Sql Job Schedules
Jan 25, 2007
Could anyone tell me how to create a scheduled job in sql server 2005, I have a bunch of queries thaty i want to run on a table and i want to automate it, does anyone know of any tutorials on the internet or any helpful links
Thanks
View 1 Replies
Jul 6, 2006
I have set up a DTS to import data from an Access database to a server which is running SQL. It works alright if I execute the DTS, but if I set it to run as a scheduled task, it tells me that the path to the access db is not valid, and that I should make sure the path name is spelled correctly and that I am connected to the server on which the file resides... so obviously it's not a spelling issue (since when I execute it, it works), but a security issue. Anyone have any ideas?
Thanks a lot,
Tex
View 9 Replies
View Related
Aug 27, 2007
I am looking for a script that will show me the job schedule for the jobs on a given server, in plain english. It would look something like this:
Job Name Schedule
Job 1 M,Tu,W,Th,F 3:10 pm
Job 2 1st Day Month 6:00 am
Job 3 Daily 4:15 pm
I have looked at the job schedule table and have decipher some of it, but not all. Can anyone point me in the right direction?
Thank you!!
Jim Youmans
St. Louis, Missouri, USA
View 4 Replies
View Related
Aug 31, 2006
Below is the script of a Job called "eFIMS_SendEmail" that I wish torun. The intention is that every day of the week the job will executea SPROC at timed intervals. For example, the SundayRun schedule willrun once every 1 hours from 00:30:00 to 23:59:59However, the clients have stated that they want an interface to this toenable them easily to change the start time and frequency interval foreach day. It's an easy matter for me to paint them a form from withinthe target application to enable the user to enter the start time andinterval for each day. I can then pass these as parameters to a SPROC.How can I use these values to change the schedules for the job? Forexample, if wanted to change SundayRun from once every 1 hours to onceevery 30 mins? I know I could do it the hard way, by using stringmanipulation (e.g. find string 'SundayRun', then look for the nextoccurrence of @active_start_time, @freq_subday_type,@freq_subday_interval etc. and do some replacement) but this seemssomewhat tricky.Many thanksEdward-- Script generated on 8/31/2006 9:27 AM-- By: sa-- Server: BISMARKBEGIN TRANSACTIONDECLARE @JobID BINARY(16)DECLARE @ReturnCode INTSELECT @ReturnCode = 0IF (SELECT COUNT(*) FROM msdb.dbo.syscategories WHERE name =N'[Uncategorized (Local)]') < 1EXECUTE msdb.dbo.sp_add_category @name = N'[Uncategorized (Local)]'-- Delete the job with the same name (if it exists)SELECT @JobID = job_idFROM msdb.dbo.sysjobsWHERE (name = N'eFIMS_SendEmail')IF (@JobID IS NOT NULL)BEGIN-- Check if the job is a multi-server jobIF (EXISTS (SELECT *FROM msdb.dbo.sysjobserversWHERE (job_id = @JobID) AND (server_id <0)))BEGIN-- There is, so abort the scriptRAISERROR (N'Unable to import job ''eFIMS_SendEmail'' since thereis already a multi-server job with this name.', 16, 1)GOTO QuitWithRollbackENDELSE-- Delete the [local] jobEXECUTE msdb.dbo.sp_delete_job @job_name = N'eFIMS_SendEmail'SELECT @JobID = NULLENDBEGIN-- Add the jobEXECUTE @ReturnCode = msdb.dbo.sp_add_job @job_id = @JobID OUTPUT ,@job_name = N'eFIMS_SendEmail', @owner_login_name = N'sa', @description= N'No description available.', @category_name = N'[Uncategorized(Local)]', @enabled = 0, @notify_level_email = 0, @notify_level_page =0, @notify_level_netsend = 0, @notify_level_eventlog = 2,@delete_level= 0IF (@@ERROR <0 OR @ReturnCode <0) GOTO QuitWithRollback-- Add the job stepsEXECUTE @ReturnCode = msdb.dbo.sp_add_jobstep @job_id = @JobID,@step_id = 1, @step_name = N'SendEmail', @command = N'EXECstpSendEmailConfirmation', @database_name = N'194-eFIMS', @server =N'', @database_user_name = N'', @subsystem = N'TSQL',@cmdexec_success_code = 