during the install process for the program files.
It seems to me that drop down boxes in EM which show disk drives should actually show me the following drives: C:, D:, E:, F:, and H:.
Any ideas why EM may not be showing all the disk drives.
TIA solart
I have Active Active Cluster with 2 nodes , on the first node I can execute the queries, but when I trying to execute query or just open a DB to see the tables I getting error:"The Database XX is not accessible. (ObjectExplorer)".
View 5 Replies View RelatedWe have an application that is experiencing I/O contention,particularly in tempdb but also in two other databases. The data isstored on mirrored PowerVault 220's, each with 10 of 14 possible disks.The PowerVaults are JBOD devices, not true SANs. The current config hasfour separate groups of physical drives assigned to distinct logicaldrives for log files, tempdb, and the two app dbs. This means, forexample, that tempdb resides on one mirrored drive. The standard advicewhen faced with disk contention is to add spindles if possible. With 4empty slots, we would presumably assign the new physical disks to themost stressed db, e.g. tempdb.An alternative arrangement would be to combine all the physical drivesinto one logical drive, and put all the files, log and data, onto thesingle logical drive. The hope for this configuration is that thePowerVault would automagically distribute the data among the drivessuch that all drives were in use, all spindles reading and writing atmaximum capacity when necessary. It is my understanding thatfull-featured SANs, like NetApps and EMC models, do this. My questionis whether this configuration is best for the PowerVault, as well. Oris this the essential difference between JBOD and a true SAN?Has anyone tried both arrangements?Advice is much appreciated.
View 2 Replies View Relatedhello,all
I am new to Sql 2000,I installed sql 2000 database in C disk,but Now I found my C disk space is smaller than before,So I want to move my databse(include data and structure) from C Disk to D Disk(its space is very large) .
is it possible to do it ?
if its can be done ,do I need to change my asp.net program source code (exp: chaneg my crystal report connectstring ) ?
thanks in advanced!
All,
I am using Reporting Services 2005. One of my reports is getting the following error when I try to export to Excel. It will export to .CSV though.
"Destination array was not long enough. Check destIndex and length, and the array's lower bounds."
Any suggestions would be greatly appreciated. Please copy me at machelle.a.chandler@intel.com.
Machelle
I have a stored procedure that has a paramter that accepts a string of values. At the user interface, I use a StringBuilder to concatenate the values (2,4,34,35,etc.) I would send these value to the stored procedure. The problem is that the stored procedure doesn't allow it to be query with the parameter because the Fieldname, "Officer_UID" is an integer data type, which can't be query against parameter string type.
What would I need to do to convert it to an Integer array?
@OfficerIDs as varchar(200)
Select Officer_UID From Officers Where Officer_UID in (@OfficerIDs)
Thanks
If I return the Average, Minimum, and Maximum values for the counter Physical Disk: Avg. Disk Queue Length, and those values are 10, 0, 87 respectively, which value do I use to compute the Avg. Disk Queue Length for a 4 disk array(RAID 10): Average, Minimum, or Maximum? The disk(lun) is on a SAN.