0, @flags = 4, @retry_attempts = 0,@retry_interval = 1, @output_file_name = N'', @on_success_step_id = 0,@on_success_action = 1, @on_fail_step_id = 0, @on_fail_action = 2IF (@@ERROR <0 OR @ReturnCode <0) GOTO QuitWithRollbackEXECUTE @ReturnCode = msdb.dbo.sp_update_job @job_id = @JobID,@start_step_id = 1IF (@@ERROR <0 OR @ReturnCode <0) GOTO QuitWithRollback-- Add the job schedulesEXECUTE @ReturnCode = msdb.dbo.sp_add_jobschedule @job_id = @JobID,@name = N'SundayRun', @enabled = 1, @freq_type = 8, @active_start_date= 20060831, @active_start_time = 3000, @freq_interval = 1,@freq_subday_type = 8, @freq_subday_interval = 1,@freq_relative_interval = 0, @freq_recurrence_factor = 1,@active_end_date = 99991231, @active_end_time = 235959IF (@@ERROR <0 OR @ReturnCode <0) GOTO QuitWithRollbackEXECUTE @ReturnCode = msdb.dbo.sp_add_jobschedule @job_id = @JobID,@name = N'MondayRun', @enabled = 1, @freq_type = 8, @active_start_date= 20060831, @active_start_time = 3000, @freq_interval = 2,@freq_subday_type = 4, @freq_subday_interval = 30,@freq_relative_interval = 0, @freq_recurrence_factor = 1,@active_end_date = 99991231, @active_end_time = 235959IF (@@ERROR <0 OR @ReturnCode <0) GOTO QuitWithRollbackEXECUTE @ReturnCode = msdb.dbo.sp_add_jobschedule @job_id = @JobID,@name = N'TuesdayRun', @enabled = 1, @freq_type = 8, @active_start_date= 20060831, @active_start_time = 4000, @freq_interval = 4,@freq_subday_type = 4, @freq_subday_interval = 40,@freq_relative_interval = 0, @freq_recurrence_factor = 1,@active_end_date = 99991231, @active_end_time = 235959IF (@@ERROR <0 OR @ReturnCode <0) GOTO QuitWithRollbackEXECUTE @ReturnCode = msdb.dbo.sp_add_jobschedule @job_id = @JobID,@name = N'WednesdayRun', @enabled = 1, @freq_type = 8,@active_start_date = 20060830, @active_start_time = 3000,@freq_interval = 8, @freq_subday_type = 4, @freq_subday_interval = 30,@freq_relative_interval = 0, @freq_recurrence_factor = 1,@active_end_date = 99991231, @active_end_time = 235959IF (@@ERROR <0 OR @ReturnCode <0) GOTO QuitWithRollbackEXECUTE @ReturnCode = msdb.dbo.sp_add_jobschedule @job_id = @JobID,@name = N'ThursdayRun', @enabled = 1, @freq_type = 8,@active_start_date = 20060831, @active_start_time = 3500,@freq_interval = 16, @freq_subday_type = 4, @freq_subday_interval = 35,@freq_relative_interval = 0, @freq_recurrence_factor = 1,@active_end_date = 99991231, @active_end_time = 235959IF (@@ERROR <0 OR @ReturnCode <0) GOTO QuitWithRollbackEXECUTE @ReturnCode = msdb.dbo.sp_add_jobschedule @job_id = @JobID,@name = N'FridayRun', @enabled = 1, @freq_type = 8, @active_start_date= 20060831, @active_start_time = 3000, @freq_interval = 32,@freq_subday_type = 4, @freq_subday_interval = 30,@freq_relative_interval = 0, @freq_recurrence_factor = 1,@active_end_date = 99991231, @active_end_time = 235959IF (@@ERROR <0 OR @ReturnCode <0) GOTO QuitWithRollbackEXECUTE @ReturnCode = msdb.dbo.sp_add_jobschedule @job_id = @JobID,@name = N'SaturdayRun', @enabled = 1, @freq_type = 8,@active_start_date = 20060831, @active_start_time = 0, @freq_interval =64, @freq_subday_type = 8, @freq_subday_interval = 1,@freq_relative_interval = 0, @freq_recurrence_factor = 1,@active_end_date = 99991231, @active_end_time = 235959IF (@@ERROR <0 OR @ReturnCode <0) GOTO QuitWithRollback-- Add the Target ServersEXECUTE @ReturnCode = msdb.dbo.sp_add_jobserver @job_id = @JobID,@server_name = N'(local)'IF (@@ERROR <0 OR @ReturnCode <0) GOTO QuitWithRollbackENDCOMMIT TRANSACTIONGOTO EndSaveQuitWithRollback:IF (@@TRANCOUNT 0) ROLLBACK TRANSACTIONEndSave:
View 1 Replies
View Related
Mar 28, 2014
I am doing some general housekeeping for a couple of our SQL boxes in the Development environment. All the databases are set to Simple recovery mode. No need in anything else for these boxes. I have a database on all the boxes named "DatabaseMaintenance" Keeps things like all the sprocs for any type of database maintenance, etc....
I would like to schedule a single sproc that is located in the DatabaseMaintenance database to shrink the Transaction logs on a set schedule. They sometimes grow quite large while testing and developing. The thing that I cannot seem to get around, is when using the ShrinkFile command, one must use the Log Name. If this code is in a sproc that is located in the DatabaseMaintenance database, it will fail when attempting to call out to a different database. Because the Log does not exist on the database that the sproc is located.
How can I get around this small dilemma? There are only about 10 databases per box. To a point we really do not care what happens to them. They are on a Full backup schedule daily, just to keep the objects. As I stated previously, the logs will still grow huge at times while pumping data.
Is there a way to create a piece of code that will run against each database on the server, and be stored in a single database? Other than the system databases of course.
View 5 Replies
View Related
Feb 27, 2007
As best I can see, the new database maintenance tool allows you to set only one schedule as you work through the wizard. (For that matter if you put multiple tasks in the database, you can not fire them off individually on a different schedule.)
The solution is - of course - a different job for each task you want to have a specific schedule. Or design a database to control the workflow (possible, and arguably easier to maintain, but way too complicated, I think.)
Or perhaps I am missing something. So does anyone know of a better way to do that "All-in-one" kind of database maintenance - just like ti was in 2000?
View 1 Replies
View Related
Feb 6, 2007
Hi,
I have been trying to figure this out for a while. I have a report that should run at 9AM, 12 Noon and 2PM every weekday. Due to the complexity of the report, I'm using snapshots. Since the lowest gap is 2 hours, I currently have it configured to create the snapshot every two hours. Since this is running all day, my servers are taking a lot of strain. In the report manager help, it suggests creating three daily schedules for the report. I cannot find a way to create more than one schedule for a report. Please let me know how I can do this. Any help will be highly appreciated.
Thanks,
Anand
View 7 Replies
View Related
Jul 16, 2015
We are running into an issue where we are unable to run scheduled reports from SharePoint in the "Manage Shared Schedules" sections of any given site in our site collection (<site url>/_layouts/15/ReportServer/ScheduleList.aspx). Reports are able to be generated manually, but never run when scheduled from SharePoint.We are encountering the following error in the SharePoint logs for our server.
Microsoft.ReportingServices.Library.InvalidReportServerDatabaseException: , Microsoft.ReportingServices.Library.InvalidReportServerDatabaseException:
The version of the report server database is either in a format that is not valid, or it cannot be read. The found version is 'Unknown'. The expected version is '162'.; Here is the background in our environment:
SharePoint App Server - Server 2012 R2 running SharePoint 2013 Application server - running SSRS SharePoint Integrated configured through Central Admin.SharePoint SQL Server - Server 2012 R2 running SQL 2012 SP1 for the SharePoint farm - hosts the Reporting Services databases.I have run the script within the Central Admin > Provision Subscriptions and Alerts to give appropriate permissions the the account in use. Also the reporting services databases were created new as part of the install, so they were not migrated from a previous version.
View 3 Replies
View Related