-- Initialize Control Mechanism
DECLARE@Drive TINYINT,
@SQL VARCHAR(100)
SET@Drive = 97
-- Setup Staging Area
DECLARE@Drives TABLE
(
Drive CHAR(1),
Info VARCHAR(80)
)
WHILE @Drive <= 122
BEGIN
SET@SQL = 'EXEC XP_CMDSHELL ''fsutil volume diskfree ' + CHAR(@Drive) + ':'''
INSERT@Drives
(
Info
)
EXEC(@SQL)
UPDATE@Drives
SETDrive = CHAR(@Drive)
WHEREDrive IS NULL
SET@Drive = @Drive + 1
END
-- Show the expected output
SELECTDrive,
SUM(CASE WHEN Info LIKE 'Total # of bytes : %' THEN CAST(REPLACE(SUBSTRING(Info, 32, 48), CHAR(13), '') AS BIGINT) ELSE CAST(0 AS BIGINT) END) AS TotalBytes,
SUM(CASE WHEN Info LIKE 'Total # of free bytes : %' THEN CAST(REPLACE(SUBSTRING(Info, 32, 48), CHAR(13), '') AS BIGINT) ELSE CAST(0 AS BIGINT) END) AS FreeBytes,
SUM(CASE WHEN Info LIKE 'Total # of avail free bytes : %' THEN CAST(REPLACE(SUBSTRING(Info, 32, 48), CHAR(13), '') AS BIGINT) ELSE CAST(0 AS BIGINT) END) AS AvailFreeBytes
FROM(
SELECTDrive,
Info
FROM@Drives
WHEREInfo LIKE 'Total # of %'
) AS d
GROUP BYDrive
ORDER BYDrive
E 12°55'05.25"
N 56°04'39.16"
Hello,
I am trying to setup a test cluster and am having an issue. When I try to create the resource of a physical disk it takes both the drive e: and drive q: and doesn't seperate them into two physical disks as resources. This means when I try to associate the quorum disk it links the to physcial disk resource of drive e and q. Then when I try to install SQL2k5 I get the warning about installing SQL on the quorum disk. Am I missing something? Is there a way to seperate e and q onto two physical disk resources so I can specifically associate the quorum to q and the sql to e or should I be setting the quorum disk to a majority node set? Thanks in advance.
John
I have a table with the following columns employeeSessionID, OpDate, OpHour, sessionStartTime, sessionCloseTime. I need to see how many users remain active per hour. I can calculate how many logged in per hour, but I am stumped on how to count how many are active per hour. I have a single table that stores login data. I have created a query that pulls out the only the data needed from the table into a temp table using this query. Also note it is possible that the sessionCloseTime is null if the device has not been logged out this would need to be counted a active.
TABLE NAME #empSessionLog Contains the time stamp data OpDate, sessionStartTime and sessionCloseTime.
OpDatesessionStartTimesessionCloseTime
2015-01-202015-01-20 14:32:59.1302015-01-20 14:33:14.6299166
2015-01-202015-01-20 06:58:33.7302015-01-20 15:27:16.9133442
2015-01-202015-01-20 09:56:22.8402015-01-20 17:56:29.7555853
2015-01-202015-01-20 05:59:18.6132015-01-20 14:05:19.0426707
[code]....
can see how many sessions logged in per hour with the following statement:
SELECT
opDate,
FORMAT(DATEPART(HOUR, sessionStartTime), '00') AS opHour,
Count(*) AS Total
FROM #empSessionLog
Group BY opDate, FORMAT(DATEPART(HOUR, sessionStartTime), '00')
Order BY opDate, FORMAT(DATEPART(HOUR, sessionStartTime), '00') ASCResults:
opDateopHourTotal
2015-01-20041
[code]....
Where I am stuck is how do I count the sessions that remain active per hour until the session is closed with the sessionCloseTime.
Hi
I am newbie in SQL Clustering. I have set up a Windows Server Cluster with 2 nodes and am having the following problem with Physical Disk resource for cluster groups:
My Default Cluster Group (named Cluster Group) has IP Address, Network Name, Physical Disk and MSDTC resources. In addition to that my Default SQL Server instance resources are also in this group. I had this initial set up for Active/Passive mode.
Now I am trying to set up a SQL Cluster in Active/Active mode. For this I have to install another instance of SQL Server in the existing cluster and make a separate cluster group for its resources. I made a new cluster group (SQL Instance Group) with an IP Address and a Network Name resource for this new instance but I dont have any Physical Disk resource to allocate to it. As such while installing the SQL Server Instance I get stuck when I'm asked to select the quorum disk to be used.
Is it possible to configure two quorum disks, one for each group?
What's the concept of dedicated disks resource for each sql instance in a group? Is this same as the quorum disk? If this is not a shared disk how do I configure a dedicated disk resource for my second cluster group (SQL Instance Group)?
Anyone could please help me out with this?
Hi folks,
We are going thru the process of scoping an active/active cluster at one site.
I was wondering whether there will be any issues with mirroring (DB by DB) off the cluster into non clustered server at an alternate DRP site.
Regards, Brian
Sutherland